ITUInternationalFrançais Español
OurNewsEventsPublicationsSiteAbout
Print Version
ITU
Home Page : Publications
Contributions to WP 4B (1996-97)

[4B/1] Numbering of Documents
[4B/6] Report of the Special Rapporteur's Meeting (26 Feb. - 1 March 1996, Turin, Italy): Part 1 (Pages 1 - 31)
[4B/2] From Sg 13, WP 4/13, Rapporteur's meeting Nov. 13-17, 1995
[4B/6] Report of the Special Rapporteur's Meeting (26 Feb. - 1 March 1996, Turin, Italy): Part 2 (Pages 32 - 104)
[4B/3-9A/28] Liaison statement from ITU-R WP 4/13 (Transmission of framed ATM cell streams over satellite)
[4B/6] Report of the Special Rapporteur's Meeting (26 Feb. - 1 March 1996, Turin, Italy): Part 3 (Pages 105 - 158)
[4B/4-4A/58] Liaison statement from WP 8D - Performance objectives for deeder links of non-geostationary MSS systems above 1 GHz
[4B/5-4A/61] Liaison statement from WP 8D - WP 8D Rapporteur and Correspondence Group of Non-GSO feeder link performance objectives
[4B/7] Liaison statement to WP 4B and WP 8D - Development of performance objectives and interference criteria for frequency sharing between GSO FSS networks and NGSO MSS feeder links
[4B/8 - 8D/80] Liaison statement from WP 4A - Development of performance objectives and interference criteria for frequency sharing between GSO FSS networks and NGSO MSS feeder links
[4B/9] Liaison statement from WP 9B to the joint Rapporteur Group on GII (ITU-T SG 13)
[4B/10] Liaison statement from ITU-T SG 7 - Draft Recommendation X.361 (Q. 6/7)
[4B/11] Proposed rev. to PDNR ITU-R Rec. S.XZ/4: Network management functionality for digital satellite systems forming part of SDH transport networks in the fixed satellite service
[4B/12] Proposed rev. to PDNR ITU-R Rec. S.XZ/4: Object class definitions for satellite SDH network elements - Part 1
[4B/13] Proposed Rev. to PDNR Rec. ITU-R S.XZ/4: Object class definitions for satellite SDH network elements - Part 2
[4B/14] Proposed rev. to PDNR ITU-R Rec. S.XZ/4: Object class definitions for satellite SDH network elements - Part 3
[4B/15] - Liaison statement from ITU-T Study Group 15
[4B/16-4A/82] Correspondence Groupe on WP 8D correspondence Group on non-GSO MSS feeder link performance objectives
[4B/16-c1-4A/82] Corrigendum 1 to Doc. 4A/82-4B/16 Correspondence Group on Working Party 8D Correspondence Group on non-GSO MSS feeder link performance objectives
[4B/17-4A/87] Ka-band carrier parameters and performance objectives
[4B/19] Development of additional performance criteria for satellite systems using the 20/30 GHz frequency bands
[4B/20] Physical and ATM layer performance test results measured on 45 Mb/s IDR satellite links
[4B/21] Revised text for preliminary draft new Rec. on allowable error performance for hypothetical reference digital paths for fixed satellite service systems operating in the band 15-31 GHz
[4B/22] Report of the special Rapporteur on performance requirements
[4B/23] Comments on preliminary guideline of performance requirements for FSS systems operating in the 30/20 GHz bands
[4B/25-4A/104] Characteristics of a GSO FSS Ka-band satellite network
[4B/26] Preliminary results on the effect of errors on MPEG-2 over AAL-5
[4B/33] Report of the seventh of WP 4B (Rio de Janeiro, Brazil, 23-27 September 1996)
[4B/34] Liaison statement to WP 4B (Attachment Doc. 8D/TEMP/107(Rev.1))
[4B/35] Proposed modifications to Rec. ITU-R 521-2
[4B/36] Preliminary draft new Rec. ITU-R S.[4B/XC] (S.ATM) - Error performance for asynchronous transfer mode (ATM) via satellite
[4B/37] Forward error correction performance for onboard ATM switching satellite systems
[4B/38] Guidelines for the creation and revision of ITU-R performance Recommendations
[4B/39-4A/246 ] Status Report on activities
[4B/39-c1-4A/246] Corrigendum 1 to Doc. 4A/246-4B/39 - Replacement of item 6, page 2
[4B/43-1] Report of the eighth meeting of WP 4B (Geneva, Switzerland, 15-21 January 1997
[4B/43-2] Report of the eighth meeting of WP 4B (Geneva, Switzerland, 15-21 January 1997
[4B/44] Liaison statement to ITU-R Working Parties 4B & 9A - Reply to liaison from ITU-R WP 4B - Measurement considerations for I.356 objectives
[4B/45] Liaison statement to ITU-R Working Parties 9A & 4B - Reply to liaison - Measurements on ATM performance parameters
[4B/46] ITU-T SG 13 - Request for information on availability performance
[4B/47] Liaison to ITU-R SG 4, WP 4B - Revision of ITU-T Recommendation G.811
[4B/48-1] Report of the sixth meeting of WP 4B (Bern, 11-19 Jan. 1995): Part 1 (pp 1 - 52)
[4B/48-2] Report of the sixth meeting of WP 4B (Bern, 11-19 Jan. 1995): Part 2 (pp 53 - 74)
[4B/48] Letter of Mr. Barclay, Chairman of ITU-R Study Group 3
[4B/51-9A/63] Liaison statement to ITU-R WPs 4B and 9A - Development and coordination on an availability performance database
[4B/53] (1995) Liaison to ITU-R WPs 4B and 9A
Top - Feedback - Privacy - Copyright © ITU 2001 All Rights Reserved
Contact for this page : webmaster@itu.int
Updated : 2007-03-30