International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-R : WP9B : Contributions : 83 Recently posted -  Search Meeting Documents
   
[83]  Report on the meeting of Working Party 9B, Geneva, 20-28 September 2004

Format

Size

Posted

English

Word  

988160 bytes 2004-10-7 [83] Annex 14 - Working document toward a draft new Report - Fixed service applications using frequency bands above 3 000 GHz (Draft new Question [BBB/9])

Word  

1091584 bytes 2004-10-7 [83] Annex 13 - Working document on the preliminary consideration on applications of fixed wireless systems operating in the bands above 57 GHz

Zip (Document)  

909402 bytes 2004-10-7 [83] Annex 13 - Working document on the preliminary consideration on applications of fixed wireless systems operating in the bands above 57 GHz

Word  

182784 bytes 2004-10-5 [83] Annex 12 - Working document towards a preliminary draft new Recommendation - Technical and operational requirements for broadband wireless access in the fixed service

Word  

286720 bytes 2004-10-12 [83] Annex 11 - Working document toward a preliminary draft revision of Recommendation ITU-R F.1244 - Fixed service applications of radio local area networks (RLANs)

Word  

411136 bytes 2004-10-5 [83] Annex 10 - Working document towards a preliminary draft revision of Recommendation ITU-R F.1569 - Reference radiation patterns of multi-beam antennas for high altitude platform stations in the 28 and 31 GHz bands

Word  

1152000 bytes 2004-10-7 [83] Annex 9 - Preliminary draft new Report ITU-R F.[9B/FWA-IP+ATM] - Design techniques applicable to broadband fixed wireless access (FWA) systems conveying Internet protocol (IP) packets or asynchronous transfer mode (ATM) cells

Zip (Document)  

465777 bytes 2004-10-7 [83] Annex 9 - Preliminary draft new Report ITU-R F.[9B/FWA-IP+ATM] - Design techniques applicable to broadband fixed wireless access (FWA) systems conveying Internet protocol (IP) packets or asynchronous transfer mode (ATM) cells

Word  

3116544 bytes 2004-10-6 [83] Annex 8 - Preliminary draft new Report ITU-R F.[9B/IMT-TRANSPORT] - Examples of fixed service use in the transport network in IMT-2000

Zip (Document)  

1184474 bytes 2004-10-7 [83] Annex 8 - Preliminary draft new Report ITU-R F.[9B/IMT-TRANSPORT] - Examples of fixed service use in the transport network in IMT-2000

Word  

2549248 bytes 2004-10-5 [83] Annex 7 - Preliminary draft new Recommendation ITU-R F.[HAPS-RRS] - Methodology to evaluate interference from fixed service system using high altitude platform stations (HAPS) to radio-relay system in the bands above 3 GHz

Word  

72192 bytes 2004-10-5 [83] Annex 6 - Preliminary draft new Recommendation ITU-R F.[9B/BWA] - Radio interface standards for broadband wireless access systems in the fixed service operating below 66 GHz

Word  

122368 bytes 2004-10-7 [83] Annex 5 - Liaison statements to other fora

Word  

65536 bytes 2004-10-13 [83] Annex 4 - Summaries of draft Recommendations

Word  

123904 bytes 2004-10-7 [83] Annex 3 - List of output documents

Word  

125440 bytes 2004-10-7 [83] Annex 2 - Status of Questions assigned to Working Party 9B

Word  

105984 bytes 2004-10-7 [83] Annex 1 - Structure of work

Word  

142848 bytes 2004-10-13 [83]  - Chairman's report
 

Document :

ITU-R WP9B  Contribution  83

Title :

Report on the meeting of Working Party 9B, Geneva, 20-28 September 2004

Date :

2004-10-01

Source :

Chairman, WP 9B

Access :

Restricted to TIES users [ITU-R]

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2004-11-09