International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-R : R23-WP5D : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R R23-WP5D  C 

ITU-R R23-WP5D

IMT Systems

Results:116 total items.
Result page:  1 - 2 - 3  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 116 ]  
 
Liaison statement to Study Groups 5 and 7 (copy to Study Group 1 for information) - Activities in response of Resolution 219 (Bucharest, 2022) and Resolution ITU-R 74     SG 4     2024-05-10
[ 115 ]  
 
Proposed organization of the work of Study Group 5     Chair, SG 5     2024-05-10
[ 114 ]  
 
Report on disaster relief     Disaster Relief Liaison Rapporteur     2024-05-06
[ 113 ]  
 
Liaison statement on results of the sixth meeting of the FG-MV     ITU-T FG-MV     2024-05-06
[ 112 ]  
 
Liaison statement to Working Parties 3L, 4B, 5A, 5C, 5D, 7B, and 7C (copy to Working Party 4A for information, and action if any) - Relevant technical information to support studies under WRC-27 agenda item 1.14     WP 4C   AI1.14   2024-05-01
[ 111 ]  
 
Liaison statement to Working Parties 3L, 3M, 4A, 4B, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D - Technical information to support the studies for WRC-27 agenda item 1.13     WP 4C   AI1.13   2024-05-01
[ 110 ]  
 
Liaison statement to Working Parties 3L, 3M, 4B, 5A, 5B, 5C, 5D, 7B, 7C and 7D (copy to Working Party 4A for information, and action if any) - Relevant technical information to support studies under WRC-27 agenda item 1.12     WP 4C   AI1.12   2024-05-01
[ 109 ]  
 
Liaison statement to Working Parties 3L, 3M, 4A, 4B, 5A, 5B, 5C, 5D, 7B, 7C and 7D - WRC-27 agenda item 1.11     WP 4C   AI1.11   2024-05-01
[ 108 ]  
 
Initial reply liaison statement to Working Party 5D - Relevant technical information to support studies under WRC-27 agenda item 1.7     WP 4C   AI1.7   2024-05-01
[ 107 ]  
 
Reply liaison statement to Working Party 5D - Work related to WRC-27 agenda item 1.13     WP 4C   AI1.13   2024-05-01
[ 106 ]  
 
Cognitive radio spectrum access and resource management for reconfigurable communication networks for future networks     General Authority of Communication and Informatics (Libya)     2024-04-28
[ 105 ]  
 
Liaison statement to Radiocommunication Study Groups and Working Parties (copy for information to ITU-T and ITU-D Study Groups)     Chair, CCV     2024-04-22
[ 104 ]  
 
Liaison statement on deliverables of FG-TBFXG     FG-TBFxG     2024-04-18
[ 103 ]  
 
Contribution for ITU-R M.[IMT-2020.UNWANT.(MS/BS)] regarding DECT-2020 NR     European Telecommunications Standards Institute (France)     2024-04-17
[ 102 ]  
 
Initial submission of updated material on "DECT 5G-SRIT" toward revision 3 of Recommendation ITU-R M.2150     European Telecommunications Standards Institute (France)     2024-04-17
[ 101 ]  
 
Liaison statement on consent of draft new Recommendation ITU-T Y.3207 (ex Y.FMSC-INCA) - Fixed, mobile and satellite convergence - Integrated network control architecture framework for IMT-2020 networks and beyond     ITU-T SG13     2024-04-11
[ 100 ]  
 
Liaison statement on agreement of new Supplement 81 to ITU-T Y.3200-Series (ex Y.Sat-Use-Cases) - Use cases of satellite communications in developing countries     ITU-T SG13     2024-04-11
[ 99 ]  
 
Liaison statement on invitation to update the information in the IMT-2020 and Beyond roadmap     JCA IMT2020     2024-04-10
[ 98 ]  
 
Liaison statement on initiation of the draft new technical Report ITU-T TR.URCN-REQ - Service requirements of ubiquitous real time communication network for future networks     ITU-T SG13     2024-04-09
[ 97 ]  
 
Liaison statement on results of the fifth meeting of the FG-MV     ITU-T FG-MV     2024-04-02
[ 96 ]  
 
Liaison statement to Working Parties 4A, 4C and 5A (copy to Working Parties 1B, 3J, 3M, 5B and 5D for information) - WRC-27 agenda item 1.16     WP 7D   AI1.16   2024-03-28
[ 95 ]  
 
Liaison statement to Working Parties 3J and 3M (copy to Working Parties 1B, 4A, 4C, 5A, 5B, and 5D for information) on WRC-27 agenda items 1.16 and 1.18     WP 7D   AI1.18, AI1.16   2024-03-28
[ 94 ]  
 
Reply liaison statement to Working Party 5D - Update to preliminary draft new Report ITU-R RA.[RAS-IMT-COMPAT-43-GHZ]     WP 7D     2024-03-28
[ 93 ]  
 
Liaison statement for action to Working Parties 3J, 4A, 4C, 5A, 5B, 5C, 5D, 7A, 7C and 7D, and for information to Working Party 1B - Relevant technical information to support studies under WRC-27 agenda item 1.15     WP 7B   AI1.15   2024-03-27
[ 92 ]  
 
Liaison statement to Working Party 5D (copy to Working Parties 1B, 3K, 3M, 4A, 4C, 5A, 5B, 5C, 7C and 7D) - WRC-27 agenda item 1.7     WP 7B   AI1.7   2024-03-27
[ 91 ]  
 
Liaison statement on the use of the term "IMT-2030" within ITU-T     ITU-T SG13     2024-03-27
[ 90 ]  
 
Liaison statement out to key SDOs on the publication of GR THz 001 and GR THz 002     ETSI     2024-03-27
[ 89 ]  
 
Liaison statement to Working Parties 3L, 3M, 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B and 7D - Relevant technical information to support studies under WRC-27 agenda item 1.17     WP 7C   AI1.17   2024-03-25
[ 88 ]  
 
Liaison statement to Working Parties 3M, 4A, 5A, 5B, 5C, 5D, 7A and 7B (copy to ICAO for information) - WRC-27 agenda item 1.19     WP 7C   AI1.19   2024-03-25
[ 87 ]  
 
Reply liaison statement to Working Party 5D (copy to Working Parties 1B, 3K, 3M, 4A, 4C, 5A, 5B, 5C, 7B and 7D for information) - WRC-27 agenda item 1.7     WP 7C   AI1.7   2024-03-25
[ 86 ]  
 
Liaison statement to Working Party 4A (copy to Working Parties 3M, 4C, 5A, 5B, 5C, 5D, 7B and 7D for information) - WRC-27 agenda item 1.1     WP 7C   AI1.1   2024-03-25
[ 85 ]  
 
Reply liaison statement to ITU-T Study Group 15 (copy to ITU-R Working Parties 6A and 6C)     WP 6B     2024-03-25
[ 84 ]  
 
Reply liaison statement to Working Party 1A (copy to Working Parties 4C, 5A, 5D and 7D for information) - Beam Wireless Power Transmission (WPT)     WP 7C     2024-03-25
[ 83 ]  
 
Liaison statement to Working Party 4A (copy to Working Parties 1B, 3M, 4B, 4C, 5A, 5B, 5C, 5D, 7B, 7C and 7D for information) - WRC-27 agenda item 1.6     WP 6A   AI1.6   2024-03-18
[ 82 ]  
 
Liaison statement to Working Party 4C (copy to Working Parties 3L, 3M, 4A, 4B, 5A, 5B, 5C, 5D, 7B, 7C and 7D) - WRC-27 agenda item 1.13     WP 6A   AI1.13   2024-03-18
[ 81 ]  
 
Liaison statement to CPM Management Team (copy to Working Parties 3L, 3M, 4A, 4B, 4C, 5A, 5B, 5C, 5D, 7B, 7C and 7D) - WRC-27 agenda item 1.11     WP 6A   AI1.11   2024-03-18
[ 80 ]  
 
Liaison statement to Working Party 7C (copy to Working Parties 3L, 3M, 4A, 4C, 5A, 5B, 5C, 5D, 7B and 7D) - WRC-27 agenda item 1.17     WP 6A   AI1.17   2024-03-18
[ 79 ]  
 
Reply liaison statement to Working Party 5D, on their recent publication - ITU-R Framework and overall objectives of the future development of IMT for 2030 and beyond     Director, BR     2024-03-11
[ 78 ]  
 
Preliminary position on WRC-27 agenda     WMO     2024-03-06
[ 77 ]  
+Ch.2-7 
Report on the 45th meeting of Working Party 5D (Geneva, 31 January - 7 February 2024)     Chair, WP 5D     2024-02-07
[ 76 ]  
 
Final list of participants - Working Party 5D (Geneva, 31 January - 7 February 2024))     Director, BR     2024-02-07
[ 75 ]  
 
Correspondence received from Nufront proponent - Relevant business matters and intellectual property rights (IPR)     Director, BR     2024-01-31
[ 74 ]  
 
Text from WRC-23 Plenary for the attention of the ITU-R Working Parties that are either responsible for or contributing to studies relevant to items of the WRC-27 agenda or the WRC-31 preliminary agenda     Director, BR     2024-01-30
[ 73 ]  
 
Update on recent activities within CEPT     Region 1 (CEPT) Rapporteur     2024-01-30
[ 72 ]  
 
Proposal for updates to the preliminary draft new Report ITU-R M.[IMT.ABOVE 100 GHz] - Technical feasibility of IMT in bands above 100 GHz     Wireless World Research Forum     2024-01-19
[ 71 ]  
 
Update on activities in Region 3     Region 3 Rapporteur     2024-01-24
[ 70 ]  
 
Update report on CITEL PCC.II activities     CITEL Rapporteur     2024-01-23
[ 69 ]  
 
Proposal on elements on a working document towards a new Recommendation / Report ITU-R S.[MITIGATION MEASURES]     GSOA     2024-01-19
[ 68 ]  
 
Enhanced active antenna array radiation pattern model for IMT base stations and user equipments     France , New Zealand     2024-01-19
[ 67 ]  
 
Considerations on the definition of certain IMT-2030 capabilities - Qualitative KPIs     Reliance Jio Infocomm Limited     2024-01-19
Results:116 total items.
Result page:  1 - 2 - 3  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2024-05-13