International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 15 : Meeting 2014-03-24 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG 15  C (2014-03-24) 

ITU-T SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Study Period 2013

Meeting  from 2014-03-24 to 2014-04-04

held in Switzerland [Geneva]

Other Meetings : 2016-09-19  2016-02-15  2015-06-22  2014-11-24  2013-12-06  2013-07-01  2013-02-01 

Results:337 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 527 ]  
 
Number of categories in Rec. ITU-T G.652     Communication Line Products Association of Japan , Nippon Telegraph and Telephone Corporation (NTT)   Q5/15   2014-03-09
[ 526 ]  
 
Information and comment on zero-dispersion wavelength of G.652 fibre     Communication Line Products Association of Japan , Nippon Telegraph and Telephone Corporation (NTT)   Q6/15, Q5/15   2014-03-09
[ 525 ]  
 
G.8261 Synchronous Ethernet Network Jitter Specification beyond 10GE     Deutsche Telekom AG   Q13/15   2014-03-08
[ 524 ]  
 
G.8262 Synchronous Ethernet Equipment Jitter Specification beyond 10GE     Deutsche Telekom AG   Q13/15   2014-03-08
[ 523 ]  
 
Withdrawn by submitter  
Reposted as TD193/PLEN, "Draft revised Recommendation ITU-T G.976 (for Consent, 4 April 2014)"
 
N/A     2014-03-08
[ 522 ]  
 
Proposal to discuss optical cables for low-cost sustainable telecommunication infrastructure for remote areas in developing countries     The ITU Association of Japan   Q16/15   2014-03-08
[ 521 ]  
 
G.8152 v0.05 Data Dictionary clauses 1.7 - 1.11     Alcatel-Lucent USA Inc.   Q14/15   2014-03-08
[ 520 ]  
 
Proposal Work Areas for updating G.8052     Alcatel-Lucent USA Inc.   Q14/15   2014-03-08
[ 519 ]  
 
Updates in the G.8271.1     Telefon AB - LM Ericsson   Q13/15   2014-03-08
[ 518 ]  
(Rev.1) 
Proposal for the Multiplexing of ODU clients into OTUCn     PMC-Sierra, Inc.   Q11/15   2014-03-08
[ 517 ]  
 
Cyclically Interleaved BCH "Swizzle" FEC for B100G IrDI or MV-IaDI     PMC-Sierra, Inc.   Q11/15   2014-03-08
[ 516 ]  
 
Timing Distribution with PTP-over-OTN Overhead Proposal     PMC-Sierra, Inc.   Q13/15, Q11/15   2014-03-08
[ 515 ]  
 
OTUCn Overhead Byte proposal     PMC-Sierra, Inc.   Q11/15   2014-03-08
[ 514 ]  
 
Proposal for a scalable OTUCn frame structure     PMC-Sierra, Inc.   Q11/15   2014-03-08
[ 513 ]  
 
Overview summary of B100G frame format and 400GE client mapping proposals     PMC-Sierra, Inc.   Q11/15   2014-03-08
[ 512 ]  
 
400GbE client mapping proposals     PMC-Sierra, Inc.   Q11/15   2014-03-08
[ 511 ]  
 
G.inp: Comparison of L2.1 power reduction methods     TQ DELTA. LLC   Q4/15   2014-03-07
[ 510 ]  
 
Super-Product BCH (SP-BCH) Code for 100G and Beyond Networking     Broadcom Corporation   Q11/15   2014-03-07
[ 509 ]  
 
G.hn, G.vdsl, G.fast : Objectives and Tools for PLC to DSL Interference Mitigation     Metanoia Technologies, Inc.   Q4/15, Q18/15   2014-03-07
[ 508 ]  
 
G.hn: Using ACE symbols with precoding to save memory and complexity in Receiver     Metanoia Technologies, Inc.   Q18/15   2014-03-07
[ 507 ]  
 
G.hn: Proposal to add SNR and throughput measurement tools in G.hn     Metanoia Technologies, Inc.   Q18/15   2014-03-07
[ 506 ]  
 
G.hn: Special TXOP for IDCC / IDSW     Metanoia Technologies, Inc.   Q18/15   2014-03-07
[ 505 ]  
 
G.hn: Comparison of the two options for Inter-Medium Bridging     Metanoia Technologies, Inc.   Q18/15   2014-03-07
[ 504 ]  
 
Example Alternative B100G ODU Frame Format     Alcatel-Lucent USA Inc.   Q11/15   2014-03-07
[ 503 ]  
 
Thoughts on FEC for 400G IrDI     Alcatel-Lucent USA Inc.   Q6/15, Q11/15   2014-03-07
[ 502 ]  
 
Possible areas for B100G OTN Framing optimization     Alcatel-Lucent USA Inc.   Q11/15   2014-03-07
[ 501 ]  
 
Possible 400G Ethernet PCS format and implications for B100G OTN framing     Alcatel-Lucent USA Inc.   Q11/15   2014-03-07
[ 500 ]  
 
OTN B100G Framing Decisions     Alcatel-Lucent USA Inc.   Q11/15   2014-03-07
[ 499 ]  
 
ODU SMP Lower Order 1-stage signalling     Alcatel-Lucent USA Inc.   Q9/15   2014-03-07
[ 498 ]  
 
Clarification of clockClass table [G.8275.1]     Microsemi   Q13/15   2014-03-07
[ 497 ]  
 
ODU SMP Proposal Status     Alcatel-Lucent USA Inc.   Q9/15   2014-03-07
[ 496 ]  
 
T-TSC-P/T-BC-P/APTSC Model for partial timing support [G.8273.4]     Microsemi   Q13/15   2014-03-07
[ 495 ]  
 
T-BC SyncE transient testing method [G.8273]     Microsemi   Q13/15   2014-03-07
[ 494 ]  
 
T-BC SyncE Transient Requirement [G.8273.2]     Microsemi   Q13/15   2014-03-07
[ 493 ]  
 
T-BC Model [G.8273.2]     Microsemi   Q13/15   2014-03-07
[ 492 ]  
 
T-BC Applicable Interfaces [G.8273.2]     Microsemi   Q13/15   2014-03-07
[ 491 ]  
 
Bench Results of SyncE (for use as IEEE1588/GNSS holdover) [G.827x]     Microsemi   Q13/15   2014-03-07
[ 490 ]  
 
IPR: Ikanos Communications on IPR declarations on G.9700 and G.9701.     Ikanos Communications   Q4/15   2014-03-07
[ 489 ]  
 
Definition of Clock Behaviour with Regards to clockClass Usage [G.8275.1]     Ciena Canada   Q13/15   2014-03-07
[ 488 ]  
 
T-BC Clock Models [G.8273.2]     Ciena Canada   Q13/15   2014-03-07
[ 487 ]  
 
Application code compatible with 40GBASE-ER4 in G.695     Ciena Canada   Q6/15   2014-03-07
[ 486 ]  
 
Proposal for Update to G.977 considering 40G and 100G Coherent Systems     Ciena Canada   Q8/15   2014-03-07
[ 485 ]  
 
Proposed changes to Recommendation G.977 for 40G and 100G systems     Ciena Canada   Q8/15   2014-03-07
[ 484 ]  
 
Layers in Transport SDN     Ciena Canada   Q14/15, Q12/15   2014-03-07
[ 483 ]  
 
MEF Mobile Backhaul     Ericsson Canada, Inc.   Q6/15, Q3/15, Q2/15, Q13/15, Q12/15, Q10/15   2014-03-07
[ 482 ]  
 
Adoption of MEF technical specifications     Canada   Q10/15   2014-03-07
[ 481 ]  
 
G9979     Canada   Q18/15   2014-03-07
[ 480 ]  
 
G.inp: Proposed edits to help complete the VDSL LPM Amendment     Adaptive Spectrum and Signal Alignment (ASSIA) Inc. , Ikanos Communications   Q4/15   2014-03-07
[ 479 ]  
 
Protection Architectures for G.metro     ADVA Optical Networking , Telefon AB - LM Ericsson   Q6/15   2014-03-07
[ 478 ]  
(Rev.1-2) 
Reference diagrams for G.metro     ADVA Optical Networking , British Telecommunications Public Ltd. Co. (BT Plc) , Coriant GmbH & Co. KG , Telefon AB - LM Ericsson   Q6/15   2014-03-07
Results:337 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-5-27