International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 15 : Meeting 2016-02-15 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG 15  C (2016-02-15) 

ITU-T SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Study Period 2013

Meeting  from 2016-02-15 to 2016-02-26

held in Switzerland [Geneva]

Other Meetings : 2016-09-19  2015-06-22  2014-11-24  2014-03-24  2013-12-06  2013-07-01  2013-02-01 

Results:371 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 1819 ]  
 
Wander Accumulation Simulation Results for Transport of a 1 GB Ethernet Client over B100G OTN based on Multiple Replications     Huawei Technologies Co., Ltd.   Q13/15   2016-02-02
[ 1818 ]  
 
10Mhz interface     Huawei Technologies Co., Ltd.   Q13/15   2016-02-02
[ 1817 ]  
 
G.fast: Reduction of number VF samples reporting formats     Broadcom Corporation , Sckipio Technologies S.I. Ltd.   Q4/15   2016-02-02
[ 1816 ]  
 
G.fast: Clarification on byte order in SOC and EOC messages.     Broadcom Corporation , Sckipio Technologies S.I. Ltd.   Q4/15   2016-02-02
[ 1815 ]  
 
OOC-PSD mask in NG-PON2     British Telecommunications Public Ltd. Co. (BT Plc)   Q2/15   2016-02-02
[ 1814 ]  
 
Proposal precautions for the use of GNSS receivers     Orange   Q13/15   2016-02-02
[ 1813 ]  
 
Observed GPS UTC information malfunction - for information     Orange   Q13/15   2016-02-02
[ 1812 ]  
 
G.fast: G.9701 test parameters text improvements     Alcatel-Lucent International   Q4/15   2016-02-02
[ 1811 ]  
 
Proposal for G.654.E fibre     OFS Fitel, LLC   Q6/15, Q5/15   2016-02-02
[ 1810 ]  
 
G.fast: Various text updates to G.9701 Amd1 Low power mode     Alcatel-Lucent International   Q4/15   2016-02-02
[ 1809 ]  
 
G.fast: Proposal to restrict upstream transmit power for 8dBm profile     Broadcom Corporation   Q4/15   2016-02-02
[ 1808 ]  
 
G.fast: G.ploam: G.997.2 parameters to support G.fast XLOG test parameter     Alcatel-Lucent International   Q4/15   2016-02-02
[ 1807 ]  
 
G.vdsl: Mis-estimation of SNR during MEDLEY     Broadcom Corporation , Intel Corporation , Qualcomm, Inc.   Q4/15   2016-02-02
[ 1806 ]  
 
Future work on G.fast recommendations     British Telecommunications Public Ltd. Co. (BT Plc)   Q4/15   2016-02-02
[ 1805 ]  
 
G.fast, Editorial Correction to Figure Z-2.1     British Telecommunications Public Ltd. Co. (BT Plc)   Q4/15   2016-02-02
[ 1804 ]  
 
G.fast: G.fast XLOG test parameter     Alcatel-Lucent International   Q4/15   2016-02-02
[ 1803 ]  
 
G.vlc: Modulations formats for G.vlc     Marvell Semiconductor Inc.   Q18/15   2016-02-02
[ 1802 ]  
 
G.fast, G.ploam: VCE ID and VCE port index in G.9701 Amd2 and G.997.2 Amd2     Alcatel-Lucent International   Q4/15   2016-02-02
[ 1801 ]  
 
G.ploam, G.fast: Clarification on Unavailable State for corrigendum     Alcatel-Lucent International   Q4/15   2016-02-02
[ 1800 ]  
 
G.ploam: Test parameter update time stamps in G.997.2 Amd1     Alcatel-Lucent International   Q4/15   2016-02-02
[ 1799 ]  
 
G.fast, G.ploam: Corrigenda to G.9701 and G.997.2     Alcatel-Lucent International   Q4/15   2016-02-02
[ 1798 ]  
 
G.ploam, G.fast: Link state forced/enable/actual in G.9701 Amd1 and G.997.2 Amd1.     Alcatel-Lucent International   Q4/15   2016-02-02
[ 1797 ]  
 
G.ploam: Missing lom failure in G.997.1     Alcatel-Lucent International   Q4/15   2016-02-02
[ 1796 ]  
 
Considerations on the evolution of Module Framer and DSP Framer Interfaces (MFI/DFI)     Huawei Technologies Co., Ltd.   Q11/15   2016-02-02
[ 1795 ]  
 
G.hn: On the use of G.hn over twisted pair cables     Marvell Semiconductor Inc.   Q18/15   2016-02-02
[ 1794 ]  
 
Cascaded and nested protection     China Unicom , Huawei Technologies Co., Ltd.   Q9/15, Q11/15   2016-02-02
[ 1793 ]  
 
Optical Media SDN Control Dependencies     Xtera Communications, Inc.   Q14/15, Q12/15   2016-02-02
[ 1792 ]  
 
G.vector: Considerations about Multi-Vendor Vectoring standardization     Telecom Italia S.p.A.   Q4/15   2016-02-02
[ 1791 ]  
 
G.fast: On data rate reporting     British Telecommunications Public Ltd. Co. (BT Plc)   Q4/15   2016-02-02
[ 1790 ]  
 
Test result for multi-domain nested protection     China Unicom   Q9/15   2016-02-02
[ 1789 ]  
 
G.hn: Implementation on the agreements on centralized coordination of neighbouring domains     Marvell Semiconductor Inc.   Q18/15   2016-02-02
[ 1788 ]  
 
Test result for multi-domain cascaded protection     China Unicom   Q9/15   2016-02-02
[ 1787 ]  
 
Proposal for TIGAV transmission method     Intel Corporation   Q4/15   2016-02-02
[ 1786 ]  
 
G.hn: Some considerations on PSD ceiling use in G.hn framework - Continuation     Marvell Semiconductor Inc.   Q18/15   2016-02-02
[ 1785 ]  
 
Alarm processing in G.asdtn and G.gim     ZTE Corporation   Q14/15, Q12/15   2016-02-02
[ 1784 ]  
 
Proposal on dual rate PMD reference design for XGS-PON     FiberHome Technologies Group   Q2/15   2016-02-02
[ 1783 ]  
 
G.fast: Upstream Hlog reporting     British Telecommunications Public Ltd. Co. (BT Plc)   Q4/15   2016-02-02
[ 1782 ]  
 
G.ploam, Capability reporting in G.997.1 and G.997.2     British Telecommunications Public Ltd. Co. (BT Plc)   Q4/15   2016-02-02
[ 1781 ]  
(Rev.1) 
Consideration for upstream dual-rate XGS-PON     FiberHome Technologies Group   Q2/15   2016-02-02
[ 1780 ]  
 
G.primex: Ask for consent and determination     STMicroelectronics   Q15/15   2016-02-02
[ 1779 ]  
 
G.654 revision proposal incorporating a large Aeff fibre for terrestrial networks     Corning Incorporated   Q5/15   2016-02-02
[ 1778 ]  
 
Comments to the editor proposed revisions for ITU-T Recommendation G.652     Corning Incorporated   Q5/15   2016-02-02
[ 1777 ]  
 
Proposed changes to CLPAJ and NTT revised proposal on chromatic dispersion specifications of G.652.D fibre     Corning Incorporated   Q5/15   2016-02-02
[ 1776 ]  
 
Proposal for revising Appendix I of ITU-T Recommendation G.652 revision     Corning Incorporated , OFS Fitel, LLC   Q6/15, Q5/15   2016-02-02
[ 1775 ]  
 
G.vlc: Some consideration on G.vlc use cases     Marvell Semiconductor Inc.   Q18/15   2016-02-02
[ 1774 ]  
 
On G.fast based solution for Coax application     British Telecommunications Public Ltd. Co. (BT Plc) , Futurewei Technologies US R&D Center   Q4/15   2016-02-02
[ 1773 ]  
 
G.vlc: Connecting a G.hn-AFE to a LED-based VLC transceiver     Marvell Semiconductor Inc.   Q18/15   2016-02-02
[ 1772 ]  
 
Holdover Scenarios with eEEC Clock     Rakon Limited   Q13/15   2016-02-02
[ 1771 ]  
 
Option 2 clocks for eEEC     Rakon Limited   Q13/15   2016-02-02
[ 1770 ]  
 
Withdrawn by submitter     N/A     2016-02-02
Results:371 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-5-26