International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP5B : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP5B  C 

ITU-R WP5B

Maritime mobile service including Global Maritime Distress and Safety System (GMDSS); aeronautical mobile service and radiodetermination service

Results:32 total items.
Contributions  [ Source: WP 5A ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 713 ]  
 
Reply liaison statemen to Working Party 1A (copy to ITU-T Study Group 15 and ITU-R Working Parties 5B, 5C, 5D, 6A, 7A, 7B, 7C and 7D) - Preliminary draft revision of Report ITU-R SM.2351-2 on Smart Grid Utility Management Systems     WP 5A     2019-05-13
[ 648 ]  
 
Reply liaison statement to ITU-R Working Party 1A and the Rapporteur Group on the coexistence of wired telecommunication with radiocommunication systems (copy to Working Parties 5C and 5D) (copy for information to Working Parties 5B, 6A, 7A, 7B, 7C, 7D and ITU-T SG 15) - Preliminary draft revision of Report ITU-R SM.2351-2 on Smart Grid utility Management Systems     WP 5A     2018-11-20
[ 647 ]  
 
Liaison statement to Working Parties 5B, 5C and 6A - Progress report on WRC-19 agenda item 1.1 sharing and compatibility studies     WP 5A     2018-11-20
[ 644 ]  
 
Liaison statement to Working Parties 1A and 3L (copy to Working Parties 1B, 5B and 6A) - Comments on Report ITU-R SM.[WPT_100-148.5kHz]     WP 5A     2018-11-09
[ 543 ]  
 
Liaison statement to Working Party 6A (copied for information to Working Parties 3K, 3M, 5B and 5C) - Updated on work towards WRC-19 agenda item1.1     WP 5A     2018-06-06
[ 539 ]  
 
Liaison statement to Working Party 1A (copy for information to Working Parties 1B, 3L, 5B and 6A) - Applicability of Recommendation ITU-R M.1732 for use in studies undertaken in working document towards a preliminary draft new Report ITU-R SM.[WPT_100-148.5kHz]     WP 5A     2018-05-31
[ 535 ]  
 
Liaison statement to Working Party 5B (copy for information to Working Parties 5C, 7B and 7C) - Technical and operational characteristics of conventional and trunked land mobile systems operating in the mobile service allocations below 869 MHz to be used in sharing studies     WP 5A     2018-05-25
[ 533 ]  
 
Reply liaison statement to ITU-R Working Party 5B - AMRDs under WRC-19 agenda item 1.9.1     WP 5A     2018-05-25
[ 418 ]  
 
Liaison statement to Working Parties 3K, 3M, 5B, 5C and 6A - Progress report on WRC-19 agenda item 1.1 sharing and compatibility studies     WP 5A   AI1.1   2017-11-22
[ 417 ]  
 
Liaison statement to Working Parties 7C and 7D (copied to Working Party 5B for information) - Coexistence between high-speed railway radiocommunication system between train and trackside operating in the frequency bands 92-94 GHz, 94.1-100 GHz and 102-109.5 GHz, and active and passive services     WP 5A     2017-11-22
[ 414 ]  
 
Reply liaison statement to Working Party 7C (copied to Working Parties 5B and 5C for information) - Technical and operational characteristics for the 40-50 MHz frequency range (WRC-23 preliminary agenda item 2.2)     WP 5A   AI2.2   2017-11-21
[ 412 ]  
 
Reply liaison statement to Working Party 1A (copied to Working Parties 5B, 5C and 5D for information) - Assessment of the impact of unwanted radio frequency energy generated by non-radiocommunication equipment to radiocommunication services     WP 5A     2017-11-17
[ 408 ]  
 
Reply liaison statement to Working Party 5B - Studies for the implementation of Resolution 155 (WRC-15)     WP 5A     2017-11-13
[ 407 ]  
 
Liaison statement to Working Party 5B (copied to Working Party 5C for information) - Interference criteria of conventional and trunked land mobile systems to be used in sharing studies for WRC-19 agenda item 1.9.2     WP 5A   AI1.9   2017-11-13
[ 311 ]  
 
Liaison statement to Working Party 5B - Technical and operational characteristics of aeronautical systems relevant to the work under WRC-19 agenda item 1.16     WP 5A     2017-06-05
[ 310 ]  
 
Reply liaison statement to Working Party 1A (copied for information to Working Parties 1B and 5B) - Radio frequency ranges for wireless power transmission using technologies other than radio frequency Beam     WP 5A     2017-06-05
[ 309 ]  
 
Liaison statement to Working Party 7B regarding WRC-19 agenda item 1.3 (copied for information to Working Parties 5B and 5D)     WP 5A   AI1.3   2017-06-05
[ 203 ]  
 
Liaison statement to Working Party 5B - WRC-19 agenda item 9.1, issue 9.1.5     WP 5A   AI9.1   2016-11-29
[ 201 ]  
 
Liaison statement to Task Group 5/1 (copied for information to Working Parties 3J, 3K, 3M, 4A, 4B, 4C, 5B, 5C, 5D, 6A, 7B, 7C, and 7D) - Preparations for WRC-19 AI 1.13     WP 5A   AI1.13   2016-11-23
[ 200 ]  
 
Liaison statement to Working Party 7C (copied to Working Parties 3L, 5B, 5C and 6A for information) - Technical and operational characteristics for systems operating within the 40-50 MHz frequency range     WP 5A     2016-11-23
[ 199 ]  
 
Liaison statement to Working Party 5B - WRC-19 agenda item 1.9.2     WP 5A   AI1.9.2   2016-11-23
[ 198 ]  
 
Liaison statement to Working Party 5B - Wind profiler radar characteristics in the 50-54 MHz frequency band to be used in sharing studies with the amateur service under agenda item 1.1     WP 5A   AI1.1   2016-11-23
[ 197 ]  
 
Liaison statement to Working Parties 1A and 1B (copy for information to Working Party 4A, 4C, 5B, 5C, 5D and 7C) - Sharing schemes in the land mobile service on the basis of geographical use     WP 5A     2016-11-18
[ 84 ]  
 
Liaison statement to Working Parties 4A, 4C, 5B and 5C (copied for information to Working parties 1B, 3J, 3K, 3M and 5D) - Request for technical characteristics relevant to the work under WRC-19 agenda item 1.16     WP 5A   AI1.16   2016-05-25
[ 83 ]  
 
Reply liaison statement to Working Party 6B on Global Platform for the Broadcasting Service (copy for information to ITU-R WPs 4A, 4B and 5B, 5C, 5D, ITU-T SGs 9 and 16)     WP 5A     2016-05-25
[ 82 ]  
 
Liaison statement to Working Party 4A (copied to Working Parties 5B, 5C and 5D for information) - Working document towards a preliminary draft new Recommendation ITU-R S.[INTERF.AREA]     WP 5A     2016-05-25
[ 81 ]  
 
Reply liaison statement to Working Party 7B (copy for information to Working Parties 1A, 3M 4A, 4B, 4C, 5B, 5C, 5D and 6A) - WRC-19 agenda item 1.7     WP 5A   1.7   2016-05-25
[ 80 ]  
 
Liaison statement to Working Party 7B (copied for information to Working Parties 3M, 4C, 5B, 5C, 5D and 6A) - Technical characteristics for WRC-19 agenda item 1.3     WP 5A   AI1.3   2016-05-25
[ 79 ]  
 
Liaison statement to Working Parties 1A, 1B, 4A, 5B, 5C and 5D - Study of sharing schemes in the land mobile service on the basis of geographical use, frequencies, services, new technologies and applications     WP 5A     2016-05-25
[ 78 ]  
 
Liaison statement to Working Party 6A (copy to Working Parties 1B, 5B, 5C, 3K and 3M) - WRC-19 agenda 1.1     WP 5A   AI1.1   2016-05-25
[ 77 ]  
 
Reply liaison statement to Working Party 1A (copy for information to Working Parties 1B, 5B 5C, 6A, 7A and 7D) - Radio frequency ranges for wireless power transmission using technologies other than radio frequency beam     WP 5A     2016-05-25
[ 67 ]  
 
Report on liaison with CENELEC on developments concerning PLT, EMI and WPT - Communication by the Rapporteur on coexistence of wired telecommunication with radiocommunication systems     Chairman, WP 5A     2016-05-09
Results:32 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2024-6-11