International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 5 : Meeting 2015-10-12 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG 5  C (2015-10-12) 

ITU-T SG 5

Environment and climate change

Study Period 2013

Meeting  from 2015-10-12 to 2015-10-23

held in Switzerland [Geneva]

Other Meetings : 2017-11-20  2017-05-15  2016-10-10  2016-04-20  2014-12-08  2014-07-23  2014-05-19  2013-12-02  2013-01-29 

Results:13 total items.
Contributions  [ AI/Question: Q7/5 ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 631 ]  
 
Proposal how to inform about the minimum health and safety requirements regarding the exposure of workers to the risks arising from electromagnetic fields (Directive 2013/35/EU)     Narda Safety Test Solutions GmbH   Q7/5   2015-09-29
[ 608 ]  
 
Comments on second draft of K.env     GSM Association   Q7/5   2015-09-29
[ 607 ]  
(Rev.1) 
Proposal to amend Summary and Introduction of draft K.maps     GSM Association   Q7/5   2015-09-29
[ 603 ]  
 
Draft new Recommendation ITU-T K.maps (for Consent) - (pre-edited by TSB Editing Team)     Universidad Nacional de San Luis   Q7/5   2015-09-28
[ 602 ]  
 
Proposal of a new work item on Electromagnetic field (EMF) considerations in smart sustainable cities     ORANGE POLSKA S.A. , Telecom Italia S.p.A.   Q7/5   2015-09-28
[ 573 ]  
(Rev.1) 
Second draft of the new ITU-T Recommendation K.emf "Exposure levels in the close proximity of the radiocommunication antennas"     ORANGE POLSKA S.A.   Q7/5   2015-09-28
[ 569 ]  
(Rev.1) 
Comments to the 2nd Draft of the new ITU-T Recommendation K.env     ORANGE POLSKA S.A.   Q7/5   2015-09-28
[ 568 ]  
 
Suggested amendment Annex B.1 ITU-T K.52     Telefon AB - LM Ericsson   Q7/5   2015-09-28
[ 562 ]  
 
Discuss on Massive MIMO antenna array in the 5G communication system EMF     China Mobile Communications Corporation   Q7/5   2015-09-28
[ 561 ]  
 
The 2nd Draft of the new Recommendation K.env - Guidance on the Environmental Management for Electromagnetic Radiation from Radiocommunication Base Stations     China Telecommunications Corporation   Q7/5   2015-09-28
[ 548 ]  
 
Proposal for the new draft of K.env     Korea (Rep. of)   Q7/5   2015-09-25
[ 546 ]  
(Rev.1) 
Adjustment of the ICNIRP exposure limits     ORANGE POLSKA S.A.   Q7/5   2015-09-24
[ 545 ]  
(Rev.1) 
Inherently compliant from ICNIRP basic restriction issued as criteria for K. 52 and proposal of new category of "perfectly compliant".     National Institute of Information and Communications Technology , NTT DoCoMo, Inc.   Q7/5   2015-09-24
Results:13 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-5-20