International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 15 : Meeting 2013-07-01 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG 15  C (2013-07-01) 

ITU-T SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Study Period 2013

Meeting  from 2013-07-01 to 2013-07-12

held in Switzerland [Geneva]

Other Meetings : 2016-09-19  2016-02-15  2015-06-22  2014-11-24  2014-03-24  2013-12-06  2013-02-01 

Results:66 total items.
Result page:  1 - 2  - Next Next
Contributions  [ AI/Question: Q9/15 ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 430 ]  
 
Proposed text for draft G.MDSP based on existing OTN material     Alcatel-Lucent Deutschland AG   Q9/15   2013-06-18
[ 429 ]  
 
Considerations regarding G.MDSP     Alcatel-Lucent Italia S.p.A.   Q9/15   2013-06-18
[ 427 ]  
 
Comments on circulated draft version of G.808.2     Alcatel-Lucent Deutschland AG   Q9/15   2013-06-18
[ 426 ]  
 
Proposed enhancement of G.873.2     Alcatel-Lucent Deutschland AG   Q9/15   2013-06-18
[ 422 ]  
(Rev.1) 
MAC DA setting for Ethernet OAM frames     Alcatel-Lucent Italia S.p.A.   Q9/15, Q10/15   2013-06-18
[ 418 ]  
 
Discussion and proposal on progress in MPLS-TP linear protection     Nippon Telegraph and Telephone Corporation (NTT)   Q9/15   2013-06-18
[ 417 ]  
 
Proposed text for G.mdsp     Alcatel-Lucent Italia S.p.A. , Telecom Italia S.p.A.   Q9/15   2013-06-18
[ 395 ]  
 
Support for Ethernet linear protection solutions applicable to DNI scenarios     Telecom Italia S.p.A.   Q9/15   2013-06-18
[ 394 ]  
 
Selection of protection transport entities in m1 SMP architecture     FiberHome Technologies Group   Q9/15   2013-06-18
[ 393 ]  
 
Editorial suggestions for G.8131.1     FiberHome Technologies Group   Q9/15   2013-06-18
[ 392 ]  
 
G.mdsp proposed new network objectives     Telecom Italia S.p.A.   Q9/15   2013-06-18
[ 390 ]  
 
Definition for Broadcast Bridge in G.8131.1     FiberHome Technologies Group   Q9/15   2013-06-18
[ 388 ]  
(Rev.1) 
Forwarding behaviour for OAM frames at MIPs in G.8021     Alcatel-Lucent USA Inc.   Q9/15   2013-06-18
[ 387 ]  
 
Validating assumptions made in the context of MECP     Alcatel-Lucent USA Inc.   Q9/15   2013-06-18
[ 383 ]  
 
Proposal to cross-connection release signal of 2-stage ODU SMP protocol     Electronics and Telecommunications Research Institute (ETRI)   Q9/15   2013-06-18
[ 370 ]  
 
Utilizing G.8031 APS protocol for per-leaf protection in MECP     Electronics and Telecommunications Research Institute (ETRI)   Q9/15   2013-06-18
[ 369 ]  
 
Propose to modify network objectives for G.mdsp     Electronics and Telecommunications Research Institute (ETRI)   Q9/15   2013-06-18
[ 356 ]  
 
Modification of pre-emption principles in G.808.3     FiberHome Technologies Group   Q9/15   2013-06-18
[ 354 ]  
 
some editorial suggestions for G.808.3     FiberHome Technologies Group   Q9/15   2013-06-18
[ 353 ]  
 
proposal text about network objective of configuration inconsistance in G.808.3     FiberHome Technologies Group   Q9/15   2013-06-18
[ 351 ]  
 
priority consideration for preemption in G.808.3     FiberHome Technologies Group   Q9/15   2013-06-18
[ 350 ]  
 
Considerations in 2-stage ODU SMP protocol     Electronics and Telecommunications Research Institute (ETRI)   Q9/15   2013-06-18
[ 347 ]  
 
MECP per-tree protection - simultaneous condition     Electronics and Telecommunications Research Institute (ETRI)   Q9/15   2013-06-18
[ 346 ]  
 
MECP per-tree protection - operator's command initiated protection     Electronics and Telecommunications Research Institute (ETRI)   Q9/15   2013-06-18
[ 342 ]  
 
Proposal for generic state machine description in G.808.1     Hitachi, Ltd. , NEC   Q9/15   2013-06-18
[ 288 ]  
(Rev.1) 
Proposed correction of MAC DA specification in G.8013     NEC Corporation   Q9/15, Q10/15   2013-06-17
[ 287 ]  
(Rev.1) 
Comments on the scope and some definitions of G.808.2     NEC Corporation   Q9/15   2013-06-17
[ 271 ]  
 
ODU SMP Signalling Options     Alcatel-Lucent USA Inc.   Q9/15   2013-06-17
[ 269 ]  
 
Availability/Outage times for ODUSMP     Alcatel-Lucent USA Inc.   Q9/15   2013-06-17
[ 257 ]  
 
Proposed text for removed G.8032 appendices (for agreement)     Nippon Telegraph and Telephone Corporation (NTT)   Q9/15   2013-06-17
[ 236 ]  
 
Proposed text in G.MDSP     China Unicom , Huawei Technologies Co. Ltd.   Q9/15   2013-06-17
[ 235 ]  
 
APS Behavior in 1-stage ODU SMP Proposal     Huawei Technologies Co. Ltd. , Infinera Corporation   Q9/15   2013-06-17
[ 234 ]  
 
Discussion about Single Failure and its Potential Affect in ODU SMP     Huawei Technologies Co. Ltd. , Infinera Corporation   Q9/15   2013-06-17
[ 229 ]  
 
Analysis of Supporting External Commands in ODU SMP     Huawei Technologies Co. Ltd.   Q9/15   2013-06-17
[ 223 ]  
 
Answers to B100G questions from Q11/15 rapporteur (TD22/GEN)     China Mobile Communications Corporation , Huawei Technologies Co. Ltd.   Q9/15, Q6/15, Q14/15, Q12/15, Q11/15   2013-06-17
[ 213 ]  
 
Status update for ODU SMP     ZTE Corporation   Q9/15   2013-06-17
[ 208 ]  
 
Consideration on optical layer protection     China Unicom , Fiberhome , Nokia Siemens Networks   Q9/15   2013-06-17
[ 205 ]  
 
Architecture and APS communication for per-leaf protection in MECP     Korea (Rep. of)   Q9/15   2013-06-17
[ 202 ]  
 
MECP per-tree protection - root node initiated protection     Korea (Rep. of)   Q9/15   2013-06-17
[ 190 ]  
(Rev.1) 
Proposed text on multiple failure for G.mdsp     Ministry of Industry and Information Technology (MIIT)   Q9/15   2013-06-17
[ 156 ]  
 
Proposed MPLS-TP Linear protection models for Appendix in G.8121     Fujitsu Limited   Q9/15, Q10/15   2013-06-17
[ 155 ]  
 
Comments on draft G.808.2     Fujitsu Limited   Q9/15   2013-06-17
[ 154 ]  
 
Consideration on the notification of availability for ODU SMP     Fujitsu Limited   Q9/15   2013-06-17
[ 145 ]  
 
ODU SMP Activation Time     Huawei Technologies Co. Ltd. , Infinera Corporation   Q9/15   2013-06-16
[ 144 ]  
 
Improved Encoding/processing of Messages for 1-Stage ODU SMP Protocol     Huawei Technologies Co. Ltd. , Infinera Corporation   Q9/15   2013-06-16
[ 111 ]  
 
Criteria for evaluating ODU SMP protocol proposals     Tellabs Oy   Q9/15   2013-06-14
[ 103 ]  
 
Proposed Revisions to the Current G.mdsp Draft     Fujitsu Network Communications, Inc.   Q9/15   2013-06-14
[ 87 ]  
 
Operational examples of 2-stage ODU SMP APS protocol     Tellabs Oy   Q9/15   2013-06-13
[ 86 ]  
 
Resource availability notifications in ODU shared mesh protection     Tellabs Oy   Q9/15   2013-06-13
[ 53 ]  
 
Necessity to Support External Commands in ODU SMP Protocol     China Mobile Communications Corporation , Huawei Technologies Co. Ltd.   Q9/15   2013-06-13
Results:66 total items.
Result page:  1 - 2  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-5-26