International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 15 : Meeting 2014-03-24 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG 15  C (2014-03-24) 

ITU-T SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Study Period 2013

Meeting  from 2014-03-24 to 2014-04-04

held in Switzerland [Geneva]

Other Meetings : 2016-09-19  2016-02-15  2015-06-22  2014-11-24  2013-12-06  2013-07-01  2013-02-01 

Results:26 total items.
Contributions  [ Source: FiberHome Technologies Group ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 742 ]  
 
Efficient mapping of CPRI over ODUflex     FiberHome Technologies Group , IP Light , OKI Electric Industry Company Ltd. (OKI)   Q11/15   2014-03-11
[ 739 ]  
(Rev.1) 
Proposal of new recommendation on studying wavelength selective optical distribution networks and related system in Q2/SG15     China Mobile Communications Corporation , China Telecommunications Corporation , FiberHome Technologies Group , Huawei Technologies Co. Ltd. , Ministry of Industry and Information Technology (MIIT)   Q2/15   2014-03-11
[ 708 ]  
 
Proposal of starting a new work item or modify the existing recommendations on optical layer protection     China Unicom , FiberHome Technologies Group   Q9/15   2014-03-11
[ 650 ]  
 
Consideration on LRM in Transport SDN Controller     FiberHome Technologies Group   Q14/15, Q12/15   2014-03-10
[ 649 ]  
 
The future of management and SDN controller     FiberHome Technologies Group   Q14/15, Q12/15   2014-03-10
[ 648 ]  
 
Consideration for CCN function model in SDN network     FiberHome Technologies Group   Q14/15   2014-03-10
[ 628 ]  
 
Proposal for studying intelligent node elements in optical fibre networks     China , China Mobile Communications Corporation , China Telecommunications Corporation , China Unicom , FiberHome Technologies Group , Huawei Technologies Co. Ltd. , ZTE Corporation   Q16/15   2014-03-10
[ 576 ]  
 
Proposed updates to currentProblemList in G.8152     FiberHome Technologies Group   Q14/15   2014-03-10
[ 575 ]  
 
Proposed update MI list to On-demand and Pro-active measurement object class in G.8152     FiberHome Technologies Group   Q14/15   2014-03-10
[ 574 ]  
 
The proposal about the allocation of OTN Sy nchronisation Message channel (OSMC)     FiberHome Technologies Group   Q11/15   2014-03-10
[ 573 ]  
 
The proposal about the value of K(OTUk) to support OSMC     FiberHome Technologies Group   Q11/15   2014-03-10
[ 572 ]  
 
The method about the frequency of PTP packet in the OSMC     FiberHome Technologies Group   Q11/15   2014-03-10
[ 571 ]  
 
Consideration on the mapping of an ODUj frame into the OPUCn payload     FiberHome Technologies Group   Q11/15   2014-03-10
[ 570 ]  
(Rev.1) 
consideration of recovery network sinario in MDSP     FiberHome Technologies Group   Q9/15   2014-03-10
[ 569 ]  
 
Different switching types in each domain of MDSP     FiberHome Technologies Group   Q9/15   2014-03-10
[ 568 ]  
(Rev.1) 
Consideration of Network Objectives in the latest draft of G.mdsp     FiberHome Technologies Group   Q9/15   2014-03-10
[ 567 ]  
 
Measurement results for spectral excursion in 100G DP-QPSK application     FiberHome Technologies Group   Q6/15   2014-03-10
[ 566 ]  
+Add.1 
Proposal to start a new work item on optical distribution networks and related system based on ultra dense wavelength division multiplexing  
Addendum 1 to C-0566 is provided by TSB to correct contact information.
 
FiberHome Technologies Group   Q2/15   2014-03-10
[ 565 ]  
 
Analysis of relationship of NM/Controllerand Application Scenario     China Mobile Communications Corporation , FiberHome Technologies Group   Q14/15, Q12/15   2014-03-10
[ 560 ]  
 
Proposal to define and describe wavelength management and control channel in G.multi     FiberHome Technologies Group   Q2/15   2014-03-10
[ 559 ]  
 
Proposal on G.989.2 Amendment for dual-rate PMD implementation     FiberHome Technologies Group   Q2/15   2014-03-10
[ 557 ]  
 
The possibility of CPRI signal transmission over TWDM-PON system in G.989.3     FiberHome Technologies Group   Q2/15   2014-03-10
[ 553 ]  
 
Proposal for new test methods of Hydrogen Aging     FiberHome Technologies Group , Ministry of Industry and Information Technology (MIIT)   Q5/15   2014-03-10
[ 550 ]  
 
Drafting proposal of new recommendation L.91     FiberHome Technologies Group   Q16/15   2014-03-10
[ 461 ]  
 
Hierarchical connection control in Transport SDN     China Telecommunications Corporation , FiberHome Technologies Group , Huawei Technologies Co. Ltd. , ZTE Corporation   Q14/15, Q12/15   2014-03-06
[ 460 ]  
 
Interaction models between SDN controllers in multi-domain transport network     China Telecommunications Corporation , FiberHome Technologies Group , Huawei Technologies Co. Ltd. , ZTE Corporation   Q14/15, Q12/15   2014-03-06
Results:26 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-5-27