International Telecommunication Union   ITU
عربي  |  中文  |  Español  |  Français  |  Русский
 
 Advanced Search Advanced Search Site Map Contact us Print Version
 
Home : ITU-T Home
   

>> Study Group 5 : Protection against electromagnetic environment effects
Question 2/5 - EMC related to broadband access networks
(Continuation of Question 2/5)

Motivation 

The growth in demand for data services in small businesses and the home is driving telecommunications operators to provide high bandwidth connections to these customers. Because of the desire to reuse existing access networks (on cost grounds) new technical approaches generally involving spread spectrum techniques are being developed and implemented. 
These techniques introduce a new family of EMC issues.

The following Recommendation, in force at the time of approval of this Question, falls under its responsibility:
K.60.

Question

This question will study the impact of spread spectrum techniques and other modulation techniques on the electromagnetic environment. This question will produce one or more recommendations, which will allow telecommunication network operators to minimize the risk of interference to the user of the radio spectrum from these new access systems. In particular the question will study whether the increase in the probability of the existence of interfering signals generated by the spread spectrum nature of these systems is balanced by the reduction in the signal level at any specific frequency. Work will also review whether the dominant mechanisms of interference remain the same for these new systems. Topics such as dithered clocks and frequency may also be covered by this work.
As a second stream under the same question the validity of current immunity techniques (especially the need for broadband radiated and conducted tests) for these new systems will also be studied.

This question will also study the interference from the next generation access systems to existing or next generation telecommunication networks. 
Study items to be considered include, but are not limited to:
  • Prediction method for emission from broadband signals transmitting in a cable;
  • EMC requirements and mitigation methodology for next generation access systems to existing or next generation telecommunication networks systems. An important issue is the possibility of interference from power-line broadband technologies (access Power Line Communication, PLC) to telecommunication access systems.

Tasks
Tasks include, but are not limited to:

Maintenance and enhancement of the Recommendation K.60 and/or one or more recommendations detailing appropriate EMC requirements for broadband access systems (including the consideration of the need for a separate broadband test method and emission level).

Relationships

  • Recommendations: K-series 
  • Questions: 1, 7 and 16/5
  • Standardisation bodies: ITU-R, IEC CISPR, IEC, ETSI, ANSI

 

Top - Feedback - Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page : TSB EDH
Updated : 2008-10-31