International Telecommunication Union   ITU
عربي  |  中文  |  Español  |  Français  |  Русский
 
 Advanced Search Advanced Search Site Map Contact us Print Version
 
Home : ITU-T Home
   
ITU-T Study Group 11 (Study Period 2005-2008)
List of Editors
ITEM TITLE EDITOR
 
Q.iptvsa (former Q.IPTV prot arch)   Signalling and control plane architecture for IPTV  
Q.1/11
 
Ghassem Koleyni
Email: ghassem[at]rogers.com  
 
CRBT-CRT   Signalling Flows for CRBT and CRT services  
Q.2/11
 
Jinkyung Hwang
Email: jkhwang[at]kt.co.kr  
 
      Jong-Hwa Yi
(Co-Editor)
Email: jhyiee[at]etri.re.kr  
 
Q.CRBT (Supplement)   Signalling requirements and protocol profile for NGN Customized multimedia Ring Back Tone (CRBT)  
Q.2/11
 
Jinkyung Hwang
Email: jkhwang[at]kt.co.kr  
 
      Jong-Hwa Yi
(Co-Editor)
Email: jhyiee[at]etri.re.kr  
 
Q.CRT   Signalling requirements and protocol profile for NGN Customized multimedia Ring Tone (CBT) service  
Q.2/11
 
Jinkyung Hwang
Email: jkhwang[at]kt.co.kr  
 
      Jong-Hwa Yi
(Co-Editor)
Email: jhyiee[at]etri.re.kr  
 
Q.CDIV (Assumption of draft)   NGN Signalling control protocol communication  
Q.3/11
 
Chris Hogg
Email: chogg[at]nortel.com  
 
Q.centrexSig   Signalling Requirements and Protocol Profile for IP Centrex services  
Q.3/11
 
Tong Wu
Email: wutong[at]chinatelecom.com.cn  
 
Q.CONF (Assumption of draft)   NGN Signalling control protocol Multimedia conference service  
Q.3/11
 
Yi Gao
Email: gao.yi[at]zte.com.cn  
 
Q.ECT (Assumption of draft)   Explicit Communication  
Q.3/11
 
Yiwen Liu
Email: liu.yiwen[at]zte.com.cn  
 
Q.hold   NGN Signalling Control Protocol: Communication Hold service  
Q.3/11
 
Chris Hogg
Email: chogg[at]nortel.com  
 
Q.OIP/OIR (Assumption of draft)   NGN Signalling control protocol originating identification presentation/restriction service  
Q.3/11
 
Chris Hogg
Email: chogg[at]nortel.com  
 
Q.TIP/TIR (Assumption of draft)   NGN Signalling control protocol terminating identification presentation/restriction service  
Q.3/11
 
Chris Hogg
Email: chogg[at]nortel.com  
 
Q.3306.1   Q.3306.1 (Protocol at the interface between intra-domain Policy Decision Physical Entities (PD-PEs) (Rd interface) version 1  
Q.5/11
 
Janusz Pieczerak
Email: Janusz.Pieczerak[at]telekomunikacja.pl  
 
Q.3307.1   Q.3307.1 (Protocol at the interface between inter-domain Policy Decision Physical Entities (PD-PEs) (Ri interface) version 1  
Q.5/11
 
Mingchuan Yang
Email: yangmch[at]ctbri.com.cn  
 
      Hayashi Michiaki
(Co-Editor)
Email: mc-hayashi[at]kddi.com  
 
Q.3308.1   Q.3308.1 (Protocol at the interface between Resource Admission Control Physical Entities (RAC-PE) and Customer Premise Physical Entity (CP-PE) (Rh interface) version 1  
Q.5/11
 
Yangjung Kim
Email: zeroplus[at]hufs.ac.kr  
 
Q.3321.1   Protocol at the interface between Service Control Physical Entity (SC-PE) and Resource and Admission Control Physical Entity (RAC-PE) (Rs interface) version 2  
Q.5/11
 
Tom Taylor
Email: tom.taylor[at]rogers.com  
 
Q.3322.1   Resource control protocol no.2 (rcp2) - Protocol at the interface between Transport Resource Control Physical Entities (TRC-PEs) (Rp interface) version 2  
Q.5/11
 
Mingchuan Yang
Email: yangmch[at]ctbri.com.cn  
 
Q.3323.1   Q.3303.1 (Resource control protocol no.3 (rcp3) - Protocol at the interface between Policy Decision Physical Entity (PD-PE) and Policy Enforcement Physical Entity (PE-PE) (Rw interface) COPS Profile Version 1  
Q.5/11
 
Hexian Huang
Email: huanghexian[at]mail.ritt.com.cn  
 
Q.3323.2   Q.3303.2 (Resource control protocol no.3 (rcp3) - Protocol at the interface between Policy Decision Physical Entity (PD-PE) and Policy Enforcement Physical Entity (PE-PE) (Rw interface) H.248 Alternative version 2  
Q.5/11
 
Osamu Kamatani
Email: kamatani.osamu[at]lab.ntt.co.jp  
 
Q.3323.3   Q.3303.2 (Resource control protocol no.3 (rcp3) - Protocol at the interface between Policy Decision Physical Entity (PD-PE) and Policy Enforcement Physical Entity (PE-PE) (Rw interface) H.248 Alternative version 2  
Q.5/11
 
Hexian Huang
Email: huanghexian[at]mail.ritt.com.cn  
 
Q.3324.1   Q.3304.1 (Resource control protocol no.4 (rc43) - Protocol at the interface between Transport Resource Control Physical Entity (TRC-PE) and Transport Physical Entity (T-PE) (Rc interface) Annex A: COPS Alternative version 2  
Q.5/11
 
Tom Taylor
Email: tom.taylor[at]rogers.com  
 
Q.3324.2   Q.3304.2 (Resource control protocol no.4 (rcp4) - Protocol at the interface between Transport Resource Control Physical Entity (TRC-PE) and Transport Physical Entity (T-PE) (Rc interface) Annex B: SNMP Alternative version 2  
Q.5/11
 
Osamu Kamatani
Email: kamatani.osamu[at]lab.ntt.co.jp  
 
Q.3325.2   Q.3325.1 (Resource control protocol no.5 (rcp5) - Protocol at the interface between Policy Decision Physical Entity (PD-PE) and Transport Resource Control Physical Entity (TRC-PE) (Rt interface) in access network)  
Q.5/11
 
Dina Elabed
Email: dina.elabed[at]orange-ftgroup.com  
 
Q.ANCP   Use of the Access Node Control Protocol on the Rp Interface  
Q.5/11
 
Tom Taylor
Email: tom.taylor[at]rogers.com  
 
Q.FlowStateSig   Resource control protocol for Flow State Aware Access QoS Control in an NGN  
Q.5/11
 
John Adams
Email: john.l.adams[at]bt.com  
 
Q.PCN App   Enhancement of resource admission control to use pre-congestion notification (PCN)  
Q.5/11
 
Tom Taylor
Email: tom.taylor[at]rogers.com  
 
Q.QCP   QoS Coordination Protocol  
Q.5/11
 
Gabrielle Corliano
Email: gabrielle.2.corliano[at]bt.com  
 
      Cathy Zhou
(Co-Editor)
Email: cathy.zhou[at]huawei.com  
 
Handbook   Handbook on deployment of packet-based networks  
Q.6/11
 
Keith Mainwaring
Email: kmainwar[at]cisco.com  
 
Q.nacp.Ru   Protocol for interface for outside NACF  
Q.7/11
 
Jae-young Ahn
Email: ahnjy[at]etri.re.kr  
 
Q.NGN-nacf-mob0   Access Mobility Control in Network Attachment  
Q.7/11
 
Jianyong Chen
Email: chen.jianyong[at]zte.com.cn  
 
Q.NGN-nacf-mob1   Access Mobility Control in Network Attachment  
Q.7/11
 
Jianyong Chen
Email: chen.jianyong[at]zte.com.cn  
 
Q.NGN-nacf-mob2   Access Mobility Control in Network Attachment  
Q.7/11
 
Jianyong Chen
Email: chen.jianyong[at]zte.com.cn  
 
Q.NRFID-att.sig   Signalling requirements and protocol for Networked RFID system  
Q.7/11
 
Jae-young Ahn
Email: ahnjy[at]etri.re.kr  
 
Q.1912.5 B   Interworking between Session Initiation Protocol (SIP) and Bearer Independent Call Control Protocol (BICC) or ISDN User Part (ISUP); Part 1: Protocol Implementation Conformance Statement (PICS)  
Q.8/11
 
Martin Brand
Email: martin.brand[at]telekom.at  
 
Q.1912.5 C   Interworking between Session Initiation Protocol (SIP) and Bearer Independent Call Control Protocol (BICC) or ISDN User Part (ISUP); Part 2: Test Suite Structure and Test Purposes (TSS&TP) for Profile A and B  
Q.8/11
 
Martin Brand
Email: martin.brand[at]telekom.at  
 
Q.1912.5 D   Interworking between Session Initiation Protocol (SIP) and Bearer Independent Call Control Protocol (BICC) or ISDN User Part (ISUP); Part 3: Test Suite Structure and Test Purposes (TSS&TP) for Profile C  
Q.8/11
 
Martin Brand
Email: martin.brand[at]telekom.at  
 
Q.1912.5 E   Interworking between Session Initiation Protocol (SIP) and Bearer Independent Call Control Protocol (BICC) or ISDN User Part (ISUP); Part 4: "Abstract Test Suite (ATS) and partial Protocol Implementation eXtra Information for Testing (PIXIT) for Profile A and B"  
Q.8/11
 
Martin Brand
Email: martin.brand[at]telekom.at  
 
Q.3904   The scenarios, list and types of tests for TM local and NUT testing for IMS on the Model networks  
Q.8/11
 
Dmitri Tarasov
Email: dtarasov[at]zniis.ru  
 
Q.3905   The scenarios, list and types of tests for TM local and NUT testing for IP-TV on the Model networks  
Q.8/11
 
Dmitri Tarasov
Email: dtarasov[at]zniis.ru  
 
Q.3906   The scenarios, list and types of tests for TM local and NUT testing for Wireless Broadband on the Model networks  
Q.8/11
 
Dmitri Tarasov
Email: dtarasov[at]zniis.ru  
 
Q.3907   The scenarios, list and types of tests for TM local and NUT testing for NACF on the Model networks  
Q.8/11
 
Dmitri Tarasov
Email: dtarasov[at]zniis.ru  
 
Q.3908   The scenarios, list and types of tests for TM local and NUT testing for RACF on the Model networks  
Q.8/11
 
Dmitri Tarasov
Email: dtarasov[at]zniis.ru  
 
Q.3909   Handbook on NGN technical means testing as applied to public telecommunication networks  
Q.8/11
 
Dmitri Tarasov
Email: dtarasov[at]zniis.ru  
 
Q.3910   Monitoring parameters set for NGN protocols  
Q.8/11
 
Shaomin Wang
Email: wangshm[at]sttri.com.cn  
 
Q.3911   Monitoring parameters set for voice services in NGN  
Q.8/11
 
Shaomin Wang
Email: wangshm[at]sttri.com.cn  
 
Q.3912   Monitoring parameters set for streaming services in NGN  
Q.8/11
 
Shaomin Wang
Email: wangshm[at]sttri.com.cn  
 
Q.3913   Monitoring parameters set for Service level agreement (SLA) in NGN  
Q.8/11
 
Andrey Koucheriavy
Email: kouch[at]komset.ru  
 
Q.3914   Monitoring parameters set for wireless broadband network  
Q.8/11
 
Andrey Koucheriavy
Email: kouch[at]komset.ru  
 
Q.3915   Monitoring parameters set for wireless broadband network  
Q.8/11
 
Andrey Koucheriavy
Email: kouch[at]komset.ru  
 
Q.3916   Testing scenarios, list and types of tests for NGN (TS1) basic call and supplementary services  
Q.8/11
 
Denis Andreev
Email: denis.andreev[at]ties.itu.int  
 
Q.3917   Testing scenarios, list and types of tests for streaming services (TS1)  
Q.8/11
 
Denis Andreev
Email: denis.andreev[at]ties.itu.int  
 
Q.3918   Testing scenarios, list and types of tests for multimedia services (TS1)  
Q.8/11
 
Denis Andreev
Email: denis.andreev[at]ties.itu.int  
 
Q.3919   The types of trafffic flows which should be generated for voice, data and video  
Q.8/11
 
Andrey Koucheriavy
Email: kouch[at]komset.ru  
 
Q.3920   Types and lists of tests for QoS testing on Model networks for traffic-unloaded conditions  
Q.8/11
 
Andrey Koucheriavy
Email: kouch[at]komset.ru  
 
Q.3921   Types and lists of tests for QoS testing on Model networks for traffic-loaded conditions  
Q.8/11
 
Andrey Koucheriavy
Email: kouch[at]komset.ru  
 
Q.3922   The scenarios of QoS testing for intra-domain connectivity  
Q.8/11
 
Andrey Koucheriavy
Email: kouch[at]komset.ru  
 
Q.3923   The scenarios of QoS testing for inter-domain connectivity  
Q.8/11
 
Andrey Koucheriavy
Email: kouch[at]komset.ru  
 
Q.3924   Scenarios, types and lists of tests for SLA QoS parameters testing  
Q.8/11
 
Andrey Koucheriavy
Email: kouch[at]komset.ru  
 
Q. Conf-hold-B   Communication HOLD (CH) - Part 1: Protocol Implementation Conformance Statement (PICS)  
Q.8/11
 
Martin Brand
Email: martin.brand[at]telekom.at  
 
Q. Conf-hold-C   Communication HOLD (CH) - Part 2: Test Suite Structure and Test Purposes (TSS&TP)  
Q.8/11
 
Martin Brand
Email: martin.brand[at]telekom.at  
 
Q. Conf-OIP-OIR B   Originating Identification Presentation (OIP) and Originating Identification Restriction (OIR) - Part 1: Protocol Implementation Conformance Statement (PICS)  
Q.8/11
 
Martin Brand
Email: martin.brand[at]telekom.at  
 
Q. Conf-OIP-OIR C   Originating Identification Presentation (OIP) and Originating Identification Restriction (OIR) - Part 2: Test Suite Structure and Test Purposes (TSS&TP)  
Q.8/11
 
Martin Brand
Email: martin.brand[at]telekom.at   
 
Q. Conf-OIP-OIR D   Originating Identification Presentation (OIP) and Originating Identification Restriction (OIR) - Part 3: ATS &PIXIT  
Q.8/11
 
Martin Brand
Email: martin.brand[at]telekom.at  
 
Q.Bench IMS-NGN A   IMS/NGN Performance Benchmark Part 1: Core Concepts  
Q.8/11
 
Martin Brand
Email: martin.brand[at]telekom.at   
 
Q.Bench IMS-NGN B   IMS/NGN Performance Benchmark Part 2: Subsystem Configurations and Benchmarks  
Q.8/11
 
Martin Brand
Email: martin.brand[at]telekom.at  
 
Q.Bench IMS-NGN C   IMS/NGN Performance Benchmark Part 3: Traffic Sets and Traffic Profiles  
Q.8/11
 
Martin Brand
Email: martin.brand[at]telekom.at  
 
Q.Conf-TIP-TIR B   Terminating Identification Presentation (TIP) and Terminating Identification Restriction (TIR) - Part 1: Protocol Implementation Conformance Statement (PICS)  
Q.8/11
 
Martin Brand
Email: martin.brand[at]telekom.at  
 
Q.Conf-TIP-TIR C   Terminating Identification Presentation (TIP) and Terminating Identification Restriction (TIR) - Part 2: Test Suite Structure and Test Purposes (TSS&TP)  
Q.8/11
 
Martin Brand
Email: martin.brand[at]telekom.at  
 
Q.Conf-TIP-TIR D   Terminating Identification Presentation (TIP) and Terminating Identification Restriction (TIR) - Part 4: ATS & PIXIT  
Q.8/11
 
Martin Brand
Email: martin.brand[at]telekom.at  
 
Q.Pro-delay IMS   IMS/NGN delay probabilities  
Q.8/11
 
Martin Brand
Email: martin.brand[at]telekom.at  
 
Q.SIP-ISDN-IT B (integration tests)   Network Integration Testing between SIP and ISDN/PSTN network signalling protocols  
Q.8/11
 
Martin Brand
Email: martin.brand[at]telekom.at  
 
Q.SIP-ISDN-IT C (integration tests)   Network Integration Testing between SIP and ISDN/PSTN network signalling protocols  
Q.8/11
 
Martin Brand
Email: martin.brand[at]telekom.at  
 
Q.SIP-ISDN-IT D (integration tests)   Network Integration Testing between SIP and ISDN/PSTN network signalling protocols  
Q.8/11
 
Martin Brand
Email: martin.brand[at]telekom.at  
 
Q.iptvsa (former Q.IPTV prot arch)   Signalling and control plane architecture for IPTV  
Q.1/11
 
Ghassem Koleyni
Email: ghassem[at]rogers.com  
 
CRBT-CRT   Signalling Flows for CRBT and CRT services  
Q.2/11
 
Jinkyung Hwang
Email: jkhwang[at]kt.co.kr  
 
      Jong-Hwa Yi
(Co-Editor)
Email: jhyiee[at]etri.re.kr  
 
Q.CRBT (Supplement)   Signalling requirements and protocol profile for NGN Customized multimedia Ring Back Tone (CRBT)  
Q.2/11
 
Jinkyung Hwang
Email: jkhwang[at]kt.co.kr  
 
      Jong-Hwa Yi
(Co-Editor)
Email: jhyiee[at]etri.re.kr  
 
Q.CRT   Signalling requirements and protocol profile for NGN Customized multimedia Ring Tone (CBT) service  
Q.2/11
 
Jinkyung Hwang
Email: jkhwang[at]kt.co.kr  
 
      Jong-Hwa Yi
(Co-Editor)
Email: jhyiee[at]etri.re.kr  
 
Q.CDIV (Assumption of draft)   NGN Signalling control protocol communication  
Q.3/11
 
Chris Hogg
Email: chogg[at]nortel.com  
 
Q.centrexSig   Signalling Requirements and Protocol Profile for IP Centrex services  
Q.3/11
 
Tong Wu
Email: wutong[at]chinatelecom.com.cn  
 
Q.CONF (Assumption of draft)   NGN Signalling control protocol Multimedia conference service  
Q.3/11
 
Yi Gao
Email: gao.yi[at]zte.com.cn  
 
Q.ECT (Assumption of draft)   Explicit Communication  
Q.3/11
 
Yiwen Liu
Email: liu.yiwen[at]zte.com.cn  
 
Q.hold   NGN Signalling Control Protocol: Communication Hold service  
Q.3/11
 
Chris Hogg
Email: chogg[at]nortel.com  
 
Q.OIP/OIR (Assumption of draft)   NGN Signalling control protocol originating identification presentation/restriction service  
Q.3/11
 
Chris Hogg
Email: chogg[at]nortel.com  
 
Q.TIP/TIR (Assumption of draft)   NGN Signalling control protocol terminating identification presentation/restriction service  
Q.3/11
 
Chris Hogg
Email: chogg[at]nortel.com  
 
Q.3306.1   Q.3306.1 (Protocol at the interface between intra-domain Policy Decision Physical Entities (PD-PEs) (Rd interface) version 1  
Q.5/11
 
Janusz Pieczerak
Email: Janusz.Pieczerak[at]telekomunikacja.pl  
 
Q.3307.1   Q.3307.1 (Protocol at the interface between inter-domain Policy Decision Physical Entities (PD-PEs) (Ri interface) version 1  
Q.5/11
 
Mingchuan Yang
Email: yangmch[at]ctbri.com.cn  
 
      Hayashi Michiaki
(Co-Editor)
Email: mc-hayashi[at]kddi.com  
 
Q.3308.1   Q.3308.1 (Protocol at the interface between Resource Admission Control Physical Entities (RAC-PE) and Customer Premise Physical Entity (CP-PE) (Rh interface) version 1  
Q.5/11
 
Yangjung Kim
Email: zeroplus[at]hufs.ac.kr  
 
Q.3321.1   Protocol at the interface between Service Control Physical Entity (SC-PE) and Resource and Admission Control Physical Entity (RAC-PE) (Rs interface) version 2  
Q.5/11
 
Tom Taylor
Email: tom.taylor[at]rogers.com  
 
Q.3322.1   Resource control protocol no.2 (rcp2) - Protocol at the interface between Transport Resource Control Physical Entities (TRC-PEs) (Rp interface) version 2  
Q.5/11
 
Mingchuan Yang
Email: yangmch[at]ctbri.com.cn  
 
Q.3323.1   Q.3303.1 (Resource control protocol no.3 (rcp3) - Protocol at the interface between Policy Decision Physical Entity (PD-PE) and Policy Enforcement Physical Entity (PE-PE) (Rw interface) COPS Profile Version 1  
Q.5/11
 
Hexian Huang
Email: huanghexian[at]mail.ritt.com.cn  
 
Q.3323.2   Q.3303.2 (Resource control protocol no.3 (rcp3) - Protocol at the interface between Policy Decision Physical Entity (PD-PE) and Policy Enforcement Physical Entity (PE-PE) (Rw interface) H.248 Alternative version 2  
Q.5/11
 
Osamu Kamatani
Email: kamatani.osamu[at]lab.ntt.co.jp  
 
Q.3323.3   Q.3303.2 (Resource control protocol no.3 (rcp3) - Protocol at the interface between Policy Decision Physical Entity (PD-PE) and Policy Enforcement Physical Entity (PE-PE) (Rw interface) H.248 Alternative version 2  
Q.5/11
 
Hexian Huang
Email: huanghexian[at]mail.ritt.com.cn  
 
Q.3324.1   Q.3304.1 (Resource control protocol no.4 (rc43) - Protocol at the interface between Transport Resource Control Physical Entity (TRC-PE) and Transport Physical Entity (T-PE) (Rc interface) Annex A: COPS Alternative version 2  
Q.5/11
 
Tom Taylor
Email: tom.taylor[at]rogers.com  
 
Q.3324.2   Q.3304.2 (Resource control protocol no.4 (rcp4) - Protocol at the interface between Transport Resource Control Physical Entity (TRC-PE) and Transport Physical Entity (T-PE) (Rc interface) Annex B: SNMP Alternative version 2  
Q.5/11
 
Osamu Kamatani
Email: kamatani.osamu[at]lab.ntt.co.jp  
 
Q.3325.2   Q.3325.1 (Resource control protocol no.5 (rcp5) - Protocol at the interface between Policy Decision Physical Entity (PD-PE) and Transport Resource Control Physical Entity (TRC-PE) (Rt interface) in access network)  
Q.5/11
 
Dina Elabed
Email: dina.elabed[at]orange-ftgroup.com  
 
Q.ANCP   Use of the Access Node Control Protocol on the Rp Interface  
Q.5/11
 
Tom Taylor
Email: tom.taylor[at]rogers.com  
 
Q.FlowStateSig   Resource control protocol for Flow State Aware Access QoS Control in an NGN  
Q.5/11
 
John Adams
Email: john.l.adams[at]bt.com  
 
Q.PCN App   Enhancement of resource admission control to use pre-congestion notification (PCN)  
Q.5/11
 
Tom Taylor
Email: tom.taylor[at]rogers.com  
 
Q.QCP   QoS Coordination Protocol  
Q.5/11
 
Gabrielle Corliano
Email: gabrielle.2.corliano[at]bt.com  
 
      Cathy Zhou
(Co-Editor)
Email: cathy.zhou[at]huawei.com  
 
Handbook   Handbook on deployment of packet-based networks  
Q.6/11
 
Keith Mainwaring
Email: kmainwar[at]cisco.com  
 
Q.nacp.Ru   Protocol for interface for outside NACF  
Q.7/11
 
Jae-young Ahn
Email: ahnjy[at]etri.re.kr  
 
Q.NGN-nacf-mob0   Access Mobility Control in Network Attachment  
Q.7/11
 
Jianyong Chen
Email: chen.jianyong[at]zte.com.cn  
 
Q.NGN-nacf-mob1   Access Mobility Control in Network Attachment  
Q.7/11
 
Jianyong Chen
Email: chen.jianyong[at]zte.com.cn  
 
Q.NGN-nacf-mob2   Access Mobility Control in Network Attachment  
Q.7/11
 
Jianyong Chen
Email: chen.jianyong[at]zte.com.cn  
 
Q.NRFID-att.sig   Signalling requirements and protocol for Networked RFID system  
Q.7/11
 
Jae-young Ahn
Email: ahnjy[at]etri.re.kr  
 
Q.1912.5 B   Interworking between Session Initiation Protocol (SIP) and Bearer Independent Call Control Protocol (BICC) or ISDN User Part (ISUP); Part 1: Protocol Implementation Conformance Statement (PICS)  
Q.8/11
 
Martin Brand
Email: martin.brand[at]telekom.at  
 
Q.1912.5 C   Interworking between Session Initiation Protocol (SIP) and Bearer Independent Call Control Protocol (BICC) or ISDN User Part (ISUP); Part 2: Test Suite Structure and Test Purposes (TSS&TP) for Profile A and B  
Q.8/11
 
Martin Brand
Email: martin.brand[at]telekom.at  
 
Q.1912.5 D   Interworking between Session Initiation Protocol (SIP) and Bearer Independent Call Control Protocol (BICC) or ISDN User Part (ISUP); Part 3: Test Suite Structure and Test Purposes (TSS&TP) for Profile C  
Q.8/11
 
Martin Brand
Email: martin.brand[at]telekom.at  
 
Q.1912.5 E   Interworking between Session Initiation Protocol (SIP) and Bearer Independent Call Control Protocol (BICC) or ISDN User Part (ISUP); Part 4: "Abstract Test Suite (ATS) and partial Protocol Implementation eXtra Information for Testing (PIXIT) for Profile A and B"  
Q.8/11
 
Martin Brand
Email: martin.brand[at]telekom.at  
 
Q.3904   The scenarios, list and types of tests for TM local and NUT testing for IMS on the Model networks  
Q.8/11
 
Dmitri Tarasov
Email: dtarasov[at]zniis.ru  
 
Q.3905   The scenarios, list and types of tests for TM local and NUT testing for IP-TV on the Model networks  
Q.8/11
 
Dmitri Tarasov
Email: dtarasov[at]zniis.ru  
 
Q.3906   The scenarios, list and types of tests for TM local and NUT testing for Wireless Broadband on the Model networks  
Q.8/11
 
Dmitri Tarasov
Email: dtarasov[at]zniis.ru  
 
Q.3907   The scenarios, list and types of tests for TM local and NUT testing for NACF on the Model networks  
Q.8/11
 
Dmitri Tarasov
Email: dtarasov[at]zniis.ru  
 
Q.3908   The scenarios, list and types of tests for TM local and NUT testing for RACF on the Model networks  
Q.8/11
 
Dmitri Tarasov
Email: dtarasov[at]zniis.ru  
 
Q.3909   Handbook on NGN technical means testing as applied to public telecommunication networks  
Q.8/11
 
Dmitri Tarasov
Email: dtarasov[at]zniis.ru  
 
Q.3910   Monitoring parameters set for NGN protocols  
Q.8/11
 
Shaomin Wang
Email: wangshm[at]sttri.com.cn  
 
Q.3911   Monitoring parameters set for voice services in NGN  
Q.8/11
 
Shaomin Wang
Email: wangshm[at]sttri.com.cn  
 
Q.3912   Monitoring parameters set for streaming services in NGN  
Q.8/11
 
Shaomin Wang
Email: wangshm[at]sttri.com.cn  
 
Q.3913   Monitoring parameters set for Service level agreement (SLA) in NGN  
Q.8/11
 
Andrey Koucheriavy
Email: kouch[at]komset.ru  
 
Q.3914   Monitoring parameters set for wireless broadband network  
Q.8/11
 
Andrey Koucheriavy
Email: kouch[at]komset.ru  
 
Q.3915   Monitoring parameters set for wireless broadband network  
Q.8/11
 
Andrey Koucheriavy
Email: kouch[at]komset.ru  
 
Q.3916   Testing scenarios, list and types of tests for NGN (TS1) basic call and supplementary services  
Q.8/11
 
Denis Andreev
Email: denis.andreev[at]ties.itu.int  
 
Q.3917   Testing scenarios, list and types of tests for streaming services (TS1)  
Q.8/11
 
Denis Andreev
Email: denis.andreev[at]ties.itu.int  
 
Q.3918   Testing scenarios, list and types of tests for multimedia services (TS1)  
Q.8/11
 
Denis Andreev
Email: denis.andreev[at]ties.itu.int  
 
Q.3919   The types of trafffic flows which should be generated for voice, data and video  
Q.8/11
 
Andrey Koucheriavy
Email: kouch[at]komset.ru  
 
Q.3920   Types and lists of tests for QoS testing on Model networks for traffic-unloaded conditions  
Q.8/11
 
Andrey Koucheriavy
Email: kouch[at]komset.ru  
 
Q.3921   Types and lists of tests for QoS testing on Model networks for traffic-loaded conditions  
Q.8/11
 
Andrey Koucheriavy
Email: kouch[at]komset.ru  
 
Q.3922   The scenarios of QoS testing for intra-domain connectivity  
Q.8/11
 
Andrey Koucheriavy
Email: kouch[at]komset.ru  
 
Q.3923   The scenarios of QoS testing for inter-domain connectivity  
Q.8/11
 
Andrey Koucheriavy
Email: kouch[at]komset.ru  
 
Q.3924   Scenarios, types and lists of tests for SLA QoS parameters testing  
Q.8/11
 
Andrey Koucheriavy
Email: kouch[at]komset.ru  
 
Q. Conf-hold-B   Communication HOLD (CH) - Part 1: Protocol Implementation Conformance Statement (PICS)  
Q.8/11
 
Martin Brand
Email: martin.brand[at]telekom.at  
 
Q. Conf-hold-C   Communication HOLD (CH) - Part 2: Test Suite Structure and Test Purposes (TSS&TP)  
Q.8/11
 
Martin Brand
Email: martin.brand[at]telekom.at  
 
Q. Conf-OIP-OIR B   Originating Identification Presentation (OIP) and Originating Identification Restriction (OIR) - Part 1: Protocol Implementation Conformance Statement (PICS)  
Q.8/11
 
Martin Brand
Email: martin.brand[at]telekom.at  
 
Q. Conf-OIP-OIR C   Originating Identification Presentation (OIP) and Originating Identification Restriction (OIR) - Part 2: Test Suite Structure and Test Purposes (TSS&TP)  
Q.8/11
 
Martin Brand
Email: martin.brand[at]telekom.at  
 
Q. Conf-OIP-OIR D   Originating Identification Presentation (OIP) and Originating Identification Restriction (OIR) - Part 3: ATS &PIXIT  
Q.8/11
 
Martin Brand
Email: martin.brand[at]telekom.at  
 
Q.Bench IMS-NGN A   IMS/NGN Performance Benchmark Part 1: Core Concepts  
Q.8/11
 
Martin Brand
Email: martin.brand[at]telekom.at  
 
Q.Bench IMS-NGN B   IMS/NGN Performance Benchmark Part 2: Subsystem Configurations and Benchmarks  
Q.8/11
 
Martin Brand
Email: martin.brand[at]telekom.at  
 
Q.Bench IMS-NGN C   IMS/NGN Performance Benchmark Part 3: Traffic Sets and Traffic Profiles  
Q.8/11
 
Martin Brand
Email: martin.brand[at]telekom.at  
 
Q.Conf-TIP-TIR B   Terminating Identification Presentation (TIP) and Terminating Identification Restriction (TIR) - Part 1: Protocol Implementation Conformance Statement (PICS)  
Q.8/11
 
Martin Brand
Email: martin.brand[at]telekom.at  
 
Q.Conf-TIP-TIR C   Terminating Identification Presentation (TIP) and Terminating Identification Restriction (TIR) - Part 2: Test Suite Structure and Test Purposes (TSS&TP)  
Q.8/11
 
Martin Brand
Email: martin.brand[at]telekom.at  
 
Q.Conf-TIP-TIR D   Terminating Identification Presentation (TIP) and Terminating Identification Restriction (TIR) - Part 4: ATS & PIXIT  
Q.8/11
 
Martin Brand
Email: martin.brand[at]telekom.at  
 
Q.Pro-delay IMS   IMS/NGN delay probabilities  
Q.8/11
 
Martin Brand
Email: martin.brand[at]telekom.at  
 
Q.SIP-ISDN-IT B (integration tests)   Network Integration Testing between SIP and ISDN/PSTN network signalling protocols  
Q.8/11
 
Martin Brand
Email: martin.brand[at]telekom.at  
 
Q.SIP-ISDN-IT C (integration tests)   Network Integration Testing between SIP and ISDN/PSTN network signalling protocols  
Q.8/11
 
Martin Brand
Email: martin.brand[at]telekom.at  
 
Q.SIP-ISDN-IT D (integration tests)   Network Integration Testing between SIP and ISDN/PSTN network signalling protocols  
Q.8/11
 
Martin Brand
Email: martin.brand[at]telekom.at  

 

Top - Feedback - Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page : TSB EDH
Updated : 2008-11-11