Mitigation measures for telecommunication installations

PART 2: CASE STUDIES


Case study #

2.5

Download PDF ()

Title

Damage of 2-Mbit/s HDSL system

Type of trouble

Damage.

Source of trouble

Mistakes in bonding.

System affected

2-Mbit/s HDSL system using copper pair cable.

Location

Telecom centre.

Keywords

Damage, short circuit, mistakes in bonding.

Version date

2004-01-01

 

System configuration
In 1998, a new 2-Mbit/s HDSL (high bit rate digital subscriber line) system using paired copper cables was put into use by an operator after a pilot-use period. In the summer of 1999, several damages to it occurred. Analysis revealed that all the damaged systems had remote power feeding, and that the damage was caused by a short circuit in a protection component. The immediate action was to change existing equipment in exposed areas to local power feeding when possible, and start discussion with the manufacturer on future action.

Tests revealed that the origin of the damages was 50-Hz induction or earth potential rise voltages rather than lightning transients. The manufacturer decided to re-design the protection inside of the equipment to fulfil enhanced level power induction and earth potential rise requirements of Rec. ITU‑T K.20. Systems having this new design were installed for pilot use in spring 2000 and they worked properly all of summer 2000. However, too many systems of the original type were again damaged in 2000. Maybe there were cases where the instruction to change to local power supply was followed. A field survey also revealed another reason: improper earthing of the equipment. A practical example is shown in Figure 2.5-1.



Figure 2.5-1 – System configuration (An example of mistakes in bonding)

 

Mitigation method/Results/Conclusion

As can be seen from Figure 2.5-1, the equipment is not installed according to the manufacturer's instructions. The idea of the manufacturer was that the equipment, provided with high-current inherent protection, would be earthed via the backside of the front panel to the installation frame that is further connected to the bonding system of the telecom centre. In the damaged system, however, the installation frame was painted with non-conducting paint, and this prevented the intended contact from the backside of the panel. Moreover, the manufacturer of the installation frame had installed the bonding bar of the frame on insulating supports, and although the installation personnel had connected the bar to the bonding system, the frame was not earthed.

This example contains several general principles of problem solving methodology for the operator:

  • When a problem arises, react immediately.
  • Try to find the real reason of the problem by analysing the condition in the field and by laboratory testing.
  • Cooperate effectively with the manufacturer.
  • Check whether earthing instructions have been followed properly.
  • Check that the instructions are understood and taken into account throughout the country.
  • Arrange courses for installation personnel on practical problems and protection practices.

It also shows one particular problem of bonding: paint may sometimes cause discontinuities.

 

References

Recs ITU-T K.27, ITU-T K.35, ITU-T K.40, ITU-T K.56; Annex C.

 

 