Committed to connecting the world

  •  
ITU GSR 2024

ITU-T Recommendations

Search by number:
Others:
Skip Navigation Links
Content search
Advanced search
Provisional name
Equivalent number
Formal description
Study Groups tree viewExpand Study Groups tree view

ITU-T G.8275.1/Y.1369.1 (2016) Amd. 1 (08/2017)

عربي | 中文 | English | Español | Français | Русский

Amendment 1 to Recommendation ITU-T G.8275.1 (2016/06) provides the following updates:

− Added G.8271 to references
− Addition of a new definition: Special Port (3.2)
− Clarification on the use of logMessageInterval in Delay_Resp messages (6.2.8)
− Clarification on the behaviour of the T-BC Announce message contents when the T-BC has a parent clock.
− Incremented the minor revision number of the profileVersion (Annex A)
− Correction to the handling of the alternateMasterFlag
− Added informative text on the handling of the synchronizationUncertain flag (Annex E)
− Added monitoring of a PTP MASTER port by a PTP PASSIVE port (Annex G)
− Updates to Announce message fields of currentUtcOffset and synchronizationUncertain when using PTP clock states (Appendix V)
− Update of Appendix VII
− Added informative use cases for the use of the priority2 attribute (Appendix X)
− Added considerations on native access equipment (Appendix XI)
− Added monitoring alternate master time information provided by a peer PTP port (Appendix XII)
Citation: https://handle.itu.int/11.1002/1000/13329
Series title: G series: Transmission systems and media, digital systems and networks
  G.8000-G.8999: Packet over Transport aspects
  G.8200-G.8299: Synchronization, quality and availability targets
Y series: Global information infrastructure, Internet protocol aspects, next-generation networks, Internet of Things and smart cities
  Y.1000-Y.1999: Internet protocol aspects
  Y.1300-Y.1399: Transport
Approval date: 2017-08-29
Approval process:AAP
Status: Superseded
Maintenance responsibility: ITU-T Study Group 15
Further details: Patent statement(s)
Development history