Scheduled Rapporteur Meetings for SG 12 Questions (June 2009 – November 2009)
Notes:
Many meeting dates and venues were not finalized at the time of the Study Group 12 meeting, and
they will be confirmed at a later stage. The meetings noted as "planned" were pre-approved by
SG 12 and will be confirmed once sufficient number of participants and contributions is ensured.
Question |
Date |
Place |
Host |
Objectives |
Remarks |
7/12 |
29-30 June 2009 |
Lannion, France |
France Telecom |
-
review and
analysis of test results of the SWB extension of G.722 and G.711.1;
-
work on
multidimensional testing methodology;
-
preparation of
test plan for CarCom, if needed;
-
finalization of
G.718 – G.729.1 SWB extension test plan and G.711 extension test
plan.
|
Confirmed |
7/12 |
5–9 October 2009 |
Lannion, France |
France Telecom |
-
review and
analysis of test results of the SWB extension of G.718 and G.729.1;
-
review and
analysis of test results of extension of G.711
-
preparation of
test plan for the next phase of G.711.1 and G.722 SWB extension;
-
progress on
technical paper
-
work on
multidimensional testing methodology
-
finalize test plan
for CarCom, if needed
-
progress on
Handbook;
-
analysis of test
results received in attachment of section 11 of TD 7 (GEN/12).
|
Confirmed |
9/12 |
Early October 2009 |
tbd (consult Q9/12 email reflector) |
tbd |
-
evaluation of the
results obtained in the P.OLQA selection phase and drafting a
contribution to SG12.
|
planned |
13/12
(joint meeting with 14/12 & 17/12) |
15-18
June 2009 |
Stockholm, Sweden |
Ericsson |
-
update draft new
Recommendations G.RQAM, G.OMVAS, G.IPTV-PMR, G.IPTV-PMPD,
G.IPTV-PMMM;
-
discussion on the
model development procedure and test plan for G,OMVAS,
-
discussion of
G.chirp and G.KPI, if there are any contributions.
|
confirmed |
13/12 |
October 2009 |
tbd (consult Q13/12 email reflector) |
tbd |
-
update draft new
Recommendations G.RQAM, G.OMVAS, G.IPTV-PMR, G.IPTV-PMPD,
G.IPTV-PMMM;
-
discussion on the
model development procedure and test plan for G,OMVAS,
-
discussion of
G.chirp and G.KPI, if there are any contributions.
|
planned |
14/12
(joint meeting with 13/12 &
17/12) |
15-18 June 2009 |
Stockholm, Sweden |
Ericsson |
-
procedure and time
plan for P.NAMS development;
-
Terms of Reference
for P.NAMS
-
validation and
test plan for P.NAMS,
-
Terms of Reference
for P.NBAMS.
|
confirmed |
15/12 |
September 2009 |
Possibly Lannion, France (consult Q15/12 email reflector) |
tbd |
-
Progress with
draft new Recommendation G.CQO-L;
-
Progress detailed
development of subjective test conditions for the validation of the
models.
|
planned |
17/12
(joint meeting with 13/12 &
14/12) |
15-18
June 2009 |
Stockholm, Sweden |
Ericsson |
-
Advancement of a
revised version of Y.1540, including the new parameters now
described in Appendices
-
Advancement of new
Recommendation Y.154HN covering home network performance
-
Contributions
investigating how these new performance parameters can possibly
advance the work of Q13 & Q14;
-
Other topics as
necessary, such as methods of measurement, or in any areas where
contributions are encouraged in the work plan.
|
confirmed |
|