International Telecommunication Union   ITU
عربي  |  中文  |  Español  |  Français  |  Русский
 
 Advanced Search Advanced Search Site Map Contact us Print Version
 
Home : ITU-T Home : Study Groups : ITU-T Study Group 12
   
Study Group 12 - Rapporteur Meetings

Scheduled Rapporteur Meetings for SG 12 Questions (June 2009 – November 2009)

Notes:
Many meeting dates and venues were not finalized at the time of the Study Group 12 meeting, and they will be confirmed at a later stage. The meetings noted as "planned" were pre-approved by SG 12 and will be confirmed once sufficient number of participants and contributions is ensured.

Question Date Place Host Objectives Remarks
7/12 29-30 June 2009 Lannion, France France Telecom
  • review and analysis of test results of the SWB extension of G.722 and G.711.1;
  • work on multidimensional testing methodology;
  • preparation of test plan for CarCom, if needed;
  • finalization of G.718 – G.729.1 SWB extension test plan and G.711 extension test plan.
Confirmed
7/12 5–9 October 2009 Lannion, France France Telecom
  • review and analysis of test results of the SWB extension of G.718 and G.729.1;
  • review and analysis of test results of extension of G.711
  • preparation of test plan for the next phase of G.711.1 and G.722 SWB extension;
  • progress on technical paper
  • work on multidimensional testing methodology
  • finalize test plan for CarCom, if needed
  • progress on Handbook;
  • analysis of test results received in attachment of section 11 of TD 7 (GEN/12).
Confirmed
9/12 Early October 2009 tbd (consult Q9/12 email reflector) tbd
  • evaluation of the results obtained in the P.OLQA selection phase and drafting a contribution to SG12.
planned
13/12
(joint meeting with 14/12 & 17/12)
15-18 June 2009 Stockholm, Sweden Ericsson
  • update draft new Recommendations G.RQAM, G.OMVAS, G.IPTV-PMR, G.IPTV-PMPD, G.IPTV-PMMM;
  • discussion on the model development procedure and test plan for G,OMVAS,
  • discussion of G.chirp and G.KPI, if there are any contributions.
confirmed
13/12 October 2009 tbd (consult Q13/12 email reflector) tbd
  • update draft new Recommendations G.RQAM, G.OMVAS, G.IPTV-PMR, G.IPTV-PMPD, G.IPTV-PMMM;
  • discussion on the model development procedure and test plan for G,OMVAS,
  • discussion of G.chirp and G.KPI, if there are any contributions.
planned
14/12
(joint meeting with 13/12 & 17/12)
15-18 June 2009 Stockholm, Sweden Ericsson
  • procedure and time plan for P.NAMS development;
  • Terms of Reference for P.NAMS
  • validation and test plan for P.NAMS,
  • Terms of Reference for P.NBAMS.
confirmed
15/12 September 2009 Possibly Lannion, France (consult Q15/12 email reflector) tbd
  • Progress with draft new Recommendation G.CQO-L;
  • Progress detailed development of subjective test conditions for the validation of the models.
planned
17/12
(joint meeting with 13/12 & 14/12)
15-18 June 2009 Stockholm, Sweden Ericsson
  • Advancement of a revised version of Y.1540, including the new parameters now described in Appendices
  • Advancement of new Recommendation Y.154HN covering home network performance
  • Contributions investigating how these new performance parameters can possibly advance the work of Q13 & Q14;
  • Other topics as necessary, such as methods of measurement, or in any areas where contributions are encouraged in the work plan.
confirmed

 

Top - Feedback - Contact Us -  Copyright © ITU 2010 All Rights Reserved
Contact for this page : TSB EDH
Updated : 2010-01-04