Work item | Question | Equiv. Num. | Status | Timing | Approval process | Version | Liaison relationship | Subject / Title | Priority |
G.988 (2022) Amd.2 | Q2/15 | | Under study | 2024-07 | AAP | - | - | ONU management and control interface (OMCI) specification - Amendment 1 | - |
G.9802 Amd.2 | Q2/15 | | Under study | 2024-07 | AAP | New | - | Multiple-wavelength passive optical networks (MW-PONs) | - |
G.9802.2 (2022) Amd.1 | Q2/15 | | Under study | 2024-07 | AAP | - | - | Wavelength Division Multiplexed Passive Optical Network: Physical media dependent (PMD) and Transmission Convergence (TC) Amd.1 | - |
G.9804.2 (2021) Amd.2 | Q2/15 | | Under study | 2024-07 | AAP | New | - | Higher Speed Passive Optical Networks - Common Transmission Convergence layer Specification - Amendment 2 | - |
G.9805 Amd.2 | Q2/15 | | Under study | 2025 | AAP | - | - | Coexistence of Passive Optical Network Systems Amendment 2 | Medium |
G.9806 Cor.2 | Q2/15 | | Under study | 2024-07 | AAP | New | - | Higher-speed bidirectional, single fibre, point-to-point optical access system (HS-PtP) - Corrigendum 2 | Medium |
G.hsp.TWDMpmd | Q2/15 | | Under study | 2025 | AAP | New | Potential connection with project under development in IEEE P802.3 | Higher Speed Passive Optical Networks: TWDM PMD | - |
G.sup.eOLT | Q2/15 | | Under study | 2024-07 | Agreement | New | - | Enhanced optical line termination with IT functions | Medium |
G.sup.OANops | Q2/15 | | Under study | 2024-07 | Agreement | New | - | Operational aspects of optical access | - |
G.sup.PONsec | Q2/15 | | Under study | 2024-07 | Agreement | New | - | Practical aspects of PON security | - |
G.suppl.FTTGrid | Q2/15 | | Under study | 2025 | Agreement | - | - | Fibre to the grid use cases and network requirements | Medium |
G.suppl.VHSP | Q2/15 | | Under study | 2025 | Agreement | New | - | PON transmission technologies above 50 Gb/s per wavelength | Medium |
TR-OFCS | WP2/15 | | Under study | 2024 | Agreement | Rev. | - | Optical fibres, cables and systems | Medium |
G.9943 (ex G.fin-NM) | Q3/15 | | Under study | 2024 | AAP | New | Broadband Forum, ETSI ISG F5G, CCSA TC6 WG2 | High speed fibre-based in-premises transceivers - network management | Medium |
G.9962 (2023) Amd1 | Q3/15 | | Under study | 2024 | TAP | - | - | Unified high-speed wire-line based home networking transceivers - Management Specification - Amendment 1 | - |
G.fin-DLL | Q3/15 | | Under study | 2024 | AAP | New | Broadband Forum, ETSI ISG F5G, CCSA TC6 WG2 | High speed fibre-based in-premises transceivers - data link layer | Medium |
G.fin-XDLL | Q3/15 | | Under study | 2025 | AAP | - | - | High speed fibre-based in-premises transceivers - 10G data link layer | Medium |
G.fin-XPHY | Q3/15 | | Under study | 2025 | AAP | - | - | High speed fibre-based in-premises transceivers - 10G Physical layer | Medium |
G.hetnet | Q3/15 | | Under study | 2024 | AAP | New | ITU-T SG9, Wi-Fi Alliance, Broadband Forum, MoCA Alliance | Terminology & overview of the architecture of Heterogeneous Home Networks | - |
G.hn2 | Q3/15 | | Under study | 2024 | AAP | New | - | Evolution of unified high-speed wire-line based home networking transceivers | Medium |