CONTENTS

Policy on Intellectual Property Right (IPR)
Annex 1  Field report on the applied methodology used by Germany to protect the broadcast service when implementing  the IMT service in the 800 MHz band
        1.1     Background
        1.2     Frequency engineering and regulatory framework and key assumptions
        1.3     Steps for a computer-assisted standard procedure for determining compatibility between LTE and broadcasting in specific cases before setting the site-related usage parameters for an LTE base station
        1.4     Compatibility with broadcast service in neighboring countries
        1.5     Conclusion
Annex 2  Preliminary national field report on the introduction of IMT downlinks in the 800 MHz band with co-primary allocation to the broadcasting and the mobile services in France
Annex 3   Interim national field report on the LTE rollout in the 800 MHz band in the Netherlands
Annex 4  Field report on interference to 800 MHz band IMT base stations in Portugal from DTTB transmissions in Spain