Policy on Intellectual Property Right (IPR)
1 Introduction
2 Scope
3 Related text references
3.1 List of acronyms
and abbreviations
4 Summary of submissions
5 Conclusion for Steps 4 to 7
5.1 Results of Steps
4, “Evaluation of candidate RITs or SRITs by Evaluation Groups” and Step 5,
“Review and coordination of outside evaluation activities”
5.1.1 Summary
of the evaluations received for candidate SRIT/RIT submissions
5.1.2 Summary
of the evaluations received for the candidate SRIT submission from ETSI (TC
DECT) and DECT Forum (Document IMT-2020/17(Rev.1))
5.1.3 Summary
of the evaluations received for the candidate RIT submission (Document IMT-2020/18(Rev.1))
from Nufront
5.1.4 Summary
of the evaluations received for the candidate RIT submission (Document
IMT-2020/19(Rev.1)) from TSDSI
5.2 Results of Step 6,
“Review to assess compliance with minimum requirements”
5.2.1 Results
of assessment in Step 6 for the candidate SRIT submission (Document IMT‑2020/13)
from 3GPP Proponent
Step 6 assessment for SRIT proposal (Document IMT‑2020/13) from
3GPP Proponent
5.2.2 Results
of assessment in Step 6 for the candidate RIT submission (Document IMT‑2020/14)
from 3GPP Proponent
Step 6 Assessment for RIT proposal (Document IMT-2020/14) from 3GPP
Proponent:
5.2.3 Results
of assessment in Step 6 for the candidate RIT submission (Document IMT‑2020/15)
from China (People’s Republic of)
Step 6 assessment for RIT proposal (Document IMT‑2020/15) from
China (People’s Republic)
5.2.4 Results
of assessment in Step 6 for the candidate RIT submission (Document IMT‑2020/16)
from Korea (Republic of)
Step 6 assessment for RIT proposal (Document IMT-2020/16) from Korea
(Republic of):
5.2.5 Results
of assessment in Step 6 for the candidate RIT submission (Document
IMT-2020/19(Rev.1)) from TSDSI
Step 6 Assessment for RIT proposal (Document IMT-2020/19(Rev.1))
from TSDSI:
5.3 Result of Step 7,
“Consideration of evaluation results, consensus building and decision”
5.3.1 Consideration
of evaluation results
5.3.2 Consensus
building and decision
6 Characteristics of the
technologies and basis of the specifications for Step 8
6.1 Detailed
specifications for the radio interface technologies for IMT‑2020 in
Step 8
6.1.1 Characteristics
of radio interface technologies for IMT-2020 in Step 8 for the candidate SRIT
submission (Document IMT‑2020/13) from 3GPP Proponent
6.1.2 Characteristics
of radio interface technologies for IMT-2020 in Step 8 for the candidate RIT
submission (Document IMT-2020/14) from 3GPP Proponent
6.1.3 Characteristics
of radio interface technologies for IMT-2020 in Step 8 for the candidate RIT
submission (Document IMT-2020/19(Rev.1)) from TSDSI
Annex 1 Index of IMT-2020 documents for each final submission
Annex 2 Summary and details of Evaluation Reports from Independent
Evaluation Groups
Annex 3 Detailed compliance template summaries
A Candidate submission from 3GPP
Proponent (IMT‑2020/13)
B Candidate submission from 3GPP
Proponent (IMT-2020/14)
C Candidate submission from China
(People’s Republic of) (IMT-2020/15)
D Candidate submission from Korea
(Republic of) (IMT-2020/16)
E Candidate submission from TSDSI
(IMT-2020/19(Rev.1))