Policy on Intellectual Property Right (IPR)
Annex
Design guidelines for developing automated spectrum management systems
1 Operational guidelines
1.1 Processing of application for the use of spectrum
1.2 Frequency allocation
plan/channel processing
1.3 Licence processing
1.4 Fee processing
1.5 Report processing
1.6 Complaint processing
1.7 Reference tables
processing
1.8 Security processing
1.9 Transaction processing
2 Record keeping guidelines
3 Engineering analysis guidelines
4 International frequency
coordination
5 Submission of notices to the BR
6 Licensing fees and fee
collection
7 Monitoring
8 Equipment approval process
9 Report generation
9.1 Licence printing
9.2 Record summary
9.3 Record detail
9.4 Transaction activity
reports
9.5 Expiration and renewal
notice
9.6 Summary status reports
9.7 Status reports
10 User interface
11 Data processing guidelines
11.1 Records
11.2 Data entry
11.3 Data modification
11.4 Data back‑up and
archiving
11.5 Database inquiry
11.6 Validation
11.7 Record status
11.8 Program parameters
modification
11.9 Data migration
11.10 Data content
11.11 Data export
12 Hardware/software environment
12.1 Hardware guidelines
12.2 Software guidelines
13 Geographic map display
functions
13.1 Point-to-point profile
13.2 Coverage
13.3 GIS system
13.4 GIS software
14 Documentation
15 Training