• 1 Scope
  • 2 References
  • 3 Definitions
    • 3.1 Terms defined elsewhere
    • 3.2 Terms defined in this Recommendation
  • 4 Abbreviations and acronyms
  • 5 Conventions
  • 6 Needs and goals
  • 7 Installation general requirements
  • 8 Prior to installation
    • 8.1 Requirements for infrastructure for DSA cable installation
      • 8.1.1 Cable installation on the ground surface
      • 8.1.2 Cable shallow burial
      • 8.1.3 Cable aerially suspended
      • 8.1.4 Cable submerging
    • 8.2 Installation planning
      • 8.2.1 Cable route consideration
      • 8.2.2 Selection of the cable and installation schemes
      • 8.2.3 Cable segment and cable length considerations
      • 8.2.4 Cable tension consideration
      • 8.2.5 Installation temperature
    • 8.3 Pilot test of a DSA cable installation
      • 8.3.1 Introduction
      • 8.3.2 Test plans
    • 8.4 Training of installation crews
  • 9 Installation methods
    • 9.1 General considerations
    • 9.2 Installation procedure and cable handling
      • 9.2.1 Cable installation from a drum
      • 9.2.2 Cable bend protection
      • 9.2.3 Passing the cable to the other side of a river, lake or valley
  • 10 Risks with insufficient infrastructure and remedies
    • 10.1 Risks
    • 10.2 Remedies
  • Appendix I Japanese experience: example of DSA cable performance
  • Appendix II Japanese experience: a temperature test of an example DSA cable
  • Appendix III Tanzania experience
    • III.1 Introduction
    • III.2 Optic fibre trench
    • III.3 Optic fibre cable laying
    • III.4 Cable maintenance
    • III.5 Length of the cable
    • III.6 Cable crossing roads and bridges
    • III.7 Optic fibre cable crossing water or dam
  • Appendix IV Rwanda experience
    • IV.1 Introduction
    • IV.2 The criteria for optical fibre cable installation with minimal existing infrastructure
  • Appendix V Japanese experiences on the DSA cable installation
    • V.1 Successful use of Japanese DSA cables under difficult environment
    • V.2 Underwater
    • V.3 Fire resistance
  • Appendix VI Indian experience
    • VI.1 Introduction
    • VI.2 Climatic considerations
    • VI.3 MTBF and MTTR
  • Appendix VII Democratic Republic of the Congo experience
    • VII.1 Introduction
    • VII.2 The local broadband network in the Democratic Republic of the Congo
  • Bibliography