1
Scope
2 References
3 Terms and definitions
4 Abbreviations
5 Exchange of information and
coordination
6 Measurements
7 Bringing into service tests
7.1 Continuity test
7.2 Test15m
7.3 Test2h
7.4 Test24h
8 Bringing into service procedures
8.1 Initial measurements of a section
8.1.1 General
8.1.2 BIS testing procedure
8.2 Initial measurements of a path
8.2.1 Determining the BIS limits
8.2.2 General considerations on BIS testing procedure
8.3 Bringing into service more than
one path at the same time and with identical routing
8.3.1 Procedure for bringing into service multiple
tributaries on an existing higher order path with identical routing
8.3.2 Procedure for bringing into service multiple tributaries on a new
higher order path with identical routing
8.4 BIS of more than one path with not
identical routing
8.5 Contingency planning