Committed to connecting the world

WTISD

Meeting results

Executive Summary of the ITU-T Study Group 11 Meeting
(Geneva, 25 February - 01 March 2013)


Study Group 11 meeting was held in Geneva, from 25 February to 1 March 2013 and was attended by 72 delegates from 22 countries. Along with face-to-face meetings, five sessions from various Questions or joint Questions meetings were supported by remote participation capabilities.

1. Consented Recommendations (ITU-T A.8)
The following table shows the ‘Consented’ draft Recommendations 

#​ Question​ Rec.​ Status​ Title​ Final TD GEN​ A.5 justification
1​ 11/11​ ITU-T Q.3946.2​ New​ “IETF SIP RFC3261 Conformance Tests Specification; Part 2: Test Suite Structure and Test Purposes (TSS&TP)”​ TD102/GEN11​ TD103 Rev.1 (GEN/11)
2​ 11/11​ ITU-T Q.3943.2​ New​ Originating Identification Presentation (OIP) and Originating Identification Restriction (OIR) using IP Multimedia (IM) Core Network (CN) subsystem; Conformance Tests Specification, Network side, Part 2: Test Suite Structure and Test Purposes (TSS&TP)​ TD104/GEN11​ TD138 (GEN11)​
3​ 11/11​ ITU-T Q.3943.3​ New​ Originating Identification Presentation (OIP) and Originating Identification Restriction (OIR) using IP Multimedia (IM) Core Network (CN) subsystem; Conformance Tests Specification; User side Part 4: Test Suite Structure and Test Purposes (TSS&TP​ TD105/GEN11​ TD113 Rev.1 (GEN/11)
4​ 11/11​ ITU-T Q.3943.1​ New​ Originating Identification Presentation (OIP) and Originating Identification Restriction (OIR) using IP Multimedia (IM) Core Network (CN) subsystem; Conformance test specification; Part 1: Protocol Implementation Conformance Statement (PICS)​ TD106/GEN11​ TD136 (GEN/11)​
5​ 11/11​ ITU-T Q.3942.1​ New​ Terminating Identification Restriction (TIR) using IP Multimedia (IM) Core Network (CN) subsystem; Conformance Test Specification;" Part 1: Protocol Implementation Conformance Statement (PICS)"​ TD111/GEN11 TD137 (GEN11)​
 

 2. Supplements, Handbooks and Technical Papers

2.1 Supplement
No Supplements were approved at this meeting.

2.2 Handbooks
No Handbooks were approved at this meeting.

2.3 Technical Papers
No Technical papers were approved at this meeting.

3. SG 11 Structure and Management

The following Structure was approved:
WP 1: Signalling requirements and protocol for emerging networks  
            (Questions: 1, 2, 3/11)
            WP 1 Chairman: Jane Humphrey (Ericsson Limited)
            WP 1 Vice-chair: Xiaojie Zhu (China Telecom)
WP 2: Software-Defined Networking (SDN) and resource control  
           (Questions: 4, 5, 6/11)
           WP 2 Co-Chairman: Kaoru Kenyoshi (NEC Europe Ltd.)
           WP 2 Co-Chairman: Ting [Tina] Zou [Tsou] (Huawei Technologies Co., Ltd.)
WP 3: Attachment and service networking, including IoT and M2M
           (Questions: 7, 8, 9/11)
           WP 3 Chairman: Shin-Gak Kang (ETRI)
           WP 3 Vice-chair: Issaac Boateng (Ghana)
WP 4: Conformance and Interoperability (C&I) testing
           (Questions: 10, 11, 12, 13, 14, 15/11)
           WP 4 Chairman: Martin Brand (A1 Telekom Austria AG)
           WP 4 Vice-chair: Dmitri Tarasov (Russian Federation)

4. Questions
The meeting noted Contribution 1, which includes the set of Questions for the new study period that were approved by WTSA-12.

A revised text for Question 11/11 – Protocols and networks test specifications; frameworks and methodologies – was agreed. The revised text is to follow up on WTSA-12’s instruct to SG 11 and SG 17 to discuss the best way to transfer from SG17 to SG11 the part of Q12/17 (ex QS/17, continuation of Q14/17) on TTCN-3. SG11 and SG 17 experts held various electronic meetings in January 2013 to find a solution. By agreement among both Study groups it was decided that TTCN-3 development and maintenance work stays in SG17, which is lead SG on formal languages, while the part of QS/17 on conformance testing and methodologies and framework move to SG11. TD 33 (GEN/11) and TD 34 (GEN/11) were submitted to both SG11 and SG 17 with the goal to issue the same proposal via LS to TSAG. The liaison statement included in TD 34 (GEN/11) will be sent via liaison statement to TSAG for endorsement.

5. Liaison officers and Rapporteurs
The list of Rapporteurs can be found in TD 32 Rev.3 (GEN/11).
The list of Liaison Officers can be found in TD 29 Rev.2 (GEN/11).

6. FG M2M Service Layer
FG M2M mandate was extended of eight months, until the end of 2013 (see TD-36 ”Report on the activities of FG M2M”)

7. Outgoing Liaison Statements
The following table shows the list of the twenty agreed outgoing liaison statements. See
TD 27 (GEN/11).

# ​WP/11 Questions​ For​ To​ ​Title Ref.​
​1 ​1 1​ ​Information ITU-T SG2​ Telecommunication Management and OAM Project Plan​ TD 072 (GEN/11)
​2 ​2 4​ ​Action Broadband Forum Technical Committee Chair Liaison to Broadband Forum on Policy Control Procedures​ TD 075 Rev.1 (GEN/11)
​3 ​2 ​4 ​Comment ITU-T SG2​13 ​New work item on "Interface and Signalling Requirements and Specification for Cross Stratum Optimization" TD 112 (GEN/11)
​4 ​3 ​8 ​​Action ITU-T SG213 Guidelines for implementations of signalling requirements and protocols​ TD 121(GEN/11)
​5 ​3 ​8 ​Action ITU-T SG12​ Guidelines for implementations of signalling requirements and protocols​ TD 122 Rev.1 (GEN/11)
​6 ​3 ​8 ​Information​ ITU-D SG2 Q26/2;​ Migration from existing network to NGN for developing countries; Technical, Regulatory and Policy aspects​ TD 123 Rev.1 (GEN/11)
​7 ​3 ​8 ​Action​ ITU-D SG2 Q26/2; ​Guidelines for implementations of signalling requirements and protocols TD 124 Rev.1 (GEN/11)
​8 ​3 ​8 ​Information​ ​ITU-D SG1 Correspondent group on the elaboration of working Definition of ICT​ TD 125 Rev.1 (GEN/11)
9  3 ​9 ​ ​Action​ ISO/IEC JTC 1/SC 6/WG 7​ Collaboration with ISO/IEC JTC 1/SC 6/WG 7 on managed peer-to-peer communications​ TD 127 Rev.1 (GEN/11)​
​10 ​ ​4 ​ ​10, 11, 12, 14, 15 ​ ​Action​ ITU-T SG 5, 9, 12, 13, 15, 16 and 17​ Request to all Study Groups to update the reference table of ITU-T Recommendations to be tested for conformity/interoperability, parameters and available test suite​s​ ​ ​TD 077 (GEN/11)​
​Information​ JCA-CIT​
​11 ​ ​4 ​ ​10, 11, 12, 14, 15​ ​ ​Action​ ​TSAG ​ ​Revised ToR of JCA-CIT ​ ​TD 078(GEN/11)​
​Information​ ​JCA-CIT
​12 ​ ​4 ​ ​​10, 11, 12, 14, 15 ​ ​Action​​ ​ITU-T SG15 Reply to Request to fill a) living list table of technologies suitable for testing and b) list of possible pilot projects for conformity assessment against ITU-T Recommendations​ ​ TD 079(GEN/11)​​​​ ​
​Information​ JCA-CIT, SG 9, SG 13, SG 16, ISO/IEC JTC1, BROADBAND FORUM, IEC, HGI, IEEE SA, Home Grid Forum​
​13 ​ ​4 ​ ​10, 11, 12, 14, 15​ ​ ​Action​​ ITU-T SG 5, 9, 12, 13, 15, 16 and 17​ Request to fill a) living list of technologies suitable for testing and b) list of possible pilot projects for conformity assessment against ITU-T Recommendations​ ​ TD 080 Rev.1 (GEN/11)​​
​Information​​​ ​JCA-CIT
​14 ​4 12​ ​Information​ JCA-SG&HN​ Reply liaison: Activities related to smart grid​ TD 108 Rev.1 (GEN/11)
​15 ​4 ​14 ​Information​ ​JCA-CLOUD SG11 inputs to ITU-T JCA Cloud roadmap​ TD 116 (GEN/11)​
​16 ​4 ​11 ​Action​​​ TSAG; SG17​ Liaison to TSAG on alignment of testing work between SG11 and SG17​ TD 034 (GEN/11)​
​17 ​4 ​12 ​Information​ ​ITU-T SG5​ Reply liaison: Creation of a new Focus Group on “Smart and Sustainable Cities” (FG-SSC)​ ​TD 109 (GEN/11)​
​18 ​ ​4 ​ ​12 ​ ​Action​​​ IoT-GSI​ Reply liaison: Internet of Things Work Plan​ ​ TD 110 (GEN/11)​
​Information​​ JCA-IoT​
​19 ​Plen ​All ​Action​​​​ ​TSAG Study of signalling requirement and protocol on SDN​ TD 135(GEN/11)​​
​20 ​Plen ​All ​Action​​​ ​ISO/IEC JTC 1 Fast-track of revised Rec. ITU-T X.603 | ISO/IEC 16512-1 and revised Rec. ITU-T X.603.1 | ISO/IEC 16512-2​ TD 134 (GEN/11)​
 

8. Work plan for interim Working Party and Rapporteur meetings
Interim meetings plan as agreed at SG11 Plenary (Geneva, 25 February-1 March 2013).

8.1 Working parties

WP ​Date ​Place/Host Terms of reference​ Contact​
WP1/11 ​21 June 2013 Geneva​
 - To consider approval of the following candidate draft Supplements: Draft TRQ.ets-protocol (Signalling Protocol Mappings in Support of Emergency Telecommunications Service in IP Networks) and Draft TRQ.ETS-Overview Revision (Overview of Standards Development Organizations (SDOs) and Other Organizations’ Work on Emergency Telecommunications Service (ETS))
- To discuss the progress of work on the draft Recommendations under study in Qs 1, 2, 3/11​
Jane Humphrey
jane.humphrey@ericsson.com

Xiaojie Zhu
zhuxj@gsta.com
​WP2/11 ​21 June 2013 ​Geneva  ​- To consider CONSENT (AAP) of the following candidate draft Recommendations: Q.3301.1  v3 Protocol at the Rs interface between service control entities and the policy decision physical entity: Diameter Profile
 - To discuss the progress of work on the draft Recommendations under study in Qs 4, 5, 6/11.
​Kaoru Kenyoshi

8.2 Rapporteur groups

Question ​Date Place/Host​ ​Terms of reference Contact​
1/11
​17-21 June 2013
(2 Sessions)
Geneva​
- Progress on the new studies relating to the signaling requirements and architecture.
Xiaojie Zhu
zhuxj@gsta.com
​2/11
​17-21 June 2013
(3 Sessions)
Geneva​ - To progress work on draft Recommendations under study, including Q.CDIV, Q.OIP/OIR, Q.TS-IVR-PROT, Q.WebMidCall, Q.TIP/TIR, and Q.ProGeoSMS.​

​Hongjian Wu
wuhongjian@catr.cn
Hideo Himeno
h-nimeno@bc.jp.nec.com

​3/11
​17-21 June 2013
(2 Sessions)
​Geneva​
- To finalize draft TRQ.ets-protocol and TRQ.ETS-Overview for  approval
- To consider any new work item(s)

Viqar Shaikh
vshaikh@appcomsci.com

​4/11
​17-21 June 2013
(6 Sessions)
Geneva​​
- To finalize for Consent the draft: Q.3301.1  v3
- To progress work on draft Recommendations under study​

Matt Lopez
matt@technicalcure.com

​5/11
​17-21 June 2013
(3 Sessions)
Geneva​​
- To progress work on draft Recommendations under study
Junfeng Ma
majunfeng@catr.cn
​6/11
​17-21 June 2013
(3 Sessions)
Geneva​​
- To progress work on draft Recommendations under study

​Cathy Zhou
cathy.zhou@huawei.com

​9/11
​24-28 June 2013
(3 Sessions)
​Geneva​
- To progress work on draft Recommendations under study
​- To discuss new work item proposals

Shin-Gak Kang
sgkang@etri.re.kr

​14/11
​17-21 June 2013
(3 Sessions)
​Geneva​ - Handle the input contributions and incoming liaisons.
- Progress on the new studies relating to the cloud computing interoperability testing
​Hideo Himeno
 

9. Next Study Group 11 meeting
The next SG 11 meeting is scheduled in Uganda, on 6-15 November 2013.