Committed to connecting the world

WTISD

SG11: Signalling requirements, protocols, test specifications and combating counterfeit products

​​Executive summary of the SG11 meeting (Geneva, 6-15 February 2017)

Study Group 11 meeting was held in Geneva, from 6-15 February 2017 and was attended by 90 delegates from 27 countries. Along with face-to-face meetings, most sessions from various Questions or joint Questions meetings were supported by remote participation capabilities.

The SG11 meeting was co-located with:

1       Approved and Consented Recommendations (ITU-T A.8)
The following table shows the ‘Consented’ draft Recommendations

#QuestionWP/11Draft new/revised Rec. No.TitleFinal TD PLENA.5 justification
11/111/11ITU-T Q.3053
(formerly Q.Arc-IPSMS)
Signalling architecture and requirements for IP based short message service over ITU-T defined NGNTD 159TD 148
22/111/11ITU-T Q.3630 v.1Inter-IMS Network to Network Interface (NNI)TD 140TD 127
35/111/11ITU-T Q.3713 (formerly Q.BNG-Pool)Signalling requirements for BNG (Broadband Network Gateway) poolTD 138 Rev.1N/A


2.       Supplements, Handbooks, Technical Papers, Guidelines and Corrigenda
2.1     Supplements
No Supplements were approved at this meeting.

2.2      Guidelines
The following table shows the approved draft Guidelines

#QuestionWP/11GuidelinesTitleFinal TDA.5 justification
​1​CASC​ITU-T SG11 Guideline​ITU-T CASC procedure to appoint ITU-T technical expertsTD 144​N/A

2.3      Handbooks
No Handbooks were approved at this meeting.

2.4      Technical Papers
The following table shows the approved draft Technical Report

QuestionWP/11Technical ReportTitleFinal TDA.5 justification
​1​15/11​3/11​Survey Report​Survey report on counterfeit ICT devices in Africa regionTD 1199 Rev.1​N/A

2.5       Corrigenda
No Corrigenda were approved at this meeting.

3          SG11 Structure and Management

The structure and management of SG11 as presented in TD 62 Rev.5 was endorsed by the meeting
SG11 structure and Management team is therefore confirmed as follows:

WP1: Signalling requirements and protocols for emerging telecommunications networks
(Questions: 1, 2, 3, 4, 5/11)
          WP1 Chairman: Xiaojie Zhu (China Telecom),
          WP1 Vice-chairman: Vacant
WP2: Control and management protocols for IMT-2020
(Questions: 6, 7, 8/11)
          WP2 Chairman: Shin-Gak Kang (ETRI)
          WP2 Vice-chairman: Vacant
WP3: Conformance and interoperability testing, combating counterfeit ICT and mobile device theft
(Questions: 9, 10, 11, 12, 13, 14, 15/11)
          WP3 Chairman: Kaoru Kenyoshi (NEC Corporation) 
          WP3 Vice-chairman: Awad Ahmed Ali Hmed Mulah (NTC)
          WP3 Vice-chairman: João Alexandre MONCAIO ZANON (NTA)

CASC: Conformity Assessment Steering Committee
          Chairman: Isaac BOATENG (NCA)
          Vice-chairman: Khoa NGUYEN VAN (VNTA, MIC)
          Vice-chairman: Karim LOUKIL (CERT)

SG11RG-AFR: ITU-T SG11 Regional Group for Africa
          Chairman: Isaac BOATENG (NCA)
          Vice-chairman: Karim LOUKIL (CERT)
SG11RG-RCC​: ITU-T SG11 Regional Group for RCC
          Chairman: Alexey BORODIN (Rostelecom)

4         Questions
There were no changes to the Questions texts at this meeting.

5        Liaison officers and Rapporteurs
SG11 approved the appointment of the new Rapporteurs and Associate Rapporteurs as follows:

QUESTIONCONTACT

Q1/11 (WP1/11)
Signalling and protocol architectures in emerging telecommunication environments and guidelines for implementations

Huan DENG
Rapporteur
Email: denghuan.bri@chinatelecom.cn

Q2/11 (WP1/11)
Signalling requirements and protocols for services and applications in emerging telecommunication environments

Cheng LI
Rapporteur
Email: licheng@caict.ac.cn
​​Martin BRAND
Associate Rapporteur
Email: martin.brand@a1telekom.at

Q3/11 (WP1/11)
Signalling requirements and protocols for emergency telecommunications

Xiaojie ZHU
Acting rapporteur
Email: zhuxj@gsta.com

Q4/11 (WP1/11)
Protocols for control, management and orchestration of network resources

Ying CHENG
Rapporteur
Email: chengying10@chinaunicom.cn

Q5/11 (WP1/11)
Protocols and procedures supporting services provided by broadband network gateways

Junfeng MA
Rapporteur
Email: majunfeng@caict.ac.cn
Aipeng GUO
Associate rapporteur
Email: guoap7@chinaunicom.cn

Q6/11 (WP2/11)
Protocols supporting control and management technologies for IMT-2020

Haining WANG
Rapporteur
Email: wanghn.bri@chinatelecom.cn

Q7/11 (WP2/11)
Signalling requirements and protocols for network attachment including mobility and resource management for future networks and IMT-2020

Jongmin LEE
Rapporteur
Email: jminlee@sk.com

Q8/11 (WP2/11)
Protocols supporting distributed content networking and information centric network (ICN) for future networks and IMT-2020, including end-to-end multi-party communications

Shin-Gak KANG
Rapporteur
Email: sgkang@etri.re.kr

Q9/11 (WP3/11)
Service and networks benchmark testing, remote testing including Internet related performance measurements

Martin BRAND
Rapporteur
Email: martin.brand@a1telekom.at

Q10/11 (WP3/11)
Testing of emerging IMT-2020 technologies

Kaoru KENYOSHI
Acting rapporteur
Email: kaoru.kenyoshi@emea.nec.com

Q11/11 (WP3/11)
Protocols and networks test specifications; frameworks and methodologies

Martin BRAND
Rapporteur
Email: martin.brand@a1telekom.at
Kaoru KENYOSHI
Associate rapporteur
Email: kaoru.kenyoshi@emea.nec.com

Q12/11 (WP3/11)
Testing of Internet of things, its applications and identification systems

Steve LIANG
Rapporteur
Email: liangs@ucalgary.ca
Kazunori TANIKAWA
Associate rapporteur
Email: k-tanikawa@cq.jp.nec.com
Ruslan KIRICHEK
Associate rapporteur
Email: ruslan.stk@gmail.com

Q13/11 (WP3/11)
Monitoring parameters for protocols used in emerging networks, including cloud computing and software-defined networking/network function virtualization (SDN/NFV)

Minrui SHI
Rapporteur
Email: shimr@sttri.com.cn
Xu LU
Associate Rapporteur
E-mail: luxu@caict.ac.cn

Q14/11 (WP3/11)
Cloud interoperability testing

Nan CHEN
Rapporteur
Email: chenn@gsta.com

Q15/11 (WP3/11)
Combating counterfeit and stolen ICT equipment

João Alexandre MONCAIO ZANON
Rapporteur
Email: zanon@anatel.gov.br
Isaac BOATENG
Associate rapporteur
Email: isaac.boateng@nca.org.gh

CASC
Conformity Assessment Steering Committee

Isaac BOATENG
Chairman
Email: isaac.boateng@nca.org.gh
Khoa NGUYEN VAN
Vice-chairman
Email: nvkhoa@mic.gov.vn
Karim LOUKIL
Vice-chairman
Email: karim.wakil@cert.mincom.tn

​The final list of Rapporteurs and Associate Rapporteurs can be found in TD 13 Rev.1 (GEN/11).
SG11 approved the appointment of new liaison officers and representatives as follows:

ENTITYCONTACT

CITEL
Inter-American Telecommunication Commission

João Alexandre MONCAIO ZANON
Liaison officer
E-mail: zanon@anatel.gov.br

E-health related studies in SG11
E-health related studies in SG11

Cheng LI
Liaison officer
E-mail: licheng@caict.ac.cn

ETSI
ETSI STQ, INT

Martin BRAND
Liaison officer
E-mail: martin.brand@a1telekom.at

GSMA
GSM Association

Xiaojie Zhu
Liaison officer
E-mail: zhuxj@gsta.com

ISO/IEC JTC 1/SC 6
ISO/IEC JTC 1/SC 6

Shin-Gak KANG
Liaison officer
E-mail: sgkang@etri.re.kr

ITU-D SG2
ITU-D SG2

Isaac BOATENG
Liaison officer
E-mail: isaac.boateng@nca.org.gh

ITU-R SGs
ITU-R Study Groups

Xiaojie ZHU
Liaison officer
E-mail: zhuxj@gsta.com

ITU-T SG12
ITU-T Study Group 12 (QoS)

Kaoru KENYOSHI
Liaison officer
E-mail: kaoru.kenyoshi@emea.nec.com

ITU-T SG13
ITU-T Study Group 13 (NGN, FN, IMT-2020)

Shin-Gak KANG
Liaison officer
E-mail: sgkang@etri.re.kr

ITU-T SG15
ITU-T Study Group 15 (Access)

Junfeng MA
Liaison officer
E-mail: majunfeng@caict.ac.cn

ITU-T SG16
ITU-T Study Group 16 (Multimedia)

Shin-Gak KANG
Liaison officer
E-mail: sgkang@etri.re.kr

ITU-T SG17
ITU-T Study Group 17 (Security)

Kai HU
Liaison officer
E-mail: kevinkai.hu@huawei.com

ITU-T SG20
Internet of things (IoT) and smart cities and communities (SC&C)

Kaoru KENYOSHI
Liaison officer
E-mail: kaoru.kenyoshi@emea.nec.com
Ruslan KIRICHEK
Liaison officer
Email: ruslan.stk@gmail.com

JCA-AHF
Joint Coordination Activity on Accessibility and Human Factors

Kaoru KENYOSHI
Liaison officer
E-mail: kaoru.kenyoshi@emea.nec.com

JCA-IoT and SC&C
Joint coordination activity on Internet of Things and Smart Cities and Communities 

Kaoru KENYOSHI
Liaison officer
E-mail: kaoru.kenyoshi@emea.nec.com

JCA-SDN
Joint Coordination Activity on Software-Defined Networking

Jia HE
Liaison officer
E-mail: hejia@huawei.com

SCV
Standardization Committee for Vocabulary

João Alexandre MONCAIO ZANON
Vocabulary Rapporteur
Email: zanon@anatel.gov.br

PR
Public Relations

Kaoru KENYOSHI
Liaison officer
E-mail: kaoru.kenyoshi@emea.nec.com

RCC
Regional Commonwealth in the field of Communications

Aleksey BORODIN
Liaison officer
E-mail: alexey.borodin@rt.ru / borodin.msk@mail.ru

SG11 Mentor
SG11 Mentor

Kaoru KENYOSHI
E-mail: kaoru.kenyoshi@emea.nec.com
OGC
Open Geospatial Consortium
Steve LIANG
Liaison Officer
E-mail: steve.liang@ucalgary.ca

The final list of Liaison Officers and representatives can be found in TD 12 Rev.4 (GEN/11).

6        Action plan of ITU-T SG11 for the new Study Period (2017-2020)
During the first meeting of SG11, the Chairman requested SG11 Management team to give a short overview that highlights their plans for the current Study Period. These documents became a basis for the SG11 action plan which lists the key SG11 priorities for the next four years. The action plan is available in TD 173 (GEN/11).

7        SDN 5G/IMT-2020
SG11 made progress on ongoing work items which are related to SDN as follows:
Most of them will be proposed for consent at the next meetings (WP2/11 meeting, July 2017) and the next SG11 meeting (8-17 November 2017).
More information on these activities is available in the WP2/11 report, TD 117 (GEN/11).

8        SS7 security
SG11 started working on SS7 security through creating an amendment to ITU-T Q.731.3. The output document which contains the draft amendment is available in TD 137 (GEN/11).
The Chairman of SG11 also invited Mr Raymond Tu to give a presentation of a mechanism for authentication for caller id which was highlighted in his paper submitted to ITU Kaleidoscope 2016. For more details please see TD 79 (GEN/11) and TD 60 (GEN/11).

9        Third meeting of the ITU-T Conformity Assessment Steering Committee (CASC)
The third meeting of the CASC was addressed in two sessions on Monday 13 February 2017 from 9:30am and was chaired by Mr Isaac Boateng.
The CASC agreed the Guidelines “ITU-T CASC procedure to appoint ITU-T technical experts” which was further approved at the closing meeting of ITU-T SG11. The output document can be found in TD 144 (GEN/11).
The CASC was informed by IECEE about the received responses on IECEE inquiry on ITU Recommendations to be used for certification. Among IECEE members which provided feedback are: Italy, Slovenia, Switzerland and Viet Nam. The CASC noted that there is market need for conformance testing against ITU-T Recommendations. The meeting then decided to inform all SGs on the responses of IEC enquiry on testing against ITU-T Recs. The outgoing LS is available in TD 163 (GEN/11).
The CASC continues collaborating with IECEE through established Task Force (TF) “Certification Management Committee (CMC) Task Force ITU Requirements”. The Chairman of CASC presented the list of CASC representatives who were nominated to this TF. The CASC will be informed on the outcome of the TF meetings at the next CASC meetings. There are the following meetings of CASC in 2017:
The meeting report can be found in TD164 (GEN/11). More details are available on the ITU-T CASC web page.

10         VoLTE/ViLTE interconnection
SG11 made progress on ongoing work items Q.30xx_VoLTE_Interconnection_FW “Framework of interconnection of VoLTE/ViLTE-based networks” and revised Recommendation ITU-T Q.1912.5 “Interworking between Session Initiation Protocol (SIP) and Bearer Independent Call Control protocol or ISDN User Part”. Both documents are planned for consent during next the SG11 meeting (8-17 November 2017).
In addition, SG11 decided to start two new work items which deal with VoLTE issues. Among them are:​

The discussion of these work items will continue at the rapporteur group meetings, including joint meetings with ETSI TC INT, which are scheduled to take place in March and June 2017. The full list of interim meetings is available on the SG11 web page.

11         Implementation of ITU C&I Programme
According to received inputs from different ITU-T SGs, ITU-T SG11 updated the reference table of ITU-T Recommendations suitable for C&I testing and the list of pilot projects on conformance testing against ITU-T Recommendations. The information was updated on the ITU C&I Portal accordingly:
12         Internet related performance measurements
SG11 continue working on the ongoing draft Recommendation ITU-T Q.3961. It was agreed to align the title of draft ITU-T Q.3961 with the current mandate of SG11. The agreed title of the draft ITU-T Q.3961 is “Testing methodologies of Internet related performance measurements including e2e bit rate within the fixed and mobile operator’s networks”.
The text was improved and the group decided to continue improving this document at the relevant Rapporteur groups as indicated on the SG11 web page. The meeting report can be found in TD 109 (GEN/11).

13         Collaboration with ETSI TC INT
SG11 continue collaborating with ETSI T​C INT through joint activities related to the following areas:

The next joint meeting of Q2, 9 and 11/11 and ETSI TC INT is scheduled to take place in Vienna (hosted by Austria Telekom) from 28-30 March 2017. All details are available on the SG11 web page.

14        Combating counterfeit ICT and mobile device theft
SG11 approved the survey report on counterfeit ICT devices in Africa region, TD 1199 Rev.1 (GEN/11). This report will be posted as a Technical Report.
SG11 started a new work item ITU-T Q.FW_CSM" Framework for combating the use of Stolen Mobile ICT Devices".
Two draft technical reports have been revised, as follows:
SG11 also decided to create the plans for Implementation of WTSA-16 Resolution 96 and Resolution 97 according to the received contributions. More details are available in the WP3/11 report, TD 118 Rev.1 (GEN/11).

15         Testing of Internet of things, its applications and identification systems
SG11 started a new work item Q.Het_IoT_Gateway_Test which will describe the testing methodology of the heterogeneous network gateway which is to be used for communication among IoT devices.
Also, SG11 made progress on ongoing work items which are related to IoT testing, as follows:
16         Outgoing Liaison Statements
The following table shows the list of the fifteen agreed outgoing liaison statements. See TD 10 (GEN/11)
#Q (s)For:To:TitleReference
12/11InfoSG2LS/o on work item Q.30xx_VoLTE_Interconnection_FW [to ITU-T SG2]TD 139
24/11InfoSG13, JCA-SDN, ONUGLS/o on recent SDN-related developments in SG11: one new work item [to ITU-T SG13, JCA-SDN, ONUG]TD 134
35/11InfoSG13, JCA-SDNLS/o on recent SDN-related progress in Q5: one consented Recommendation plus one new work item [to SG13, JCA-SDN]TD 143
49/11InfoIETF BMWGLS/o/r on SG11's views on IETF BMWG - LS 1 -E and IETF BMWG - LS 2 -E (LS/i on proposal to develop a Benchmarking Methodology for ITU-T Recommendation Y.1731 OAM Performance) (reply to IETF BMWG LS1&2) [to IETF BMWG]TD 120 Rev.1
59/11InfoITU-D SG1, All ITU-T Study Groups, TDAG, TSAGLS/o/r on Operational Plan for Implementation of WTSA-16 Resolution 95 (Hammamet, 2016)TD 119 Rev.1
611/11InfoAll ITU-T SGsLS/o on Implementation of ITU C&I Programme [to all ITU-T SGs]    TD 125
714/11ActionISO/IEC JTC1 SC38 WG4LS/o on cloud computing interoperability [to ITU-T ISO/IEC JTC1 SC38 WG4]TD 93
814/11InfoSG2LS/o/r to SG2 on Telecommunication Management and OAM Project Plan (reply to SG2-LS 155 -E) [to ITU-T SG2]TD 92
914/11InfoSG13LS/o/r to SG13 on information update in draft Supplement on Cloud Computing Standardization Roadmap (reply to SG13-LS 157 -E) [to ITU-T SG13]TD 91
1015/11ActionAPT, ATU, CITEL, EUR, RCC ; SG2, SG5, SG3, SG17, SG20LS/o on ITU-T SG11 work on the combat of counterfeit ICT devices and mobile device theftTD 167 Rev.1
InfoOCDE, WIPO, WTO, 3GPP, MWF, GSMA
11All/11ActionTSAGLS/o on implementation of Resolution 44 of WTSA-16 — bridging the standardization gap between developing and developed countries [to TSAG]TD 168
12All/11InfoSCVLS/o/r on ongoing collaboration (reply to SCV LS11) [to SCV]TD 169
13All/11InfoITU-D SG2LS/o/r on ongoing collaboration [to ITU-D SG2]TD 170
14CASCActionAll ITU-T Study GroupsLS/o on appointment of SGs Focal Points to CASC and outcomes of CASC meeting (13 February 2017)TD 163
15CASCInfoSG12LS/o/r on feedback from SG12 to SG11/CASC and TSAG regarding tests of the compatibility between mobile phones and vehicle hands-free terminals (reply to SG12 LS8) [to ITU-T SG12]   TD 162

17         Approved new work items
The following table shows the list of the nine new work items. See TD 171 (GEN/11)
N.QWork item (Draft Recs)StatusTitleEditorTimingRef.
11/11Q.VCNSANewSignalling architecture supporting virtualization of control network entitiesJinlan Ma, China Telecom P.R.China
majl.gd@chinatelecom.cn
Xiaojie ZHU (Judy), China Telecom  P.R.China zhuxj.gd@chinatelecom.cn
2019-02TD 160 Rev.1
22/11Q.731.3-Amendment1NewAmendment  for ITU-T Q.731.3 STAGE 3 DESCRIPTION FOR NUMBER IDENTIFICATION SUPPLEMENTARY SERVICES USING SIGNALLING SYSTEM No.7Shi Minrui China TelecomChina
shimr@sttri.com.cn
Wu Tong  China Telecom China
E-mail: wutong@chinatelecom.cn
2018-02TD 137
33/11

Q.suppl.VoLTE_ETS
_Interconnection

NewSignalling requirements for interconnection between VoLTE-based network and other networks supporting emergency telecommunications service (ETS)

Jinlan Ma,China Telecom,China
majl.gd@chinatelecom.cn

Xiaojie Zhu,China Telecom, China
zhuxj.gd@chinatelecom.cn

2019-02TD 151
43/11

Q.suppl.NGN_pri_
Interconnection

NewSignalling requirements for interconnection between NGN and GSM/UMTS networks supporting priority calls

Sunil Purohit
Telecommunication Engineering Center, DoT,India ddgs.tec@gov.in
Harsh
SharmaTelecommunication Engineering Center, DoT, India adetngs.tec@gov.in
Mukesh
Dhingra
Tata Teleservices limited (TTSL), India
mukesh.dhingra@tatatel.co.in

2019-02TD 150
54/11Q.SD-WANNewSignalling Requirement for SD-WAN Service

Cancan Huang, China Telecom, huangcc@gsta.com
Huanan Chen, China Telecom, chenhuanan@gsta.com

2019-3TD 133
65/11Q.BNG-CFSNewSignalling requirements for separation of control and forwarding plane in vBNGAipeng Guo
guoap7@chinaunicom.cn
Junfeng MA
majunfeng@caict.ac.cn
Bo Lei leibo@ctbri.com.cn
2019-7TD 124
711/11Q.VoLTE_INT_TESTNewVoLTE/ViLTE interconnection testing for interworking and roaming scenarios including relevant QoS/QoE testing

Martin Brand (AT1)
martin.brand@a1telekom.at
Gerhard Ott (DT)
Gerhard.ott@telecom.de

2018TD 122
812/11Q.Het_IoT_Gateway_TestNewThe structure of the testing of heterogeneous Internet of Things gateways in a laboratory environmentAlexey Borodin
alexey.borodin@rt.ru
Ruslan Kirichek
kirichek@sut.ru
2018TD 157
915/11Q.FW_CSMNewFramework for Combating the use of Stolen Mobile ICT DevicesJoão Alexandre MONCAIO ZANON
zanon@anatel.gov.br
2018-4QTD 165

 18         Work plan for interim Working Party and Rapporteur meetings
The following represents the interim meetings plan as agreed at SG11 Plenary (Geneva, 15 February 2017). Also in TD 11 Rev.2 (GEN/11)
18.1      Working parties
Two interim Working Parties meetings will be held before the next SG11 meeting.

WPDatePlace / HostTerms of referenceContact
WP1/1112 July 2017Geneva/TSBTo finalize and consent Q.SCO

TSB/ITU Secretariat:
tsbsg11@itu.int

WP2/1113 July 2017Geneva/TSB

Consent ITU-T X.mp2p-mssr
Approve all WP2/11 output documents
Collaboration on WP2/11 related issues with other groups

TSB/ITU Secretariat:
tsbsg11@itu.int

 18.2      Rapporteur groups
The following interim Rapporteurs’ groups meetings are agreed by SG11 Plenary (Geneva, 15 February 2017).

QuestionDatePlace / HostTerms of referenceContact
Joint Q2/11-ETSI TC INT28-30 March 2017

Vienna
(Austria Telekom)
Confirmed

Draft Rec. Q.30xx_VoLTE_Interconnection_FW

"Framework of interconnection of VoLTE/ViLTE-based networks"

Host:
Martin BRAND, martin.brand@a1telekom.at
TSB/ITU Secretariat:
tsbsg11@itu.int
ETSI Secretariat:
Helene Schmidt
helene.schmidt@etsi.org
ETSI announcement

Joint Q9/11-ETSI TC INT28-30 March 2017

Vienna
(Austria Telekom)
Confirmed

Draft Q.3961

"Testing methodologies of Internet related performance measurements including e2e bit rate within the fixed and mobile operator’s networks"

Host:
Martin BRAND, martin.brand@a1telekom.at
TSB/ITU Secretariat:

tsbsg11@itu.int
ETSI Secretariat:

Helene Schmidt
helene.schmidt@etsi.org
ETSI announcement

Joint Q11/11-ETSI TC INT28-30 March 2017

Vienna
(Austria Telekom)
Confirmed

Draft Q.VoLTE_INT_TEST

"VoLTE/ViLTE interconnection testing for interworking and roaming scenarios including relevant QoS/QoE testing"

Martin BRAND, martin.brand@a1telekom.at
TSB/ITU Secretariat:

tsbsg11@itu.int
ETSI Secretariat:

Helene Schmidt
helene.schmidt@etsi.org
ETSI announcement

Q4/1115-17 May 2017 13:00-15:00 (Geneva time)e-meetingProgress Q.SCO to be ready for consent
Progress Q.PVMapping

Ying CHENG
chengying10@chinaunicom.cn

Q8/1122-26 May 2017e-meetingProgress all Q8/11 on-going work itemsShin-Gak KANG (sgkang@etri.re.kr)
Joint Q2/11-ETSI TC INT27-29 June 2017

Sophia Antipolis
(ETSI HQ)
Planned

Draft Rec. Q.30xx_VoLTE_Interconnection_FW

"Framework of interconnection of VoLTE/ViLTE-based networks"

Martin BRAND, martin.brand@a1telekom.at
TSB/ITU Secretariat:

tsbsg11@itu.int

Joint Q9/11-ETSI TC INT27-29 June 2017

Sophia Antipolis
(ETSI HQ)

 

Planned

Draft Q.3961

"Testing methodologies of Internet related performance measurements including e2e bit rate within the fixed and mobile operator’s networks​"

Martin BRAND, martin.brand@a1telekom.at
TSB/ITU Secretariat:

tsbsg11@itu.int

Joint Q11/11-ETSI TC INT27-29 June 2017

Sophia Antipolis
(ETSI HQ)

Planned

Draft Q.VoLTE_INT_TEST

"VoLTE/ViLTE interconnection testing for interworking and roaming scenarios including relevant QoS/QoE testing"

Martin BRAND, martin.brand@a1telekom.at
TSB/ITU Secretariat:

tsbsg11@itu.int

Q1/113-14 July 2017Geneva

Progress Q.VCASA
Consider any new work item

Huan DENG
denghuan.bri@chinatelecom.cn

Q3/113-14 July 2017GenevaProgress Q.suppl.VoLTE_ETS_Interconnection and Q.suppl.NGN_pri_InterconnectionXiaojie ZHU
zhuxj@gsta.com
Q4/113-14 July 2017Geneva

Consent Q.SCO
Progress Q.PVMaaping to be ready for consent
Progress Q.SMO and Q.SVDC
Discuss new work item introduced by contributions
Review the work program and modify the Action Plan

Ying CHENG
chengying10@chinaunicom.cn

Q5/113-14 July 2017e-meetingProgress on recommendation of Q.BNG-DBoD

MA Junfeng
majunfeng@caict.ac.cn
GUO Aipeng
guoap7@chinaunicom.cn

Q6/113-14 July 2017Geneva

Discuss new work item proposals LSs with other related organizations

Haining WANG
wanghn.bri@chinatelecom.cn

Q7/113-14 July 2017Geneva

Progress all current work items of Q7/11
Discuss new work proposals

Jongmin LEE
jminlee@sk.com
Q8/113-14 July 2017Geneva

Propose Consent of ITU-T X.mp2p-mssr
Progress all Q8/11 on-going works
Discuss new work proposals

Shin-Gak KANG (sgkang@etri.re.kr)
Q13/113-14 July 2017ITU/Geneva with remote facilitationHandle the input contributions
Consider new Wis
Minrui SHI
shimr@sttri.com.cn
Q14/113-14 July 2017ITU/Geneva with remote facilitationHandle the input contributions
Consider new Wis
Progress on the open work items for Q14/11
CHEN Nan
chenn@gsta.com
CASC12 July 2017e-meetingTo consider contribution of ITU members for progressing work items of CASC and possible revision of CASC ToR to adapt to WTSA-16 Resolution 2 and Resolution 76;
To discuss progress on collaboration with existing certification programmes on the ITU-T Recommendations which are proposed to be subjects of joint certification schemes;
To update list of focal points to CASC.
To discuss documents which need to be prepared for such collaboration;
To progress the other work items of the CASC.

Isaac BOATENG
isaac.boateng@nca.org.gh

tsbcasc@itu.int

Q8/1128 August-1 September 2017e-meetingProgress all Q8/11 on-going work itemsShin-Gak KANG (sgkang@etri.re.kr)
Q7/114-7 September 2017
8 September 2017
e-meeting
CC
Progress all current work items of Q7/11 and discuss new work proposalsJongmin LEE
jminlee@sk.com

 19         Regional Groups’ meetings
SG11 was informed about Regional Groups’ meetings which are scheduled for 2017, as follows:

Note: the Regional Group will take place back-to-back with the SG11 Regional Workshop for Africa on "Counterfeit ICT Devices, Conformance and Interoperability Testing Challenges in Africa" (5 April 2017), the SG13 Regional Workshop (2-3 April 2017) and the Regional Group of SG13 (SG13RG-AFR, 4-5 April 2017)
20         Next Study Group 11 meeting
The next SG11 meeting is scheduled in Geneva, 8-17 November 2017.
The following meeting of SG11 is scheduled in Geneva, 30 April-11 May 2018 (planned).​