Committed to connecting the world

WTISD

Executive Summary

​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​Executive Summary of the WP1/11 meeting (virtual, 19 November 2020)​

Working Party 1/11 “Signalling requirements and protocols for emerging telecommunications networks” meeting was held fully virtual on 19 November 2020 and was attended by 14 delegates from 8 countries. The meeting was preceded by SG11 Rapporteur Group meetings of Question 3/11.

Following decision of the SG11 closing plenary meeting which took place on 31 July 2020, two interim Rapporteur Group meetings were arranged for Q3/11 and Q4/11 before this Working Party plenary meeting. Due to lack of contributions, the Q4/11 interim Rapporteur Group meeting planned on 11-13 November was cancelled. Q3/11 interim Rapporteur Group meeting was held on 4-5 November 2020. There were no interim Rapporteur Group meetings planned for Q1/11, Q2/11 and Q5/11 prior to this particular Working Party 1 meeting.

The meeting was supported by ITU MyMeetings remote participation tool.

1     Consented Recommendations (ITU-T A.8)
None.
Note: ​as Q4/11 interim Rapporteur Group meeting (11-13 November 2020) was cancelled, the consent of draft Recommendations Q.SCC and Q.VNFT-req, which were planned to be completed at this particular meeting, was postponed to the next SG11 meeting which is preliminary scheduled to take place in April 2021 (TBC).

2     Supplements, Handbooks, Technical Papers, Guidelines and Corrigenda
None.

3     
Reports of Rapporteur Group meetings
WP1/11 approved the report of Q3/11 e-meeting which is contained in SG11-TD59/WP1.

4     Report of WP1/11
The report of WP1/11 is available in SG11-R39​.

5     Highlights of WP1/11​
At this particular meeting, WP1/11 achieved the following outcomes:​
  • Considered iLS on progress of ITU-T Y.CPN-arch: "Framework and architecture of Computing Power Network" (SG11-LS130, SG11-LS131) [from ITU-T SG13] and prepared the reply (SG11-TD62/WP1​).
  • Approved three oLSs:
    • LS/o on initiation of new work item Q.Sig_Req_ETS_IMS_roaming "Signalling requirements for emergency telecommunication service in IMS roaming environment" [to ITU-T SG2, 3GPP SA6] (SG11-TD60/WP1);
    • LS/o/r on Disaster Relief Use Cases (reply to ITU-R WP5A-Document 5A/TEMP/1-E; ITU-R WP5D-5D/TEMP/179(Rev.3)) [to ITU-D SG2 Q5/2, ITU-R WP5A, ITU R WP5D] (SG11-TD61/WP1);
    • LS/o/r on feedback to SG13 on computing power network related work items (SG13-LS185) [to ITU-T SG13] (SG11-TD62/WP1).
  • Approved one new work item:
    • Q.Sig_Req_ETS_IMS_roaming “Signalling requirements for emergency telecommunication service in IMS roaming environment advanced network”;
  • Approved the meeting report of Q3/11;
  • Considered and approved draft report of WP1/11 meeting (19 November 2020) (SG11-TD63/WP1​).​
Note: as Q4/11 interim Rapporteur Group meeting (11-13 November 2020) was cancelled, the consent of draft Recommendations Q.SCC and Q.VNFT-req was postponed to the next SG11 meeting which is preliminary scheduled to take place in April 2021 (TBC).

The Work programme was updated accordingly.​
 
6        Outgoing Liaison Statements​
The following table shows the list of outgoing liaison statements.
 
# Q For: To: Title Reference
1
3/11
A
ITU-T SG2,
3GPP SA6
LS on initiation of new work item Q.Sig_Req_ETS_IMS_roaming "Signalling requirements for emergency telecommunication service in IMS roaming environment"​​​​
SG11-LS165
2
3/11
I
ITU-D SG2 Q5/2,
ITU-R WP5A,
ITU R WP5D
LS/r on Disaster Relief Use Cases (reply to ITU-R WP5A-Document 5A/TEMP/1-E; ITU-R WP5D-5D/TEMP/179(Rev.3))
SG11-LS166
​​3
4/11
I
ITU-T SG13
LS/r on feedback to SG13 on computing power network related work items (SG13-LS185)
SG11-LS167
​​​

7     Approved new work items
The following table shows the new approved work items.

​Accronym
​Title
​Editors
​Timing
​Reference
​Q
​​A.1
(Q report)
​Q.Sig_Req_ETS_IMS_roaming
​Signalling requirements for emergency telecommunication service in IMS roaming environment advanced network
​Xiaojie Zhu, China Telecom, P.R. China
Jianyin Zhang, China Mobile, P.R.China
Zhan Liu, China Telecom, P.R.China
​2021-06
SG11-TD58/WP1
3/11​
SG11-TD59/WP1​


8     Future ​meetings and next Study Group 11 meeting
8.1  Interim WP meetings
None.

8.2  Interim Rapporteur groups meetings
None.

8.3  WP/Question meeting during next SG11 meeting
WP1/11 and its Questions meetings are planned to take place on 7-16 April 2021 (TBC).
The objectives for the meeting are highlighted below:​

Question/W​P
​Objectives
​​Contact
​WP1/11
  • Consent draft Recommendations Q.SCC and Q.VNFT-req
  • ​Approve meeting report of Qs
  • Approve outgoing liaisons
  • Approve new WIs
tsbsg11@itu.int​
Q1/11​
  • To progress ongoing signalling architecture work item Q.LiteIMS-SA
  • To consider any new work item related to signalling architecture aspects
  • But not limited to​​​
tsbsg11@itu.int​
​Q2/11
  • To progress ongoing work items
  • To consider any possible new work item
  • Review the related iLSs and prepare the oLS if needed
  • But not limited to​​
tsbsg11@itu.int​
​Q3/11
  • Discuss the new work item proposal introduced by contribution
  • Review the related iLSs and prepare the oLS if needed
  • Progress on ongoing WIs
  • But not limited to​​​
tsbsg11@itu.int​
​Q4/11
  • Finalize draft Recommendations Q.SCC and Q.VNFT-req
  • Progress the on-going work items under study in Q4/11
  • Discuss new work item introduced by contributions
  • Review the work program and modify the Action Plan
  • But not limited to​​
tsbsg11@itu.int​
​Q5/11
  • Progress on-going work programme
  • Create new work items according to received contributions and meeting discussions, if any
  • Other business​​
tsbsg11@itu.int​​​


9     List of Rapporteurs, Associate Rapporteurs and Liaison Officers
There were no changes since last SG11 meeting (July 2020).​