Executive Summary of the WP1/11 meeting (virtual, 19 November 2020)
Working Party 1/11 “Signalling requirements and protocols for emerging telecommunications networks” meeting was held fully virtual on 19 November 2020 and was attended by 14 delegates from 8 countries. The meeting was preceded by SG11 Rapporteur Group meetings of Question 3/11.
Following decision of the SG11 closing plenary meeting which took place on 31 July 2020, two interim Rapporteur Group meetings were arranged for Q3/11 and Q4/11 before this Working Party plenary meeting. Due to lack of contributions, the Q4/11 interim Rapporteur Group meeting planned on 11-13 November was cancelled. Q3/11 interim Rapporteur Group meeting was held on 4-5 November 2020. There were no interim Rapporteur Group meetings planned for Q1/11, Q2/11 and Q5/11 prior to this particular Working Party 1 meeting.
The meeting was supported by
ITU MyMeetings remote participation tool.
1 Consented Recommendations (ITU-T A.8)
None.
Note: as Q4/11 interim Rapporteur Group meeting (11-13 November 2020) was cancelled, the consent of draft Recommendations Q.SCC and Q.VNFT-req, which were planned to be completed at this particular meeting, was postponed to the next SG11 meeting which is preliminary scheduled to take place in April 2021 (TBC).
2 Supplements, Handbooks, Technical Papers, Guidelines and Corrigenda
None.
3 Reports of Rapporteur Group meetings
WP1/11 approved the report of Q3/11 e-meeting which is contained in
SG11-TD59/WP1.
4 Report of WP1/11
The report of WP1/11 is available in
SG11-R39.
5 Highlights of WP1/11
At this particular meeting, WP1/11 achieved the following outcomes:
- Considered iLS on progress of ITU-T Y.CPN-arch: "Framework and architecture of Computing Power Network" (SG11-LS130, SG11-LS131) [from ITU-T SG13] and prepared the reply (SG11-TD62/WP1).
- Approved three oLSs:
- LS/o on initiation of new work item Q.Sig_Req_ETS_IMS_roaming "Signalling requirements for emergency telecommunication service in IMS roaming environment" [to ITU-T SG2, 3GPP SA6] (SG11-TD60/WP1);
- LS/o/r on Disaster Relief Use Cases (reply to ITU-R WP5A-Document 5A/TEMP/1-E; ITU-R WP5D-5D/TEMP/179(Rev.3)) [to ITU-D SG2 Q5/2, ITU-R WP5A, ITU R WP5D] (SG11-TD61/WP1);
- LS/o/r on feedback to SG13 on computing power network related work items (SG13-LS185) [to ITU-T SG13] (SG11-TD62/WP1).
- Approved one new work item:
-
Q.Sig_Req_ETS_IMS_roaming “Signalling requirements for emergency telecommunication service in IMS roaming environment advanced network”;
- Approved the meeting report of Q3/11;
- Considered and approved draft report of WP1/11 meeting (19 November 2020) (SG11-TD63/WP1).
Note: as Q4/11 interim Rapporteur Group meeting (11-13 November 2020) was cancelled, the consent of draft Recommendations Q.SCC and Q.VNFT-req was postponed to the next SG11 meeting which is preliminary scheduled to take place in April 2021 (TBC).
The Work programme was updated accordingly.
6 Outgoing Liaison StatementsThe following table shows the list of outgoing liaison statements.
# |
Q |
For: |
To: |
Title |
Reference |
1
| 3/11
| A
| ITU-T SG2, 3GPP SA6
| LS on initiation of new work item Q.Sig_Req_ETS_IMS_roaming "Signalling requirements for emergency telecommunication service in IMS roaming environment"
|
SG11-LS165
|
2
| 3/11
| I
| ITU-D SG2 Q5/2, ITU-R WP5A, ITU R WP5D
| LS/r on Disaster Relief Use Cases (reply to ITU-R WP5A-Document 5A/TEMP/1-E; ITU-R WP5D-5D/TEMP/179(Rev.3))
|
SG11-LS166
|
3
| 4/11
| I
| ITU-T SG13
| LS/r on feedback to SG13 on computing power network related work items (SG13-LS185)
|
SG11-LS167
|
7 Approved new work items
The following table shows the new approved work items.
Accronym
| Title
| Editors
| Timing
| Reference
| Q
| A.1 (Q report)
|
Q.Sig_Req_ETS_IMS_roaming
| Signalling requirements for emergency telecommunication service in IMS roaming environment advanced network
| Xiaojie Zhu, China Telecom, P.R. China Jianyin Zhang, China Mobile, P.R.China Zhan Liu, China Telecom, P.R.China | 2021-06
| SG11-TD58/WP1
| 3/11
| SG11-TD59/WP1 |
8 Future meetings and next Study Group 11 meeting
8.1 Interim WP meetings
None.
8.2 Interim Rapporteur groups meetings
None.
8.3 WP/Question meeting during next SG11 meeting
WP1/11 and its Questions meetings are planned to take place on 7-16 April 2021 (TBC).
The objectives for the meeting are highlighted below:
Question/WP
| Objectives
| Contact
|
WP1/11
| | tsbsg11@itu.int |
Q1/11
| - To progress ongoing signalling architecture work item Q.LiteIMS-SA
- To consider any new work item related to signalling architecture aspects
- But not limited to
| tsbsg11@itu.int
|
Q2/11
| - To progress ongoing work items
- To consider any possible new work item
- Review the related iLSs and prepare the oLS if needed
- But not limited to
| tsbsg11@itu.int |
Q3/11
| - Discuss the new work item proposal introduced by contribution
- Review the related iLSs and prepare the oLS if needed
- Progress on ongoing WIs
- But not limited to
| tsbsg11@itu.int
|
Q4/11
| - Finalize draft Recommendations Q.SCC and Q.VNFT-req
- Progress the on-going work items under study in Q4/11
- Discuss new work item introduced by contributions
- Review the work program and modify the Action Plan
- But not limited to
| tsbsg11@itu.int
|
Q5/11
| - Progress on-going work programme
- Create new work items according to received contributions and meeting discussions, if any
- Other business
| tsbsg11@itu.int |
9 List of Rapporteurs, Associate Rapporteurs and Liaison OfficersThere were no changes since last SG11 meeting (July 2020).