Committed to connecting the world

WTISD

Executive Summary

​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​Executive Summary of the WP1/11, WP2/11 and WP3/11 meetings
(virtual, 15-16 July 2021)

Working Party 1/11 (Signalling requirements and protocols for emerging telecommunications networks), Working Party 2/11 (Control and management protocols for IMT-2020) and Working Party 3/11 (Conformance and interoperability testing) meetings were held fully virtually on 15-16 July 2021. The meetings were attended by 47 delegates from 14 countries.

The meetings were preceded by SG11 interim Rapporteur Group e-meetings of Questions 1, 2, 3, 4, 5, 6, 7, 8, 12, 14 and 16/11.
Note: Q13/11 RGM e-meetings were cancelled due to lack of input documents.

1     Consented Recommendations (ITU-T A.8)

WP1/11: n
one at this meeting.
Note: ITU-T draft Recommendations Q.SFPtr and Q.BNG-P4switch were planned to be consented at the WP1/11 plenary meeting (16 July 2021). However, as the baseline texts were not mature enough and required more improvement, the consenting plan has been postponed to SG11 meeting planned to take place in December 2021.

WP2/11 consented the following Recommendations:

# Q WP Draft new/revised Rec. No. Title Final TD A.5 justification
1. 
6/11
2/11
ITU-T Q.5023
(ex Q.INS-PM)​

Protocol for managing Intelligent Network Slicing with AI-assisted analysis in IMT-2020 network
SG11-TD76-R1/WP2

-
2.

8/11
2/11
ITU-T Q.4101
(ex Q.HP2P-recov)​

Hybrid peer-to-peer (P2P) communications: Tree and data recovery procedures
SG11-TD94/WP2​
-


WP3/11 consented the following Recommendations:

# Q WP Draft new/revised Rec. No. Title Final TD A.5 justification
1.
14/11
3/11
ITU-T Q.4044
(ex Q.vs-iop-ts)
Test suite for interoperability testing of virtual switch
SG11-TD68/WP3
-
2.
16/11
3/11
ITU-T Q.4068
(ex. Q.API4TB)
Open APIs for interoperable testbed federations
SG11-TD92-R1/WP3
-


2     Supplements, Handbooks, Technical Papers, Guidelines and Corrigenda

2​.1
Supplements
No Supplements were approved at this meeting​.

2.2  Guidelines
No Guidelines were agreed at this meeting.

2.3  Handbooks
No Handbooks were approved at this meeting.

2.4
  Technical Papers / Technical Reports
No Technical Papers/Technical Reports were approved at this meeting.


2.5
  Corrigenda
No Corrigenda were approved at this meeting.​

3     
Reports of Rapporteurs meetings (Geneva, 7-16 July 2021)​
WP1/11, WP2/11 and WP3/11 approved the following reports of the Rapporteur Group meetings:​
4     Reports of WP1/11, WP2/11 and WP3/11
The reports of the WP1, WP2/11 and WP3/11 will be made available on R-series, as follows:​5     Highlights of WP1/11, WP2/11 and WP3/11 meetings

WP1/11

ITU-T draft Recommendations Q.SFPtr and Q.BNG-P4switch were planned to be consented at the WP1/11 plenary meeting (16 July 2021). However, as the baseline texts were not mature enough and required more improvement, the consenting plan has been postponed to SG11 meeting planned to take place in December 2021.

WP1/11 agreed to start five new work items, as follows:​​Also, WP1/11 achieved progress on the following ongoing work items:​
The Work programme of the WP1/11 will be updated accordingly. WP1/11 sent out eight liaison statements. The list of iLSs and oLSs is available in SG11-TD69/WP1.
The reports of interim Rapporteur meetings of Q1, 2, 3, 4, 5/11 were approved by WP1/11 accordingly.

WP2/11
WP2/11 consented two draft Recommendations, as follows:​​WP2/11 agreed to start two new work items, as follows:​
Also, WP2/11 achieved progress on the following ongoing work items:​The Work programme of the WP2/11 will be updated accordingly. WP2/11 sent one liaison statement. The list of iLSs and oLS is available in SG11-TD74/WP2​.
The reports of interim Rapporteur meetings of Q6, 7, 8/11 were approved by WP2/11 accordingly.​

WP3/11
WP3/11 consented two draft Recommendations, as follows:​WP3/11 agreed to start a new work item Q.N-att-framework “Framework of NFV automated testing” (SG11-TD88/WP3​).
Also, WP3/11 achieved progress on the following ongoing work items:​
The Work programme of the WP3/11 will be updated accordingly. WP3/11 sent four liaison statements. The list of iLSs and oLS is available in SG11-TD66-R1/WP3​.

The reports of interim Rapporteur meetings of Q12, 14, 16/11 were approved by WP3/11 accordingly.

Note: Q13/11 RGM e-meetings were cancelled due to lack of input documents.

6     Outgoing Liaison Statements​
The following table shows the list of outgoing liaison statements.
 
# QWP

For: To: Title Reference
1
1/11
​1/11
I
ITU-T Study Group 13
LS on the new work item Q.NICE-SA “Signalling architecture of NICE (Network intelligence capability enhancement) in support of awareness capabilities”
SG11-LS199​
2
1/11
​1/11
I
IETF RTCWEB WG,
3GPP SA4, 3GPP SA2
LS on the new work item Q.DC-SA “Signalling architecture of data channel enhanced IMS network”
SG11-LS200
​​3
2/11
​1/11
I
ETSI TC Cyber WG QSC
LS/r on progress of ITU-T TR-USSD (CYBERQSC(21)021007r2)
SG11-LS201
​4
2/11
​1/11
I
ITU-T Study Group 17
LS/r on draft Recommendation ITU-T Q.Pro-Trust "Signalling procedures and protocols for enabling interconnection between trustable network entities in support of existing and emerging networks" (SG17-LS303)
SG11-LS202
​5
​2/11
1/11​I
ITU-T SG13 (Q16/13),
ITU-T SG17 (Q15/17),
ITU-T FG-QIT4N,
ETSI ISG-QKD,
WG QSC,
ISO/IEC JTC1-SC27
LS on initiation of new work item Q.QKDN_profr “Quantum key distribution networks – Protocol framework”
SG11-LS203
​6
2/11​​1/11
I
IETF NWCRG
LS on initiation of new Technical Report TR-NCDP “Session layer network coding protocol for multicast data transmission”
SG11-LS204​
​7
3/11
1/11​I
FG-AI4NDM
LS/r on invitation to provide inputs to the roadmap of AI activities for natural disaster management (FG-AI4NDM-LS1)​​
SG11-LS205
​8
3/11
​1/11
I
ITU-R WP5A
LS/r on proposed suppression of the Compendium of ITU's work on Emergency Telecommunications (ITU-R WP 5A-5A/TEMP/99(Rev.1))​
SG11-LS206
​9
6/11
​2/11​
A
JCA-IMT2020
LS on recent IMT-2020-related developments in Q6/11: consented draft new Recommendation ITU-T Q.5023 “Protocol for managing intelligent network slicing with AI-assisted analysis in IMT-2020 network”
SG11-LS207
I​​​ITU-T Study Group 13
​10
13/11
​3/11
I
ITU-T Study Group 2​
LS/r on Telecommunication Management and OAM Project Plan (SG2-LS203)
SG11-LS208
​11
14/11
​3/11
I
ITU-T Study Group 13,
ETSI ISG NFV
LS on the initiate of a new work item Q.N-att-framework “Framework of NFV automated testing”
SG11-LS209
​12
16/11
3/11​I
All ITU-T Study Groups;
IEEE Future Networks;
IEEE FNI Testbed WG;
TM Forum;
TIP;
O-RAN;
ITU-R WP5A;
ITU-R WP5D;
NGMN;
BBF
LS on consent of Recommendation ITU-T Q.4068 “Open APIs for interoperable testbed federations”
SG11-LS210
​13
16/11
3/11​A
All ITU-T Study Groups​
LS on reference table and pilot projects on conformance and interoperability testing
SG11-LS211


7     
Approved new work items
The following table shows the new approved work items.

#​ QWP

Work item
(Draft Recs)
Title Editors Timing Reference
11/11
​1/11
Q.NICE-SA
Signalling architecture of NICE (Network intelligence capability enhancement) in support of awareness capabilities
Huan Deng, China Telecom, China
denghuan@chinatelecom.cn​
Jianyin Zhang, China Mobile, China
zhangjianyin@chinamobile.com
Cheng Li, CAICT, MIIT, China
licheng@caict.ac.cn
Ying Sun, China Telecom, China
suny22@chinatelecom.cn​
2023-12
SG11-TD101/WP1
​​2
1/11
​1/11
Q.DC-SA
Signalling architecture of data channel enhanced IMS network
Jianyin Zhang, China Mobile, China
zhangjianyin@chinamobile.com Huan Deng, China Telecom, China
denghuan@chinatelecom.cn
Xueqian Bai, China Mobile, China
baixueqian@chinamobile.com
2023-12
SG11-TD102/WP1
​3
2/11
1/11​Q.QKDN_profr
Quantum key distribution networks – Protocol framework
Kaoru KENYOSHI, NICT, Japan
kaoru.kenyoshi@nict.go.jp
Taesang Choi, ETRI, Korea (Rep. of)
choits@etri.re.kr
Hongyu Wu, QuantumCTek Co., Ltd., China
hongyu.wu@quantum-info.com
2022-12
SG11-TD112/WP1
​4
2/11
​1/11
TR-NCDP
Session layer network coding protocol for multicast data transmission
Alexey Borodin, Rostelecom
Sergey Vladimirov, SPbSUT
Anastasia Vybornova, SPbSUT
2023-03
SG11-TD113/WP1​
​5
5/11
​1/11
Q.CNCG-IC
Signalling requirements for intelligent control of cloud-network-converged networks gateway
Aipeng Guo, China Unicom
guoap7@chinaunicom.cn
Junfeng Ma, CAICT
majunfeng@caict.ac.cn
2023-07
SG11-TD95-R1/WP1​
​6
6/11
2/11​Q.PMMC
Protocol for traffic flow coordination of multi-modality communication
Tangqing Liu
Dan Xu
Aipeng Guo
Dan Wang
Xiaonan Shi
2023-03
SG11-TD91/WP2
​7

6/11
​2/11
Q.DIVS-IMT2020
Signalling Requirements and Protocol for Providing Network-oriented Data Integrity Verification Service based on Blockchain in IMT-2020 network
Miao Xue
Nanxiang Shi
Xiaoou Liu
Mengxuan Ren
Tangqing Liu
2023-12
SG11-TD92/WP2
​​8
​14/11
3/11​Q.N-att-framework​​Framework of NFV automated testing​​
Tiancheng Liu, China Telecom
liutc2@chinatelecom.cn
Linze Wu, China Telcom
wulinz@chinatelecom.cn
2023-12​​SG11-TD88/WP3​


8     
Future meetings and next Study Group 11 meeting
8.1  Interim Rapporteur Group e-meetings (RGM)
Four interim Rapporteur Group e-meetings will be held before the next meeting of SG11 (virtual, 1-10 December, to be announced).

QuestionWP
Date Place / Host Terms of reference Contact
​Email reflector
2/11​
1/11
27-28 September 2021
e-meeting
- Progress draft ITU-T Q.QKDN_profr
- Consider possible new work items on protocols of QKDN
- But not limited to
Cheng Li

t17sg11q2@lists.itu.int
​4/11
1/11​
31 August -
2 September 2021
e-meeting​​- Progress Q.SFPtr and Q.SCC to be ready for consent in December meeting
- But not limited to
chengying10@chinaunicom.cn​
​t17sg11q4@lists.itu.int​
​7/11
​2/11
27 September -
1
 October 2021
e-meeting​- Progress ongoing work items
- Discuss new work item proposals
Q7/11 Rapporteur
Jongmin Lee
jminlee@sk.com
​t17sg11q7@lists.itu.int​
​​8/11
2/11
27 September -
1 October 2021
​​
e-meeting- Progress ongoing work items
Discuss new work item proposals
Q8/11 Rapporteur
Changkyu Lee
t17sg11q8@lists.itu.int​

8.2     Next SG11 meeting
The next SG11 meeting is scheduled to take place fully virtually, from 1 to 10 to December 2021.

9     Liaison officers and Rapporteurs
The list of WP1/11 Rapporteurs is contained in SG11-TD70/WP1.
The list of WP2/11 Rapporteurs is contained in SG11-TD75/WP2.
The list of WP3/11 Rapporteurs is contained in SG11-TD67-R1/WP3. Ms Linze Wu, China Telecommunications Corporation, China, was appointed as Associate Rapporteur for Q14/11.
No changes were made to the list of liaison officers.
The list of Rapporteurs and Associate Rapporteurs can be found at: https://www.itu.int/net4/ITU-T/lists/loqr.aspx?Group=11&Period=16.