Notes: Some meeting dates and venues were not finalized at the time of the Study Group 12 meeting, and they will be confirmed at a later stage. The meetings noted as "planned" were pre-approved by SG 12 and will be confirmed once sufficient number of participants and contributions is ensured.
Question |
Date |
Place |
Host |
Objectives |
Remarks |
6/12 |
26-27 October 2010 |
Geneva, ITU Headquarters |
ITU |
- to work on a proposal for suitable speech material and analysis methods which can be used for objective testing and is to be integrated in P.501 and P.502.
|
Confirmed |
7/12 |
5-8 July 2010 |
Lannion, France |
France Telecom Orange |
- review the test results of Optimisation/Characterisation of G.711.1 & G.722 SWB extension (mono).
- review the test results of the Music experiment to evaluate the performance of proposed G.718 decoder-side post-processing for high frequency pitches,
- progress the Handbook STP,
- any other issues for which input contributions will be provided.
|
Confirmed |
7/12 |
Week 6-10 December 2010 |
Lannion, France |
France Telecom Orange |
- review the test results of Optimisation/Characterisation of G.711.1 & G.722 SWB extension (stereo step1).
- draft the test plan and review the processing plan of Characterisation phase 2 of G.711.1 & G.722 SWB extension (MS stereo)
- progress the Handbook STP
|
Confirmed |
9/12 (joint meeting with 14/12 & 17/12) |
15-17 September 2010 |
Berlin, Germany |
DT |
- selection of detectors for P.TCA
- technical requirement specification of P.AMD
- discussion and agreement on draft Recommendation P.OLQA
|
Confirmed |
13/12 |
tbd |
tbd |
tbd |
- G.OMVAS ToR and test plan
- G.IPTV-PMPD
- Other topics as necessary
|
Planned |
14/12 (joint meeting with 9/12 & 17/12) |
15-17 September 2010 |
Berlin, Germany |
DT |
- Review of P.NAMS participating parties
- Finalize the P.NAMS Test Plan
- Continue with P.NAMS selection critera
- Finalize P.NBAMS Requirement Specification
- Create the draft P.NBAMS Test Plan
- Draft the P.NBAMS selection criteria
- Send call for model submission for P.NBAMS
|
Confirmed |
17/12 (joint meeting with 9/12 & 14/12) |
15-17 September 2010 |
Berlin, Germany |
DT |
- As the highest priority, advancing the new Recommendation Y.156sam, on Ethernet Service Activation Test Methodology.
- Advancing a revised version of Y.1540, including the new parameters now described in Appendices.
- Contributions investigating how these new performance parameters can possibly advance the work of Q13 and Q14.
- Advancing a revised version of Y.1541, including reviewing the provisional classes.
- Advancement of the new Recommendation Y.154HN covering home network performance.
- Other topics as necessary
|
Confirmed |
All planned meetings will only take place if justified by a sufficient number of input documents. |