|
List of Delayed Contributions (Meeting 21 - 30 September 1999) | |
[COM12-D96] Rapporteur on question 9/12: Draft new Recommendation P.350 | |
[COM12-D97] Rapporteur on question 9/12: Draft revised Recommendation P.342 | |
[COM12-D98] Rapporteur on question 9/12: Draft new Recommendation P.310 | |
[COM12-D99] Robert Bosch GmbH (Q18, 20/13): Proposal for a new Recommendation: Conversational impacts on end-to-end speech transmission quality - a planning guide on effects not recovered by the E-Model | |
[COM12-D100] Federal Republic of Germany (Q13/12): Results of objective speech quality assessment to ITU-T 8 Kbits/s characterization test using the enhanced version of TOSQA | |
[COM12-D101] British Telecom (Q15/12): Corrected performance analysis of the CCI and non-intrusive version of the E-model over a range of network conditions | |
[COM12-D102] British Telecom (Q15/12, Q22/12): Comparison of opinion scales for subjective listening tests | |
[COM12-D103] Editor of draft new Recommendation G.108 (Q18/12): Proposed editorial changes to draft new Recommendation G.108 as presented in COM 12-80 | |
[COM12-D104] L.M. Ericsson (Sweden): (Q8/12, Q9/12): Errors at LSTR measurements | |
[COM12-D105] Nortel Networks (Canada), (Q16/12, Q20/12): Correction of values of Ie in Recommendation G.113, appendix I | |
[COM13-D106] Nortel Networks (Canada), (Q16/12): Comments on draft new Recommendation G.109 | |
[COM106rev] Nortel Networks (Canada): Comments on draft new Recommendation G.109 | |
[COM12-D107] Canada (Q16/12, Q21/12): Comments on COM 12-93, proposed revision to Recommendation G.114 | |
[COM12-D108] Nortel Networks (Canada): Performance of current perceptual objective speech quality measures | |
[COM12-D109] Nortel Networks (Canada), (Q23/12, Q18/12): Subjective evaluation of packet loss concealment (PLC) techniques | |
[COM12-D110] Nortel Networks (Canada), (Q20/12, Q23/12): Subjective results on impairment effects of IP packet loss | |
[COM12-D111] Nortel Networks (Canada), (Q16/12, Q20/12): Proposed Ie values for G.711, G.711 with PLC and GSM EFR | |
[COM12-D112] Canada (Q1/12): Future work programme of Study Group 12 | |
[COM12-D113] AT&T (Q14/12, Q16/12, Q20/12): E-model equipment impairment factors for G.711 with frame erasure concealment | |
[COM12-D114] AT&T (Q14/12): Results of a subjective listening test for G.711 with frame erasure concealment | |
[COM12-D115] Nortel Networks (Canada), (Q13/12): Proposal for using the Nortel objective measures speech database in the evaluation of objective measures for updating P.861 | |
[COM12-D116] British Telecom (Q14/12, Q22/12): Subjective selection test results for the ITU-T wideband (7 khz) speech coding algorithm at 24 and 32 kbit/s | |