ITUInternationalFrançais Español
OurNewsEventsPublicationsSiteAbout
Print Version
ITU
Home Page : Publications
Delayed Contributions. Meeting: 23 January-2 February 2001. From 1 to 24

[COM2-D001] Telecommunication Administration of the Russian Federation (Q.8/2): Proposal for the Q.2706 contents. The calculation of a delay using the SSCOP error correction mechanism
[COM2-D002] Worldcom (Q.1/2): Opening of E.164 resources procedures - Project 36
[COM2-D003] Worldcom (Q.1/2): Assignment of international routing addresses
[COM2-D004] Worldcom (Q.1/2): Criteria for assignment of CCs for Group of Countries
[COM2-D005] UK (Q.1, 3/2): Proposed new draft Recommendation F.gmdss (Telecommunication Service Principles and Operational Requirements for the Global Maritime Distress and Safety System)
[COM2-D006] Telenor (Q.1/2): First draft E.NNA (naming, numbering and addressing requirements for connectivity between E.164 and IP-addressed networks
[COM2-D007] Verizon (Q.1/2): Modifications to E.164 numbering plans - Project 36
[COM2-D008] Sprint (Q.1/2): Assignment procedures for UPT numbers
[COM2-D009] Telcordia (Q.1/2): Realignment to the ITU-T Series Recommendations that utilize E.164 numbering resources
[COM2-D010] Telcordia (Q.1/2): Revision to Recommendation E.191
[COM2-D011] UK (Q.1, 3/2): Review of the use of geographic country codes based on the reported use of 269 for the 'Global269' concept
[COM2-D012] ICO (Q.3, 1/2): A possible new Recommendation to provide descriptions for service elements to create a service incorporating voice, data and other service attributes
[COM2-D013] ICO (Q.ALL): Proposal to establish general guidelines on the preparation of English texts for ITU-T Recommendations
[COM2-D014] WIND (Q.5/2): Assessment of QoS/NP parameters based on live traffic in ISDN networks
[COM2-D015] France (Q.1/2): Conditions for implementation of ENUM
[COM2-D016] France (Q.1/2): Demand of an MCC code for Mayotte Island
[COM2-D017] UK (Q.1, 2, 6, 9/2): Need to ensure wider visibility of E.TE within the ITU-T
[COM2-D018] C&W (Q.5, 3/2): Review of call completion ratio metrics and their explanation contrained in Recommendation E.425
[COM2-D019] BT (Q.6, 9/2): A class of overload controls based on controlling call reject rates
[COM2-D020] AT&T, Neustar (Q.1, 3/2): ENUM administrative processes
[COM2-D021] ICO (Q.3, 1/2): Information document as submitted to WTPF IEG on ways of defining IP telephony
[COM2-D022] Telekom Austria (Q.1, 3/2): UPT-Service description (VISIONng Phase 1)
[COM2-023] Telekom Austria (Q.1, 3/2): Interworking with IN-based UPT Implementations
[COM2-D024] Telekom Austria (Q.1, 3/2): Answers/remarks to the last Q.1/2 and Q.10/2 Reports concerning UPT
Top - Feedback - Privacy - Copyright © ITU 2001 All Rights Reserved
Contact for this page : webmaster@itu.int
Updated : 2007-03-30