PaginaUniónEnglish Français
NuestrosNoticiasEventosPublicacionesMapaInfo
Copia Imprimible
Pagina
Pagina Principal : Publicaciones
Delayed Contributions. Meeting: 10-14 December 2001

[COM6-D014] Rapporteur Q.5/6(Q5/6): Proposed contents of new Rec. "Optical fibre maintenance criteria for access networks"
[COM6-D015] NTT(Q5/6): Information about test light bypass module for ring optical networks
[COM6-D016] NTT(Q6/6): Request for revision of COM 6-15 (draft new Rec. L.48)
[COM6-D017] NTT(Q6/6): Request for revision of COM 6-14 (draft new Rec. L.49)
[COM6-D018] Rapporteur Q.8/6(Q8/6): A table of contents plan for Recs. on optical fibre cables
[COM6-D019] Rapporteur Q.9/6(Q9/6): Collected information on construction of optical networks in access areas
[COM6-D020] Rapporteur Q.4/6(Q4/6): Installation of optical cables along the railways. Answers to Questionnaire (I)
[COM6-D021] Rapporteur Q.5/6(Q4/6): Installation of optical fibre cables along the railways. Answers to questionnaire (II)
[COM6-D022] Italy(Q5,6/6): Optical cables for micro-trench installation
[COM6-D023] Korea Telecom(Q3/6): Crosstalk coupling between ADSL services with different transmitter locations in a same apartment premise cable
[COM6-D024] Rapporteur Q.7/6(Q7/6): Draft framework for a new Recommendation: Performance specification for passive node elements in optical networks: distribution frames, sealed closures, free breathing closures, cabinets, wall mounted boxes
[COM6-D025] Italy(Q5/6): Active fiber monitoring

Comienzo de la página - Comentarios - Confidencial - Copyright © ITU 2001 Reservados todos los derechos
Contacto public : webmaster@itu.int
Puesto al dia el 2007-03-30