|
[COM6-D74] NTT, Japan (QALL/6): New Question for Study Period 2001-2004 "Design of all-optic network in access area" | |
[COM6-D75] Korea Telekom (Q4/6): Loop requirements for installing a number of ISDN or HDSL in the same cable | |
[COM6-D76] Italy (Q5/6): New item proposals for Question 5/6 | |
[COM6-D77] Italy (Q6/6): Comments on COM 6-76 related to draft new Recommendation "Optical fibre outside plant maintenance support, monitoring and testing system" | |
[COM6-D78] Italy (Q9/6): Methods and new technologies for submarine utilities detection in the shore approach areas for telecommunication cables | |
[COM6-D79] Korea Telecom (Q5/6, Q6/6): Draft new Recommendation: "Considerations for planning of the optical fibre feeder networks" | |
[COM6-D80] Korea Telecom (Q5/6, Q6/6): Application of distribution methods in optical access networks | |
[COM6-D81] Telefónica de Argentina (Q2/6): Proposal for Question B/6 on "Fire protection" for the next study period | |
[COM6-D082] Lucent Technologies (Q10/6): Revision to Appendix I to Rec. L.12 - For approval | |
[COM6-D083] United Kingdom (Q6/6): Comments on COM 6-76 | |
[COM6-D084] United Kingdom (Q11/6): Comments on COM 6-74 | |
[COM6-D085] MPT of Japan (Q12/6): Request for revision of L.39 (Titled: Investigation of the soil before using trenchless techniques) | |