International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-R : IPG.01 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R IPG.01  C 

ITU-R IPG.01

Intersessional Planning Group

Results:51 total items.
Result page:  1 - 2  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source Date
[ 51 ]  
 
Report of the first meeting of the Intersessional Planning Group (IPG)     Chairman, IPG   2005-07-15
[ 50 ]  
 
Note from the convener of the group reviewing the time schedule for production of the draft plan     Special Convener   2005-07-08
[ 49 ]  
 
Report from the Chairman of ad hoc Group 2 on administrative declarations to the Plenary     Chairman, ad hoc Group 2   2005-07-07
[ 48 ]  
 
Proposed instructions to the PXT for the application of the principle of equitable access     Chairman, ad hoc Group 1   2005-07-07
[ 47 ]  
 
Second and Final Report from the Chairman of Working Group 2 to the Plenary     Chairman, WG2   2005-07-07
[ 46 ]  
 
Final List of Participants - Intersessional Planning Group     Director, BR   2005-07-07
[ 45 ]  
 
Report from the Chairman of Working Group 4 to the Plenary     Chairman, WG4   2005-07-07
[ 44 ]  
+Add.1 
Fifth Report from the Chairman of Working Group 1 to the Plenary     Chairman, WG1   2005-07-06
[ 43 ]  
 
Report from the Chairman of Working Group 3 to the Plenary     Chairman, WG3   2005-07-06
[ 42 ]  
+Add.1-4 
Report of the IPG Meeting     Chairman, IPG   2005-07-06
[ 41 ]  
 
Third Report from the Chairman of Working Group 1 to the Plenary     Chairman, WG1   2005-07-05
[ 40 ]  
(Rev.1) 
Fourth Report from the Chairman of Working Group 1 to the Plenary     Chairman, WG1   2005-07-05
[ 39 ]  
 
First report from the Chairman of Working Group 2 to the Plenary     Chairman, WG2   2005-07-05
[ 38 ]  
 
Second report from the Chairman of Working Group 1 to the Plenary     Chairman, WG1   2005-07-04
[ 37 ]  
(Rev.1) 
First Report from the Chairman of Working Group 1 to the Plenary     Chairman, WG1   2005-07-04
[ 36 ]  
 
Testing and validation of the planning software     Director, BR   2005-07-01
[ 35 ]  
 
Contribution from the EBU technical departement : global coordination and local declaration     Director, BR   2005-07-01
[ 34 ]  
 
Contribution from the EBU technical department : calculated margins     Director, BR   2005-06-30
[ 33 ]  
 
Contribution to the First Meeting of the Intersessional Planning Group (IPG) 4-8 July 2005     Lesotho (Kingdom of)   2005-06-29
[ 32 ]  
(Rev.1) 
Summary of results from the first planning exercise     Director, BR   2005-06-28
[ 31 ]  
 
Progress Report on the planning exercise team     Director, BR   2005-06-28
[ 30 ]  
 
Contribution de la République démocratique du Congo au Groupe de Planification Intersession (GPI) à Genève     République démocratique du Congo   2005-06-27
[ 29 ]  
 
A proposal for the subdivision of the RRC planning area     United Kingdom of Great Britain and Northern Ireland   2005-06-27
[ 28 ]  
 
Equitable access     Syrian Arab Republic   2005-06-27
[ 27 ]  
 
Existing and planned assignments of primary services other than broadcasting     Israel (State of)   2005-06-24
[ 26 ]  
 
Unified protection criteria for the land mobile and fixed services from interference by DVB-T and T-DAB     Israel (State of)   2005-06-24
[ 25 ]  
 
Interference protection criteria for the land mobile and fixed services - observations to Document IPG-1/16     Israel (State of)   2005-06-24
[ 24 ]  
 
Proposal for additional planning variants     Netherlands (Kingdom of the)   2005-06-23
[ 23 ]  
 
CEPT views on the values for missing criteria and parameters     France   2005-06-23
[ 22 ]  
 
Review of the time schedule for production of the draft plan     Germany (Federal Republic of)   2005-06-21
[ 21 ]  
 
Proposal on a mechanism for administrative declarations to be taken into account in the planning process     Germany (Federal Republic of)   2005-06-21
[ 20 ]  
 
Presentation of the output results     Director, BR   2005-06-10
[ 19 ]  
+Add.1 
Input Data for the first planning exercise     Director, BR   2005-06-09
[ 18 ]  
 
Working assumptions for the conduct of the intersessional activities: Issues related to Chapter 6 of the RRC-04 Report     Director, BR   2005-06-06
[ 17 ]  
+Add.1 
Working assumptions for the conduct of the intersessional activities: Issues related to Chapter 5 of the RRC-04 Report     Director, BR   2005-06-06
[ 16 ]  
 
Working assumptions for the conduct of the intersessional activities: Issues related to Chapter 4 of the RRC-04 Report     Director, BR   2005-06-06
[ 15 ]  
 
Working assumptions for the conduct of the intersessional activities: Issues related to Chapter 3 of the RRC-04 Report     Director, BR   2005-06-06
[ 14 ]  
 
Working assumptions for the conduct of the intersessional activities: Issues related to Chapter 2 of the RRC-04 Report     Director, BR   2005-06-06
[ 13 ]  
 
Working assumptions for the conduct of the intersessional activities: Issues related to Chapter 1 of the RRC-04 Report     Director, BR   2005-06-06
[ 12 ]  
 
Working assumptions for the conduct of the intersessional activities: General     Director, BR   2005-06-06
[ 11 ]  
+Add.1 
Views of the Working Parties of the ITU-R Study Groups on the working assumptions adopted by the Planning Exercise Team     Director, BR   2005-05-13
[ 10 ]  
(Rev.1) 
Contribution from Syria     Syrian Arab Republic   2005-04-19
[ 9 ]  
 
Characteristics and protection criteria for aeronautical radionavigation service systems in the band 645-862 MHz     Russian Federation   2005-04-14
[ 8 ]  
 
Comments on Report of the Director, Radiocommunication Bureau (Document IPG-1/6)     Iran (Islamic Republic of)   2005-04-06
[ 7 ]  
(Rev.1) 
Report of the IPG Steering Group to the IPG     Chairman, IPG   2005-04-06
[ 6 ]  
 
Intersessional and other activities in respect of the preparations for RRC-06: Status report     Director, BR   2005-03-30
[ 5 ]  
 
Working assumptions regarding the missing protection ratio values for DVB-T to be used for compatibility analysis in the context of the first planning exercise     Director, BR   2005-03-11
[ 4 ]  
 
Working assumptions regarding the missing criteria and parameters to be used for compatibility analysis in the context of the first planning exercise     Director, BR   2005-03-11
[ 3 ]  
 
Liaison statements from the WP RPG     Director, BR   2005-02-09
[ 2 ]  
 
Information concerning the propagation prediction method contained in Annex 2.1 of the Report from the First session of the Regional Radiocommunication Conference (RRC-04) to the second session of the Conference     Director, BR   2005-01-10
Results:51 total items.
Result page:  1 - 2  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2005-01-07