Unión Internacional de Telecomunicaciones   UIT
English  Français
 
Mapa Contáctenos Copia Imprimible
  Página principal : UIT-R : WP5B : Contribuciones : 673 Nuevo -  Busque los documentos de la reunión
   
[673]  Draft liaison statement to Working Parties 3J and 3M and Working Party 4B (for information only) - Propagation end-to-end link availability of unmanned aircraft system operating with dual beyond line-of-sight (BLOS) satellite communications (SATCOM) links to achieve the desired link availability

Formato

Tamaño

Puesta a disposición

English

Word  

832470 octetos 2011-06-02 [673] 
 

Documento :

UIT-R WP5B  Contribución  673

Título :

Draft liaison statement to Working Parties 3J and 3M and Working Party 4B (for information only) - Propagation end-to-end link availability of unmanned aircraft system operating with dual beyond line-of-sight (BLOS) satellite communications (SATCOM) links to achieve the desired link availability

Recibido en :

2011-06-01

Origen :

United States of America

Disponibilidad :

Restringido a usuarios de TIES [UIT-R]

Comienzo de la página -  Comentarios -  Contáctenos -  Copyright © UIT 2008 Reservados todos los derechos
Contacto público :  Coordenador de Web UIT-R
Actualizado el : 2011-06-02