International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP7A : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP7A  C 

ITU-R WP7A

Time Signals and Frequency Standard Emissions

Results:101 total items.
Result page:  1 - 2 - 3  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 101 ]  
 
Liaison statement to CISPR (copy for infromation to Study Group 1 and Working Parties 1A, 5A, 5B and 7A) - Update to broadcasting services protection requirements in the CISPR radio sevices database     WP 6A   Q32/6   2019-07-29
[ 100 ]  
 
Reply liaison statement to Working Party 7A - Draft revision of Recommendation ITU-R SM.2110-0 - Frequency ranges for operation of non-beam wireless power transmission systems     WP 1A     2019-06-24
[ 99 ]  
 
Reply liaison statement to CISPR (copy to ITU-R Working Parties 1A, 5A, 5B, 6A and 7A) - Establishment of liaison between CISPR-B and the relevant groups in ITU-R     WP 1A     2019-06-21
[ 98 ]  
 
Reply liaison statement to ITU-R Working Parties 5A and 5D and ITU-T Study Group 15 and 3GPP TSG RAN (copy to ITU-R Working Parties 5B, 5C, 6A, 7A, 7B, 7C and 7D) - Working document towards a preliminary draft revision of Report ITU-R SM.2351-2 on Smart Grid Utility Management Systems     WP 1A     2019-06-21
[ 97 ]  
 
Reply liaison statement to ITU-T Study Group 15 (copy to Working Parties 5A, 5B, 5C, 5D, 6A, 6B, 7A, 7B and 7D) - Liaison acitvities on the G.mgfast and G.fast - Power Spectral Density specifications     WP 1A     2019-06-21
[ 96 ]  
 
Liaison statement to Working Parties 4A, 4B, 5A, 5B, 5C, 5D, 6A, 7A, 7B, 7C and 7D) - Liaison between ITU-R and CISPR ont the protection of radio services in the 6-40 GHz frequency range     WP 1A     2019-06-18
[ 95 ]  
 
Liaison statement to CISPR on EMC standards and limits (copy to ITU-T Study Group 5 and ITU-R Working Parties 1C, 4A, 4B, 5A, 5B, 5C, 5D, 6A, 7A, 7B, 7C and 7D) - Further cooperation on reducing EMI and RF noise     WP 1A     2019-06-18
[ 94 ]  
 
Reply liaison statement to CISPR on EMC standards and limits (copy for information to ITU-T Study Group 5 and ITU-R Working Parties 1C, 4A, 4B, 5A, 5B, 5C, 5D, 6A, 7A, 7B, 7C and 7D) - Further cooperation on reproted cases of interference     WP 1A     2019-06-18
[ 93 ]  
 
Reply liaison statement to Working Party 6A (copy for information to Working Parties 1A, 5A, 5B and 7A) - Frequency use by non-beam Wireless Power Transmission for Electric Vehicle (WPT-EV) applications using magnetic resonance power transfer     WP 1B     2019-06-17
[ 92 ]  
 
Reply liaison statement to Working Party 7A - Study on Resolution 655 (WRC-15) "Definition of time scale and dissemination of time signals via radiocommunication systems"     WP 7C     2019-06-10
[ 91 ]  
+Ann.02(Rev.1) 
Report on the meeting of Working Party 7A (Geneva, 28-31 May 2019)     Chairman, WP 7A     2019-05-31
[ 90 ]  
 
Final List of Participants - Working Party 7A (Geneva, 28-31 May 2019)     Director, BR     2019-05-31
[ 89 ]  
 
List of documents issued (Documents 7A/73 - 7A/89)     BR Study Groups Department     2019-05-27
[ 88 ]  
 
Proposals to amend the working document towards a preliminary draft new Report ITU-R TF.[UTC]     Germany (Federal Republic of)     2019-05-23
[ 87 ]  
 
Draft revision to working document towards a preliminary draft new Report ITU-R TF.[SFTS PROTECTION CRITERIA]     United Kingdom of Great Britain and Northern Ireland     2019-05-21
[ 86 ]  
 
Reply liaison statement to Working Party 1B on SFTS protection criteria     United Kingdom of Great Britain and Northern Ireland     2019-05-21
[ 85 ]  
 
Proposed draft revision of the Handbook: Selection and use of precise frequency and time systems - Chapter 1: Introduction and basic concepts     United States of America     2019-05-21
[ 84 ]  
 
Proposal for modification of working document towards the preliminary draft new Report ITU-R TF.[UTC] - Content and structure of time signals to be disseminated by radiocommunication systems and various aspects of current and potential future reference time scales, including their impacts and applications in radiocommunication     Japan     2019-05-20
[ 83 ]  
 
Proposals to working document towards a preliminary draft new Report ITU-R TF.[SFTS PROTECTION CRITERIA]     Russian Federation     2019-05-20
[ 82 ]  
 
Proposals to working document towards the preliminary draft new Report ITU-R TF.[UTC]     Russian Federation     2019-05-20
[ 81 ]  
 
Proposed modification to the working document towards a preliminary draft new Report ITU-R TF.[UTC]     France     2019-05-20
[ 80 ]  
 
Reply liaison statemen to Working Party 1A (copy to ITU-T Study Group 15 and ITU-R Working Parties 5B, 5C, 5D, 6A, 7A, 7B, 7C and 7D) - Preliminary draft revision of Report ITU-R SM.2351-2 on Smart Grid Utility Management Systems     WP 5A     2019-05-13
[ 79 ]  
 
Liaison statement to Working Parties 1A and 1B (copy for information Working Parties 5A, 5B, and 7A) - Frequency use by non-beam Wireless Power Transmission (WPT) applications using inductive power transfer     WP 6A     2019-02-04
[ 78 ]  
 
Reply liaison statement to Working Party 1A (copy to ITU-T Study Group 15 and ITU-R Working Parties 5A, 5B, 5C, 6A, 7A, 7B, 7C and 7D) - Preliminary draft revision of Report ITU-R SM.2351-2 on smart grid utility management systems     WP 5D     2019-03-05
[ 77 ]  
 
Liaison statement to Working Party 3L (copy for information to Working Parties 1A, 1C, 5A, 5B, 6A, and 7A) - Building entry losses in the frequency range 9 kHz to 10 MHz (far field and near field) (Question ITU-R 210-3/1)     WP 1B   AI9.1   2018-11-29
[ 76 ]  
 
Reply liaison statement to ITU-R Working Party 1A and the Rapporteur Group on the coexistence of wired telecommunication with radiocommunication systems (copy to Working Parties 5C and 5D) (copy for information to Working Parties 5B, 6A, 7A, 7B, 7C, 7D and ITU-T SG 15) - Preliminary draft revision of Report ITU-R SM.2351-2 on Smart Grid utility Management Systems     WP 5A     2018-11-20
[ 75 ]  
 
Reply liaison statement to ITU-R Working Pary 1A (copy for information to ITU-T Study Group 15 and ITU-R Working Parties 5A, 5B, 5C, 6A, 7A, 7B, 7C and 7D) - Preliminary draft revision of Report ITU-R SM.2351-2 on Smart grid utility management systems     WP 5D     2018-10-23
[ 74 ]  
 
Reply liaison statement to Working Party 7A - Study on Resolution 655 (WRC-15) "Definition of time scale and dissemination of time signals via radiocommunication systems"     WP 7C     2018-09-26
[ 73 ]  
+Ann.1-2 
Report of the meeting of Working Party 7A (Geneva, 19-25 September 2018)     Chairman, WP 7A     2018-09-25
[ 72 ]  
 
Final List of Participants - Working Party 7A (Geneva, 19-25 September 2018)     Director, BR     2018-09-25
[ 71 ]  
 
List of documents issued (Documents 7A/57 - 7A/71)     BR Study Group Department     2018-09-18
[ 70 ]  
 
United Kingdom MSF 60 KHz standard frequency and time signal service (SFTS) transmission and reception     United Kingdom of Great Britain and Northern Ireland     2018-09-12
[ 69 ]  
 
Draft reply liaison statement to International Bureau of Weights and Measures     Russian Federation     2018-09-11
[ 68 ]  
 
Proposals to working document towards the preliminary draft new Report ITU-R TF[UTC] - Content and structure of time signals to be disseminated by radiocommunication systems and various aspects of current and potential future reference time scales, including their impacts and applications in radiocommunication     Russian Federation     2018-09-11
[ 67 ]  
(Rev.1) 
Reply liaison statement to Working Party 7A (copy to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 6A, 6B, 6C, 7B, 7C and 7D) - Study on Resolution 655 (WRC-15) «Definition of time scale and dissemination of time signals via radiocommunication systems» regarding FSS/MSS/BSS     WP 4B     2018-07-06
[ 66 ]  
 
Liaison statement to Working Parties 5A, 5B, 6A and 7A (copy to Working Party 1B for information) on preliminary draft revision of Recommendation ITU-R SM.2110-0 - Frequency ranges for operation of non-beam wireless power transmission systems     WP 1A   Q210/1   2018-06-29
[ 65 ]  
 
Liaison statement to ITU-T Study Group 15 and ITU-R Working Parties 5A, 5B, 5C, 5D, 6A, 7A, 7B, 7C and 7D - Preliminary draft revision of Report ITU-R SM.2351-2 on Smart Grid utility management systems     WP 1A     2018-06-29
[ 64 ]  
 
Reply liaisons statement to ITU-T Study Group 15 (copy to ITU-R Working Parties 5A, 5B, 5C, 5D, 6A, 7A, 7B and 7D) - Liaison activities on the G.mgfast PSD specification     WP 1A     2018-06-29
[ 63 ]  
 
Liaison statement to CISPR and ITU-T Study Group 5 on EMC standards and limits (copy to ITU-R Working Parties 1C, 4A, 4B, 5A, 5B, 5C, 5D, 6A, 7A, 7B, 7C & 7D) - Further Reports of Disturbances to Radiocommunication systems     WP 1A     2018-06-21
[ 62 ]  
 
Reply liaison statement to Working Party 7A (copy for information to Working Parties 4A, 4B, 4C, 5A, 5B, 5C, 6A, 6B, 6C, 7B, 7C, and 7D) - Study on Resolution 655 (WRC-15) "Definition of time scale and dissemination of time signals via radiocommunication systems" and UTC application in IMT systems     WP 5D     2018-06-21
[ 61 ]  
 
Reply liaison statement to Working Party 6A (copy to Working Parties 1A, 5B and 7A) - Draft CPM text on WRC-19 agenda item 9.1, Issue 9.1.6     WP 1B   AI9.1   2018-06-28
[ 60 ]  
 
Reply liaison statement to Working Party 7A (copy for information to Working Parties 5A and 5D) - Coordinated universal time application in the systems of the maritime mobile service, including global maritime distress and safety service, aeronautical mobile service and radiodetermination service     WP 5B     2018-05-30
[ 59 ]  
 
Reply liaison statement to Working Party 7A - Study on Resolution 655 (WRC-15) "Definition of time scale and dissemination of time signals via radiocommunication systems"     WPs 7B and 7C     2018-05-22
[ 58 ]  
 
Reply liaison statement to Working Party 7C - UTC application in radio astronomy service systems     WP 7D     2018-05-21
[ 57 ]  
+Ann.1-2 
Report of the meeting of Working Party 7A (Geneva, 14-18 May 2018)     Chairman, WP 7A     2018-05-18
[ 56 ]  
 
Final List of Participants - Working Party 7A (Geneva, 14-18 May 2018)     Director, BR     2018-05-18
[ 55 ]  
 
List of documents issued (Documents 7A/43 - 7A/55)     BR Study Groups Department     2018-05-11
[ 54 ]  
 
Working document towards a preliminary draft new Recommendation ITU-R TF.[time]     United States of America     2018-05-07
[ 53 ]  
 
Working document towards a preliminary draft new Recommendation ITU-R TF.[Relativistic] Relativistic Time Transfer     United States of America     2018-05-07
[ 52 ]  
 
Reply liaison statement to ITU-R Working Party 7A on UTC (copy to Working Parties 4A, 4B, 4C, 5A, 5B, 5C, 5D, 6A, 6C, 7B, 7C and 7D) - Study on Resolution 655 (WRC-15) «Definition of time scale and dissemination of time signals via radiocommunication systems» regarding broadcasting systems     WP 6B     2018-05-04
Results:101 total items.
Result page:  1 - 2 - 3  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2019-08-01