International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-R : WP7B : Contributions : 36 Recently posted -  Search Meeting Documents
   
[36]  Report of the meeting of Working Party 7B (Geneva, 5-7 April 2016)

Format

Size

Posted

English

Word  

66926 bytes 2016-04-13 [36] Annex 19 - Draft communication to Study Group 7 - Draft note from Chairman, ITU-R Study Group 7 to the Director of Radiocommunication Bureau (VN)

Word  

66243 bytes 2016-04-13 [36] Annex 18 - Draft liaison statement to Working Party 5B regarding agenda item 1.10

Word  

390156 bytes 2020-12-16 [36] Annex 17 - Working document towards a preliminary draft new Report - Characteristics to be used for assessing interference to systems operating in the Earth exploration-satellite and meteorological-satellite services, and for conducting sharing studies

Word  

107687 bytes 2016-04-13 [36] Annex 16 - Working document toward a PDN Report ITU-R SA.[400 MHZ-LIMITS] - Sharing studies to consider in-band power limits for earth stations operating in the frequency ranges 399.9-400.05 MHz and 401-403 MHz within the MSS, EESS and MetSat services

Word  

66207 bytes 2016-04-13 [36] Annex 15 - Working document on the work plan and milestones for agenda item 1.2

Word  

103296 bytes 2016-04-13 [36] Annex 14 - Working document toward a preliminary draft new Report ITU-R SA.[460 MHz METSAT-EESS]: Studies related to proposed change in 460-470 MHz secondary allocation for MetSat to primary and addition of primary allocation to EESS

Word  

84015 bytes 2016-04-13 [36] Annex 13 - Preliminary draft revised Recommendation ITU-R SA.1027-4 - Sharing criteria for space-to-Earth data transmission systems in the Earth exploration-satellite and meteorological-satellite services using satellites in low-Earth orbit

Word  

72404 bytes 2016-04-13 [36] Annex 12 - Preliminary draft revised Recommendation ITU-R SA.1025-3 - Performance criteria for space-to-Earth data transmission systems operating in the Earth exploration-satellite and meteorological-satellite services using satellites in low-Earth orbit

Word  

115951 bytes 2016-04-12 [36] Annex 11 - Preliminary draft revised Recommendation ITU-R SA.1026-4 - Aggregate interference criteria for space-to-Earth data transmission systems operating in the Earth exploration-satellite and meteorological-satellite services using satellites in low-Earth orbit

Word  

65861 bytes 2016-04-13 [36] Annex 10 - Working document on the work plan and milestones for agenda item 1.3

Word  

84890 bytes 2016-04-13 [36] Annex 09 - Preliminary draft revision to Recommendation ITU-R SA.1014-2 - Telecommunication requirements for manned and unmanned deep-space research

Word  

80470 bytes 2016-04-12 [36] Annex 08 - Draft liaison statement to Task Group 5/1 on parameters for WRC-19 agenda item 1.13

Word  

3960568 bytes 2016-04-13 [36] Annex 07 - Proposal for a potential revision of Recommendation ITU R P.528 and Report ITU-R P.2345 by Working Parties 3K and 3M

Word  

108934 bytes 2016-04-13 [36] Annex 06 - Preliminary draft revision to Recommendation ITU-R SA.1019 - Preferred frequency bands and transmission directions for data relay satellite systems

Word  

157085 bytes 2016-04-13 [36] Annex 05 - Preliminary draft revision to Recommendation ITU-R SA.1018 - Hypothetical reference system for systems comprising data relay satellites in the geostationary orbit and user spacecraft in low Earth orbits

Word  

78226 bytes 2016-04-13 [36] Annex 04 - Preliminary draft revision to Recommendation ITU-R SA.1743 - Maximum allowable degradation to radiocommunication links of the space research and space operation services arising from interference from emissions and radiations from other radio sources

Word  

68428 bytes 2016-04-13 [36] Annex 03 - Proposed modifications to Question ITU-R 254/7 - Characteristics and spectrum requirements of satellite systems using nanosatellites and pico-satellites

Word  

176359 bytes 2016-04-13 [36] Annex 02 - Working document towards a preliminary draft new Report ITU-R SA.[SHORT DURATION NGSO] - Studies to accommodate requirements in the space operation service for non-geostationary satellites with short duration missions

Word  

61529 bytes 2016-04-12 [36] Annex 01 - Working document on the work plan and milestones for agenda item 1.7

Word  

85340 bytes 2016-04-19 [36]  - Report on the April 2016 meeting of Working Party 7B with a view to its next meeting (October 2016)
 

Document :

ITU-R WP7B  Contribution  36

Title :

Report of the meeting of Working Party 7B (Geneva, 5-7 April 2016)

Date :

2016-04-08

Source :

Chairman, WP 7B

Access :

Restricted to TIES users [ITU-R]

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2020-12-16