International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP1B : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP1B  C 

ITU-R WP1B

Spectrum Management Methodologies and Economic Strategies

Results:117 total items.
Result page:  1 - 2 - 3  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 117 ]  
 
Reply liaison statement to CCT (copy for information to Study Group 6 and Working Parties 1B, 3J, 3K, 3M, 4A, 4B, 4C, 5A, 5B, 5C, 5D, 6A, 7B and 7C)     WP 7D     2023-10-19
[ 116 ]  
 
Liaison statement to Working Parties 1A, 1B, 1C, 4A, 4B, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D - Future Study Group 3 work plan for frequencies above 100 GHz     WP 3M     2023-06-09
[ 115 ]  
+Ann.1-7 
Report on the fifth 2019-2023 meeting of Working Party 1B (Thessaloniki, Greece, 29 May - 2 June 2023)     Chairman, WP 1B     2023-06-02
[ 114 ]  
 
Final list of participants - Working Party 1B (Thessaloniki, Greece, 29 May - 2 June 2023)     Director, BR     2023-06-02
[ 113 ]  
 
Liaison statement to the Coordination Committee for Terminology (CCT) (copy to Working Parties 1B, 4A, 4B, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D, and Study Group 1 for information) - Proposed revision of Recommendation ITU-R V.431-8     WPs 3J, 3K & 3M     2023-06-02
[ 112 ]  
 
Liaison statement to ITU-T Study Groups 16 and 20, ITU-R SG 1 and Working Parties 1B, 5A and 5D (copy to ITU-T SGs 2, 3, 5, 9, 13, and ITU-R WPs 1C, 4A, 5B, 5C, 6A, 7B) on question of mutual interest and implementation of the WTDC Resolution 9 (Rev. Kigali, 2022) for e-services including e-health and e-education     ITU-D SG2     2023-05-31
[ 111 ]  
 
List of documents issued (Documents 1B/80-1B/111)     BR, Study Groups Department     2023-05-30
[ 110 ]  
 
Liaison statement from ITU-D Study Group 1 Question 4/1 to ITU-R Study Group 1 and Working Party 1B on the questions of mutual interest and implementation of the WTDC Resolution 9 (Rev. Kigali, 2022)     ITU-D SG1     2023-05-23
[ 109 ]  
 
Proposed editorial revision of seven Recommendations assigned to ITU-R Working Party 1B     Chairman/Focal Point, SG 1 CG on editorial review     2023-05-23
[ 108 ]  
 
Proposed revision of Report ITU-R SM.2015-1 - Methods for determining national long-term strategies for spectrum utilization     United Arab Emirates     2023-05-22
[ 107 ]  
 
Proposed modification to the preliminary draft new Report ITU-R SM.[ASSESS-SPEC-EFFI-AND-ECON-VAL] - Assessment of Spectrum efficiency and economic value     India (Republic of)     2023-05-22
[ 106 ]  
 
Proposed modification to working document towards a preliminary draft new Report ITU-R SM.[SPEC-AVAILABILITY] - Methodologies for assessing or predicting spectrum availability     Korea (Republic of)     2023-05-19
[ 105 ]  
 
Proposed modification to the working document towards a preliminary draft new Report ITU-R SM.[GPR/WPR FREQ] - Spectrum management framework for the introduction of Ground- and Wall-Penetrating Radar (GPR/WPR) imaging systems     Korea (Republic of)     2023-05-19
[ 104 ]  
 
Liaison statement to Working Parties 1B, 4A, 4B, 4C, 6A, and 7C regarding revision of Resolution ITU-R 55     WP 5A     2023-05-19
[ 103 ]  
 
Reply liaison statement to CCT (copy to Working Parties 1B, 3J, 3K, 3M, 4A, 4B, 4C, 5B, 5C, 5D, 6A, 7A, 7B, 7C and 7D) - Revising Recommendation ITU-R V.431-8     WP 5A     2023-05-18
[ 102 ]  
 
Proposed modification to the working document towards a preliminary draft new Report ITU-R SM.[SPEC-AVAILABILITY] - [Methodologies for assessing or predicting spectrum availability]     China (People's Republic of)     2023-05-17
[ 101 ]  
 
Proposals on the modification to the preliminary draft new Report ITU-R SM.[ASSESS-SPEC-EFFI-AND-ECON-VAL] - Assessment of Spectrum efficiency and economic value     China (People's Republic of)     2023-05-17
[ 100 ]  
 
Liaison statement to ITU-R Working Parties - Revising Recommendation ITU-R V.431-8     CCT     2023-05-09
[ 99 ]  
 
Proposal for working document towards a preliminary draft revision of Report ITU-R SM.2012-6 - Economic aspects of spectrum management     Brazil (Federative Republic of)     2023-04-28
[ 98 ]  
 
WTDC Resolution 9 (Rev. Kigali, 2022) implementation ITU-R and ITU-D collaboration - Participation of countries, particularly developing countries, in spectrum management     Kenya (Republic of) , ATDI     2023-04-21
[ 97 ]  
 
Editorial revision of Recommendation ITU-R SM.1756-0 - Framework for the introduction of devices using ultra-wideband technology     United States of America     2023-04-21
[ 96 ]  
 
Editorial revision of Report ITU-R SM.2153-9 - Technical and operating parameters and spectrum use for short-range radiocommunication devices     United States of America     2023-04-21
[ 95 ]  
 
Editorial revision of Report ITU-R SM.2012-6 - Economic aspects of spectrum management     United States of America     2023-04-21
[ 94 ]  
 
Liaison statement on new ITU-T Focus Group on costing models for affordable data services (FG-CostingData)     ITU-T SG3     2023-03-15
[ 93 ]  
 
Liaison statement from ITU-D Study Group 2 Question 1/2 to ITU-T Study Groups 3, 5, 12, 13, 15, 16, 17, 20 FG-AI4A, ITU-R Study Groups 3, 4, 6, ITU-R Working Parties 1B, 5A, 5C, and 5D on new Question 1/2 and collaboration     ITU-D SG2     2022-12-20
[ 92 ]  
 
Liaison statement from ITU-D Study Group 1 Question 6/1 to ITU-R Study Group 1 and Working Party 1B on consumer information, protection and rights     ITU-D SG1     2022-12-20
[ 91 ]  
 
Liaison statement from ITU-D Study Group 1 Question 2/1 to ITU-R Study Group 1 on collaboration     ITU-D SG1     2022-12-20
[ 90 ]  
 
Liaison statement from ITU-D Study Group 1 Question 3/1 to all related Study Groups of ITU-T, all related Working Parties of ITU-R, APT and ETSI on disaster risk reduction and management     ITU-D SG1     2022-12-20
[ 89 ]  
(Rev.1) 
Reply liaison statement to Working Party 3M (copy to Working Parties 1A, 1B, 1C, 4A, 4B, 4C, 5A, 5B, 5D, 6A, 7B, and 7D for information) - Future development of P-series recommendations to address frequencies above 100 GHz     WP 5C     2022-12-01
[ 88 ]  
 
Reply liaison statement to Coordination Committee for Terminology (CCT) (copy to Study Groups 1, 3, 4, 6 and 7, as well as Working Parties 1B, 5A, 5D, 6A, 7C and 7D) - Symbols in Recommendation ITU-R V.431-8 inconsistent with the definitions of the SI units and adding a new symbol THF     WP 5C     2022-11-30
[ 87 ]  
 
Reply liaison statement to Coordination Committee for Terminology (CCT) (copy to Study Groups 1, 3, 4, 6 and 7, as well as Working Parties 1B, 5C, 5D, 6A, 7C and 7D) - Symbols in Recommendation ITU-R V.431-8 inconsistent with the definitions of the SI units and adding a new symbol to the Radio Regulations     WP 5A     2022-11-28
[ 86 ]  
 
Revising Recommendation ITU-R V.431-8 - Nomenclature: Number 12, THF 300 to 3 000 GHz, Terametric waves     ATDI   Q228/3   2022-11-21
[ 85 ]  
 
Adding symbol to the ninth ITU Radio Regulations band and revising Recommendation ITU-R V.431-8 - Nomenclature: Number 12, THF 300 to 3 000 GHz, Decimillimetric waves     ATDI   Q228/3   2022-11-02
[ 84 ]  
 
Reply liaison statement to Coordination Committee for Terminology (CCT) (copy to Study Groups 1, 3, 4, 6 and 7, as well as Working Parties 1B, 5A, 5C, 6A and 7D) - Symbols in Recommendation ITU-R V.431-8 inconsistent with the definitions of the SI units and adding a new symbol to the Radio Regulations     WP 5D     2022-10-28
[ 83 ]  
 
Reply liaison statement to Working Party 3M (copy to Working Parties 1A, 1B, 1C, 4A, 4B, 4C, 5A, 5B, 5C, 5D, 6A, 7B and 7D for information) - Future development of P-series Recommendations to address frequencies above 100 GHz     WP 7C     2022-10-07
[ 82 ]  
 
Reply liaison statement to Working Party 3M (copy to Working Parties 3J, 3K, 1A, 1B, 1C, 4A, 4B, 4C, 5A, 5B, 5C, 5D, 6A, 7B, and 7C - Extending the application of propagation Recommendations to frequencies greater than 100 GHz     WP 7D     2022-10-06
[ 81 ]  
 
Liaison statement to Working Party 3M (copy to Working Parties 1A, 1B, 1C, 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D) - Extending the application of propagation Recommendations to frequencies greater than 100 GHz     WP 4B     2022-09-19
[ 80 ]  
+Ann.1-4 
Report on the fourth 2019-2023 meeting of Working Party 1B (Geneva, 28 June - 7 July 2022)     Chairman, WP 1B     2022-07-06
[ 79 ]  
 
Final list of participants Working Party 1B (Geneva, 28 June - 7 July 2022)     Director, BR     2022-07-06
[ 78 ]  
 
Liaison statement to ITU-R Study Groups - Symbols in Recommendation ITU-R V.431-8 inconsistent with the definitions of the SI units and adding a new symbol to the Radio Regulations     CCT     2022-06-30
[ 77 ]  
 
List of documents issued (Documents 1B/64 - 1B/77)     BR, Study Groups Department     2022-06-28
[ 76 ]  
 
Proposed additional modifications to the preliminary draft revision of Report ITU-R SM.2153-8 - Technical and operating parameters and spectrum use for short-range radiocommunication devices     Brazil (Federative Republic of)     2022-06-21
[ 75 ]  
 
Proposed modification to the working document towards a preliminary draft new Report ITU-R SM.[SPEC-AVAILABILITY] - [Methodologies for assessing or predicting spectrum availability]     China (People's Republic of)     2022-06-21
[ 74 ]  
 
Proposed modification to the working document towards a preliminary draft new Report ITU-R SM.[ASSESS-SPEC-EFFI-AND-ECON-VAL]     China (People's Republic of)     2022-06-21
[ 73 ]  
 
Proposed working document towards a preliminary draft new Report ITU-R [SPECTRUM MANAGEMENT FRAMEWORK FOR THE INTRODUCTION OF GPR/WPR] - Spectrum management framework for the introduction of Ground- and Wall- Penetrating Radar (GPR/WPR) imaging systems     Korea (Republic of)     2022-06-20
[ 72 ]  
 
Proposed modification to working document towards a preliminary draft new Report ITU-R SM.[SPEC-AVAILABILITY] - Methodologies for assessing or predicting spectrum availability     Korea (Republic of)   Q241/1   2022-06-20
[ 71 ]  
 
Working document towards a preliminary draft revision of Recommendation ITU-R SM.1603-2 - Spectrum redeployment as a method of national spectrum management     United States of America     2022-06-16
[ 70 ]  
 
Liaison statement to Working Parties 1A, 1B, 1C, 4A, 4B, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D - Future development of P-series recommendations to address frequencies above 100 GHz     WP 3M     2022-06-14
[ 69 ]  
 
Liaison statement - Revision ETSI Report TR 103 181-3 - Summary worldwide UWB regulations     European Telecommunications Standards Institute     2022-06-01
[ 68 ]  
 
Liaison statement to Working Parties 1B, 4A, 4C, 5A, 5B, 5C, 5D, 6A, and 7D - Preliminary draft CPM text on WRC-23 agenda item 9.1, topic a)     WP 7C   AI9.1A)   2022-05-06
Results:117 total items.
Result page:  1 - 2 - 3  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2023-10-19