International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-R : WP5D : Contributions : 1555 Recently posted -  Search Meeting Documents
   
[1555]  Report on the 42nd meeting of Working Party 5D (Geneva, 10-21 October 2022)

Format

Size

Posted

English

Word  

972358 bytes 2023-02-03 [1555] Chapter 7 - General matters

Word  

34011 bytes 2022-11-08 [1555] Chapter 6 - Meeting Report of Ad Hoc Work Plan

Word  

45129 bytes 2022-11-11 [1555] Chapter 5 - Meeting Report of Working Group Technology Aspects

Word  

37689 bytes 2022-10-31 [1555] Chapter 5 - Annex 5.1 - Meeting Report of Sub-Working Group Evaluation

Word  

35674 bytes 2022-10-31 [1555] Chapter 5 - Annex 5.2 - Part 1

Word  

76674 bytes 2022-10-31 [1555] Chapter 5 - Annex 5.2 - Meeting Report of Sub-Working Group Radio Aspects

Word  

52108107 bytes 2022-11-01 [1555] Chapter 5 - Annex 5.3 - Draft working document towards a preliminary draft new Report ITU-R M.[IMT.ABOVE 100 GHz] - Technical feasibility of IMT in bands above 100 GHz    

Word  

2588331 bytes 2022-10-31 [1555] Chapter 5 - Annex 5.4 - Part 1

Word  

2607550 bytes 2022-10-31 [1555] Chapter 5 - Annex 5.4 - Liaison statement to ITU-D Study Group 1, Questions 1/1 and 5/1 - Terrestrial IMT for remote sparsely populated areas providing high data rate coverage

Word  

32991 bytes 2022-10-31 [1555] Chapter 5 - Annex 5.5 - Meeting Report of Sub-Working Group OOBE Working Party 5D #42

Word  

754187 bytes 2022-11-01 [1555] Chapter 5 - Annex 5.6 - Working document towards a preliminary draft revision of Recommendation ITU-R M.2070-1 - Generic unwanted emission characteristics of base stations using the terrestrial radio interfaces of IMT-Advanced

Word  

793698 bytes 2022-11-01 [1555] Chapter 5 - Annex 5.7 - Working document towards a preliminary draft revision of Recommendation ITU-R M.2071-1 - Generic unwanted emission characteristics of mobile stations using the terrestrial radio interfaces of IMT-Advanced

Word  

345938 bytes 2022-11-01 [1555] Chapter 5 - Annex 5.8 - Working document towards a preliminary draft new Recommendation ITU-R M.[IMT-2020.UNWANT.BS] for "generic unwanted emission characteristics of base stations using the terrestrial radio interface of IMT-2020"

Word  

247655 bytes 2022-11-01 [1555] Chapter 5 - Annex 5.9 - Working document towards a preliminary draft new Recommendation ITU-R M.[IMT-2020.UNWANT.MS] for "generic unwanted emission characteristics of mobile stations using the terrestrial radio interface of IMT-2020"

Word  

53370 bytes 2022-10-27 [1555] Chapter 4 - Meeting Report of Working Group Spectrum Aspects and WRC-23 Preparations

Word  

39103 bytes 2022-11-02 [1555] Chapter 4 - Annex 4.1 - Meeting Report of Sub-Working Group Sharing Studies

Word  

17368278 bytes 2022-11-02 [1555] Chapter 4 - Annex 4.2 - Working document towards a preliminary draft new Report ITU-R M.[IMT.AAS] - Measurements and mathematical modelling of Advanced Antenna Systems (AAS) in IMT-2020 systems

Word  

255921 bytes 2022-11-02 [1555] Chapter 4 - Annex 4.3 - Preliminary draft new Recommendation ITU-R M.[FSS_ES_IMT_26GHz] - Guidelines to assist administrations to mitigate interference from FSS earth stations into IMT stations operating in the frequency bands 24.65-25.25 GHz and 27-27.5 GHz

Word  

41649 bytes 2022-11-02 [1555] Chapter 4 - Annex 4.4 - Working document towards a preliminary draft new Recommendation ITU-R M.[FSS_ES_IMT_42/47GHz] - Guidelines to assist administrations to mitigate interference from FSS earth stations into IMT stations operating in the frequency bands 42.5-43.5 GHz and 47.2-48.2 GHz    

Word  

2178124 bytes 2022-11-02 [1555] Chapter 4 - Annex 4.5 - Working document toward a draft note to the Director of the Radiocommunication Bureau - [Verification of RR No. 21.5 for the notification of IMT stations operating in the frequency band 24.45-27.5 GHz which use an antenna that consists of an array of active elements Studies in reply to Document 2019-550 on the verification of RR No. 21.5 for the notification of IMT stations which use an array of active elements]

Word  

36317 bytes 2022-11-03 [1555] Chapter 4 - Annex 4.6 - Meeting Report of Sub-Working Group WRC-23 agenda item 1.1

Word  

90456 bytes 2022-10-21 [1555] Chapter 4 - Annex 4.7 - Draft CPM text for WRC-23 agenda item 1.1

Word  

38420 bytes 2022-10-21 [1555] Chapter 4 - Annex 4.7.1 - List of main abbreviations (and their meaning) used in the draft CPM text AI 1.1

Word  

41698 bytes 2022-10-21 [1555] Chapter 4 - Annex 4.7.2 - Reference List of ITU-R Resolutions, Recommendations and Reports, as well as other ITU and non-ITU publications, used in the draft CPM text AI 1.1

Word  

5740852 bytes 2022-10-25 [1555] Chapter 4 - Annex 4.8 - Supporting material for WRC-23 agenda item 1.1 - Technical and regulatory conditions for the protection of stations of the aeronautical mobile service (AMS) and maritime mobile service (MMS) located in international airspace or waters (i.e. outside national territories) and operating in the frequency band 4 800-4 990 MHz

Word  

33209 bytes 2022-11-02 [1555] Chapter 4 - Annex 4.9 - Meeting Report of Sub-Working Group on WRC-23 agenda item 1.2

Word  

184140 bytes 2022-10-21 [1555] Chapter 4 - Annex 4.10 - Draft CPM Text on WRC-23 agenda item 1.2

Word  

32794 bytes 2022-10-21 [1555] Chapter 4 - Annex 4.10.1 - List of the main abbreviations (and their meaning) used in the draft CPM text AI 1.2

Word  

41321 bytes 2022-10-21 [1555] Chapter 4 - Annex 4.10.2 - Reference list of ITU-R Resolutions, Recommendations and Reports, as well as other ITU and non-ITU publications, used in the draft CPM text for WRC-23 agenda item 1.2

Word  

43372 bytes 2022-11-02 [1555] Chapter 4 - Annex 4.11 - Working document on sharing and compatibility studies of IMT systems in the frequency band 3 300-3 800 MHz

Word  

5481816 bytes 2022-11-02 [1555] Chapter 4 - Annex 4.12 - Working document on sharing and compatibility studies of IMT systems in the frequency band 3 300-3 800 MHz - Attachment 1 - Sharing and compatibility of RLS and IMT operating in the frequency band 3 300-3 400 MHz

Word  

3801517 bytes 2022-11-02 [1555] Chapter 4 - Annex 4.13 - Working document on sharing and compatibility studies of IMT systems in the frequency band 3 300-3 800 MHz - Attachment 2 - Sharing and compatibility studies of fixed-satellite service and IMT operating in the frequency band 3 600-3 800 MHz

Word  

100877 bytes 2022-11-02 [1555] Chapter 4 - Annex 4.14 - Sharing and compatibility of FS and IMT operating in the frequency band 3 600-3 800 MHz Working document on sharing and compatibility studies of IMT systems in the frequency band 3 300-3 800 MHz - Attachment 3 - Sharing and compatibility of FS and IMT operating in the frequency band 3 600-3 800 MHz

Word  

36393 bytes 2022-11-02 [1555] Chapter 4 - Annex 4.15 - Working document on sharing and compatibility studies of IMT systems in the frequency bands 6 425-7 025 and 7 025-7 125 MHz - Main Part

Word  

5282193 bytes 2022-11-02 [1555] Chapter 4 - Annex 4.16 - Working document on sharing and compatibility studies of IMT systems in the frequency band 6 425-7 125 MHz - Attachment 1 - Sharing and compatibility of SRS operating in the frequency band 7 145-7 190 MHz and IMT operating in the frequency band 6 425-7 125 MHz

Word  

780772 bytes 2022-11-02 [1555] Chapter 4 - Annex 4.17 - Working document on sharing and compatibility studies of IMT systems in the frequency band 6 425-7 125 MHz - Attachment 2 - Sharing and compatibility of the SOS operating in the frequency band 7 100-7 155 MHz and IMT operating in the frequency band 6 425-7 125 MHz

Word  

11561757 bytes 2022-11-03 [1555] Chapter 4 - Annex 4.18 - Working document on sharing and compatibility studies of IMT systems in the frequency band 6 425-7 125 MHz - Attachment 3 - Sharing and compatibility of FS and IMT operating in the frequency band 6 425-7 125 MHz

Excel 2007  

683824 bytes 2022-11-03 [1555] Chapter 4 - Annex 4.19 - Part 1

Word  

34555581 bytes 2022-11-03 [1555] Chapter 4 - Annex 4.19 - Working document on sharing and compatibility studies of IMT systems in the frequency band 6 425-7 125 MHz - Attachment 4 - Sharing and compatibility of FSS (Earth-to-space) operating in the frequency band 6 425-7 075 MHz and IMT operating in the frequency band 6 425-7 125 MHz

Word  

31325961 bytes 2022-11-04 [1555] Chapter 4 - Annex 4.20 - Working document on sharing and compatibility studies of IMT systems in the frequency band 6 425-7 125 MHz - Attachment 5 - Sharing and compatibility of FSS (space-to-Earth) operating in the frequency band 6 700-7 075 MHz and IMT operating in the frequency band 6 425-7 125 MHz    

Word  

47417 bytes 2022-11-02 [1555] Chapter 4 - Annex 4.21 - Working document on sharing and compatibility studies of IMT systems in the frequency band 10-10.5 GHz in Region 2

Word  

33687208 bytes 2022-11-04 [1555] Chapter 4 - Annex 4.22 - Working document for sharing and compatibility studies of IMT systems in the frequency band 10-10.5 GHz in Region 2 - Attachment 1 - Sharing and compatibility of RLS and IMT operating in the frequency band 10-10.5 GHz

Word  

19900083 bytes 2022-11-03 [1555] Chapter 4 - Annex 4.23 - Working document for sharing and compatibility studies of IMT Systems in the frequency band 10-10.5 GHz in Region 2 - Attachment 2 - Sharing and compatibility of EESS (active) operating in the frequency band 10-10.4 GHz and IMT operating in the frequency band 10-10.5 GHz

Word  

8906523 bytes 2022-11-03 [1555] Chapter 4 - Annex 4.24 - Working document for sharing and compatibility studies of IMT systems in the frequency band 10-10.5 GHz in Region 2 - Attachment 3 - Sharing and compatibility of EESS (passive) operating in the band 10.6-10.7 GHz and IMT operating in the frequency band 10-10.5 GHz

Word  

1030064 bytes 2022-11-03 [1555] Chapter 4 - Annex 4.25 - Working document for sharing and compatibility studies of IMT systems in the frequency band 10-10.5 GHz in Region 2 - Attachment 4 - Sharing and compatibility of FS and IMT operating in the frequency band 10-10.5 GHz

Word  

1843671 bytes 2022-11-02 [1555] Chapter 4 - Annex 4.26 - Working document for sharing and compatibility studies of IMT systems in the frequency band 10-10.5 GHz in Region 2 - Attachment 5 - Compatibility of RAS and IMT operating in the frequency band 10-10.5 GHz

Word  

40337 bytes 2022-11-03 [1555] Chapter 4 - Annex 4.27 - Meeting Report of Sub-Working Group WRC-23 agenda item 1.4

Word  

201091 bytes 2022-10-21 [1555] Chapter 4 - Annex 4.28 - Draft CPM Text on WRC-23 agenda item 1.4

Word  

34870 bytes 2022-10-21 [1555] Chapter 4 - Annex 4.28.1 - List of the main abbreviations (and their meaning) used in the draft CPM text AI 1.4

Word  

41754 bytes 2022-10-21 [1555] Chapter 4 - Annex 4.28.2 - Reference list of ITU-R Resolutions, Recommendations and Reports, as well as other ITU and non-ITU publications, used in the draft CPM text for WRC-23 agenda item 1.4

Word  

2230924 bytes 2022-11-04 [1555] Chapter 4 - Annex 4.29 - Working document towards a preliminary draft new Report ITU-R M.[HIBS-CHARACTERISTICS] - Working document related to WRC-23 agenda item 1.4 - Spectrum needs, usage and deployment scenarios, and technical and operational characteristics for the use of high-altitude platform stations as IMT base stations (HIBS) in the mobile service in certain frequency bands below 2.7 GHz already identified for IMT

Word  

56022 bytes 2022-11-03 [1555] Chapter 4 - Annex 4.30 - Sharing and compatibility studies of high-altitude platform stations as IMT base stations (HIBS) on WRC-23 agenda item 1.4

Word  

231586 bytes 2022-11-04 [1555] Chapter 4 - Annex 4.31 - Overview table and summary of the sharing and compatibility studies for WRC-23 agenda item 1.4

Word  

11191004 bytes 2022-11-04 [1555] Chapter 4 - Annex 4.32 - Annex 1 - Sharing and compatibility studies of high-altitude platform stations as IMT base stations (HIBS) in the 694-960 MHz frequency range

Word  

7546527 bytes 2022-11-04 [1555] Chapter 4 - Annex 4.33 - Annex 2 - Sharing and compatibility studies of high-altitude platform stations as IMT base stations (HIBS) in the 1 710-1 885 MHz frequency range

Word  

4619692 bytes 2022-11-04 [1555] Chapter 4 - Annex 4.34 - Annex 3 - Sharing and compatibility studies of high-altitude platform stations as IMT base stations (HIBS) in 1 885-1 980 MHz, 2 010-2 025 MHz and 2 110-2 170 MHz frequency ranges

Word  

20918032 bytes 2022-11-04 [1555] Chapter 4 - Annex 4.35 - Annex 4 - Sharing and compatibility studies of high-altitude platform stations as IMT base stations (HIBS) in 2 500-2 690 MHz frequency range

Word  

31903 bytes 2022-11-03 [1555] Chapter 4 - Annex 4.36 - Meeting Report of Sub-Working Group Frequency Arrangements

Word  

1254817 bytes 2022-11-03 [1555] Chapter 4 - Annex 4.37 - [Preliminary] draft revision of Recommendation ITU-R M.1036-6 - Frequency arrangements for implementation of the terrestrial component of International Mobile Telecommunications in the bands identified for IMT in the Radio Regulations

Word  

36063 bytes 2022-11-01 [1555] Chapter 3 - Meeting Report of Working Group General Aspects

Word  

65823 bytes 2022-11-01 [1555] Chapter 3 - Annex 3.1 - Meeting Report of Sub-Working Group Specific Applications

Word  

9764475 bytes 2022-11-01 [1555] Chapter 3 - Annex 3.2 - Working document towards a preliminary draft new Report ITU-R M.[IMT.APPLICATIONS] - Applications of IMT for specific societal, industrial and enterprise usages

Word  

83222 bytes 2022-11-01 [1555] Chapter 3 - Annex 3.3 - Working document toward a preliminary draft new Report ITU-R M.[IMT.MULTIMEDIA] - Capabilities of the terrestrial component of IMT-2020 for multimedia communications

Word  

50748 bytes 2022-11-01 [1555] Chapter 3 - Annex 3.4 - Meeting Report of Sub-Working Group Vision

Word  

6698871 bytes 2022-10-28 [1555] Chapter 3 - Annex 3.5 - Working document towards a preliminary draft new Recommendation ITU-R M.[IMT.VISION 2030 AND BEYOND] - IMT Vision - Framework and overall objectives of the future development of IMT for 2030 and beyond

Word  

37819 bytes 2022-10-28 [1555] Chapter 3 - Annex 3.6 - Terms of Reference of Working Party 5D Correspondence Group (CG) on usage scenarios of Recommendation ITU-R M.[IMT.VISION 2030 AND BEYOND]

Word  

35098 bytes 2022-11-01 [1555] Chapter 3 - Annex 3.7 - Reply liaison statement to ITU-T Study Group 17 - Information on the security perspective within the vision for IMT for 2030 and beyond

Word  

36294 bytes 2022-11-01 [1555] Chapter 3 - Annex 3.8 - Report on the activities of Sub-Working Group RA-23 (ITU-R Resolutions, Questions and Opinions)

Word  

41849 bytes 2022-11-01 [1555] Chapter 3 - Annex 3.9 - Draft revision to Resolution ITU-R 56-2 - Naming for International Mobile Telecommunications

Word  

37305 bytes 2022-11-01 [1555] Chapter 3 - Annex 3.10 - Working document towards the revision of Resolution ITU-R 65 - Principles for the process of future development of IMT-2020 and IMT-2030

PowerPoint 2007  

48353 bytes 2022-11-08 [1555] Chapter 2 - Part 1

Word  

668550 bytes 2023-02-06 [1555] Chapter 2 - ITU-R Working Party 5D structure and work plan

Word  

68359 bytes 2022-11-08 [1555] Chapter 2 - Annex 2.21 - Chairmen's contact details

Word  

49283 bytes 2022-11-08 [1555] Chapter 2 - Annex 2.22 - Meeting schedule

Word  

43688 bytes 2022-11-08 [1555] Chapter 2 - Annex 2.23 - Anticipated overall deliverables / work plan of Working Party 5D

Word  

34046 bytes 2022-11-08 [1555] Chapter 2 - Annex 2.24 - Datailed work plans for individual deliverables

Word  

34232 bytes 2022-11-08 [1555] Chapter 2 - Annex 2.24.1 - Work plan for development of a preliminary draft new Report ITU-R M.[IMT.APPLICATIONS]

Word  

43392 bytes 2022-11-08 [1555] Chapter 2 - Annex 2.24.2 - Detailed work plan for Report ITU-R M.[IMT.MULTIMEDIA] - Capabilities of the terrestrial component of IMT-2020 for multimedia communications

Word  

36420 bytes 2022-11-08 [1555] Chapter 2 - Annex 2.24.3 - Detailed work plan for the development of preliminary draft new Recommendation ITU-R M.[IMT.VISION 2030 AND BEYOND]

Word  

35925 bytes 2022-11-08 [1555] Chapter 2 - Annex 2.24.4 - Detailed work plan for the review of existing ITU-R Resolutions, Questions and Opinion

Word  

33820 bytes 2022-11-08 [1555] Chapter 2 - Annex 2.24.5 - Detailed work plan for revision of Recommendation ITU-R M.1036-6   

Word  

44254 bytes 2022-11-08 [1555] Chapter 2 - Annex 2.24.6 - Detailed work plan on the technical measures to ensure coexistence between the MSS in the frequency band 1 518-1 525 MHz and IMT in the frequency band 1 492-1 518 MHz

Word  

44318 bytes 2022-11-08 [1555] Chapter 2 - Annex 2.24.7 - Detailed work plan for ITU-R Report on advanced antenna system (AAS) pattern for sharing studies between IMT-2020 systems and other services

Word  

44233 bytes 2022-11-08 [1555] Chapter 2 - Annex 2.24.8 - Detailed work plan for the studies requested by WRC-19 in Document 550

Word  

43086 bytes 2022-11-08 [1555] Chapter 2 - Annex 2.24.9 - Detailed work plan for methods to assist administrations to mitigate interference from FSS earth stations into IMT stations operating in the frequency bands 24.65-25.25 GHz and 27-27.5 GHz

Word  

42667 bytes 2022-11-08 [1555] Chapter 2 - Annex 2.24.10 - Detailed work plan on the development of technical guidance to administrations for ensuring coexistence between IMT and transmitting FSS earth stations in the frequency bands 42.5-43.5 GHz and 47.2-48.2 GHz

Word  

42610 bytes 2022-11-08 [1555] Chapter 2 - Annex 2.24.11 - Detailed work plan for a draft "revision after year 2021" of Recommendation ITU-R M.2150

Word  

38855 bytes 2022-11-08 [1555] Chapter 2 - Annex 2.24.12 - Detailed work plan for a draft revision 6 of Recommendation ITU-R M.2012-5

Word  

35520 bytes 2022-11-08 [1555] Chapter 2 - Annex 2.24.13 - Detailed work plan for the development of a preliminary draft new Report ITU-R M.[IMT.ABOVE 100GHz]

Word  

34883 bytes 2022-11-08 [1555] Chapter 2 - Annex 2.24.14 - Detailed work plan on revision for "generic unwanted emission characteristics of base / mobile stations using the terrestrial radio interfaces of IMT-Advanced and IMT-2020"

Word  

674124 bytes 2022-11-18 [1555] Chapter 1 - Chairman's Report 42nd meeting of Working Party 5D (10-21 October 2022)

Excel 2007  

35856 bytes 2022-12-14 [1555] Chapter 1 - Annex 1.1 Revision 1 - Index of Chapters and Annexes of the Report of Working Party 5D Meeting #42
 

Document :

ITU-R WP5D  Contribution  1555

Title :

Report on the 42nd meeting of Working Party 5D (Geneva, 10-21 October 2022)

Date :

2022-10-18

Source :

Chairman, WP 5D

Access :

Restricted to TIES users [ITU-R]

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2023-02-13