International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-R : R23-SG07 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R R23-SG07  C 

ITU-R R23-SG07

Science Services

Results:36 total items.
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 36 ]  
 
Liaison statement on the activities and studies on sustainable digital transformation     TSAG     2025-06-03
[ 35 ]  
 
Additional information on the summary of conclusions of the 32nd meeting of the Radiocommunication Advisory Group for the attention of all ITU-R Study Groups and Working Parties     Director, BR     2025-05-23
[ 34 ]  
 
Reply liaison statement to Working Parties 4B, 4C and 5A (copy for information to Study Groups 1, 5 and 7)     WP 4A     2025-05-20
[ 33 ]  
(Rev.1) 
Summary Report of actions taken during the meeting of Radiocommunication Study Group 7 (Geneva, 27 March 2025)     Chair, SG 7     2025-03-27
[ 32 ]  
 
Final list of participants - Study Group 7 (Geneva, 27 March 2025)     Director, BR     2025-03-27
[ 31 ]  
 
List of documents issued (Documents 7/11 - 7/31)     BR, Study Groups Department     2025-03-26
[ 30 ]  
 
Executive Report on the March 2024, September 2024, and March 2025 meetings of Working Party 7D (19-22 March 2024 Geneva, 17-25 September 2024 Almaty, 17-26 March 2025 Geneva)     Acting Chair, WP 7D     2025-03-26
[ 29 ]  
 
Executive Report of the meetings of Working Party 7C held since last Study Group 7 meeting     Acting Chair, WP 7C     2025-03-26
[ 28 ]  
 
Executive Report on the March 2024, September 2024 and March 2025 meetings of Working Party 7B     Acting Chair, WP 7B     2025-03-26
[ 27 ]  
 
Executive Report on September 2024 and March 2025 meetings of Working Party 7A     Acting Chair, WP 7A     2025-03-26
[ 26 ]  
 
Draft new Report ITU-R SA.[LUNAR.SRS STATIONS CHAR] - Technical and operational characteristics for space research systems in the vicinity of the Moon     WP 7B   AI1.15   2025-03-25
[ 25 ]  
(Rev.1) 
Draft revision of Recommendation ITU-R SA.2141-0 - Characteristics of space research service systems in the frequency range 14.8-15.35 GHz     WP 7B     2025-03-25
[ 24 ]  
(Rev.1) 
Draft new Recommendation ITU-R SA.[2 GHZ SOS CHAR] - Technical and operational characteristics of the space operation service (SOS) systems that use the 2 025-2 110 MHz (Earth-to-space) (space-to-space) and 2 200-2 290 MHz (space-to-Earth) (space-to-space) frequency bands to be used for assessing interference and for conducting sharing studies     WP 7B     2025-03-25
[ 23 ]  
 
Draft revision of Recommendation ITU-R RS.2105-2 - Typical technical and operational characteristics of Earth exploration-satellite service (active) systems using allocations between 432 MHz and 238 GHz     WP 7C   Q231/7   2025-03-24
[ 22 ]  
(Rev.1) 
Draft revision of Recommendation ITU-R RS.1166-5 - Performance and interference criteria for active spaceborne sensors     WP 7C   Q231/7   2025-03-24
[ 21 ]  
 
Draft revision of Report ITU-R RS.2489-0 - Technical and operational characteristics of ground-based passive sensors operating in the 51-58 GHz frequency range     WP 7C     2025-03-24
[ 20 ]  
 
Reply liaison statement to Working Party 4A (copied for information to Study Groups 4, 5 and 7) - Activities in response to Resolution 219 (Bucharest, 2022) and Resolution ITU-R 74 (RA-23)     WP 7B     2024-10-09
[ 19 ]  
 
Draft new report ITU-R RA.[RAS-IMT-COMPAT-43-GHZ] - Methodology for the coordination of IMT systems and stations of the radio astronomy service operating in the frequency band 42.5-43.5 GHz     WP 7D     2024-09-26
[ 18 ]  
 
Information on the preparation of texts for the draft CPM Report to WRC-27     Chair, CPM-27     2024-07-09
[ 17 ]  
 
Liaison statement on overview of work of FG-AI4A     FG-AI4A     2024-07-03
[ 16 ]  
 
Liaison statement on completion of FG-AI4A deliverables     FG-AI4A     2024-07-03
[ 15 ]  
 
Liaison statement to Study Groups 5 and 7 (copy to Study Group 1 for information) - Activities in response of Resolution 219 (Bucharest, 2022) and Resolution ITU-R 74     SG 4     2024-05-13
[ 14 ]  
 
Liaison statement to Radiocommunication Study Groups and Working Parties (copy for information to ITU-T and ITU-D Study Groups)     Chair, CCV     2024-04-22
[ 13 ]  
 
Draft new Report ITU-R RA.[HARMONICS] - Harmonics-related unwanted emissions in radio astronomy bands: measurement of impacts of harmonic emission at radio astronomy facilities     WP 7D     2024-04-02
[ 12 ]  
 
Draft revision of Report ITU-R RS.2310-1 - Worst-case interference levels from mainlobe-to-mainlobe antenna coupling of systems operating in the radiolocation service into active sensor receivers operating in the Earth exploration-satellite service (active) in the 35.5-36.0 GHz band     WP 7C     2024-03-25
[ 11 ]  
 
Summary Report of actions taken during the meeting of Radiocommunication Study Group 7 (Geneva, 18 March 2024)     Chair, SG 7     2024-03-18
[ 10 ]  
 
Final list of participants - Study Group 7 (Geneva, 18 March 2024)     Director, BR     2024-03-18
[ 9 ]  
 
List of documents issued (Documents 7/1 - 7/9)     BR, Study Groups Department     2024-03-15
[ 8 ]  
 
Relevant information from CPM27-1 in preparation for WRC-27     Chair, SG 7     2024-02-23
[ 7 ]  
 
Text from the Radiocommunication Assembly 2023 Plenary minutes on radio quiet zones     Director, BR     2024-02-16
[ 6 ]  
 
Text from WRC-23 Plenary for the attention of the ITU-R Working Parties that are either responsible for or contributing to studies relevant to items of the WRC-27 agenda or the WRC-31 preliminary agenda     Director, BR     2024-01-30
[ 5 ]  
(Rev.1) 
List of proposed Vice-Chairs of the Radiocommunication Study Groups and the CCV     Director, BR     2024-01-26
[ 4 ]  
 
Studies under Resolution 731 (WRC-23) - Consideration of sharing and adjacent-band compatibility between passive and active services above 71 GHz     Chairs, SGs 1, 5 & 7     2024-01-22
[ 3 ]  
 
Liaison statement on the activities and studies on sustainable digital transformation     ITU-T SG5     2023-12-21
[ 2 ]  
 
Documents to be carried over from the 2019-2023 study period     SG 7     2023-11-22
[ 1 ]  
(Rev.3) 
Assignment of texts to the Study Group 7 Sub-Groups     Chair, SG 7     2023-11-22
Results:36 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2025-06-04