International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-R : R23-WP1C : Meeting 2025-06-09 : Temporary Documents  Recently posted -  Search Meeting Documents
   
ITU-R R23-WP1C  TD (2025-06-09) 

ITU-R R23-WP1C

Spectrum Monitoring

Meeting  from 2025-06-09 to 2025-06-18

held in Switzerland [Geneva]

Results:23 total items.
Temporary Documents  Documents / Contributions
 
Number 
Title Source Date
[ 40 ]  
 
Draft revision 2 to the Terms of Reference of the Working Party 1C Rapporteur Group on developing a new edition of the ITU Handbook on Spectrum Monitoring     WG 1C-2 (issue 2bToR)   2025-06-18
[ 39 ]  
 
Draft revision of the work plan for the development of the Spectrum Monitoring Handbook     WG 1C-2   2025-06-18
[ 38 ]  
 
Working document towards a preliminary draft revision of Chapter 6 of the Spectrum Monitoring Handbook - Fundamentals and supporting tools     WG 1C-2 (issue 2b6)   2025-06-18
[ 37 ]  
 
Working document towards a preliminary draft revision of Chapter 5.7 of the Spectrum Monitoring Handbook - Radio noise measurements     WG 1C-2 (issue 2b5.7)   2025-06-18
[ 36 ]  
 
Working document towards a preliminary draft revision of Chapter 3 of the Spectrum Monitoring Handbook - Monitoring stations and equipment     WG 1C-2 (issue 2b3)   2025-06-18
[ 35 ]  
 
Working document towards a preliminary draft revision of Chapter 4 of the Spectrum Monitoring Handbook - Chapter 4 - Measurements     WG 1C-2   2025-06-17
[ 34 ]  
 
Working document towards a preliminary draft new Chapter of the Handbook on Spectrum Monitoring - Data and Automation - New Chapter 3bis     WG 1C-2 (issue 2b3bis)   2025-06-17
[ 33 ]  
 
Preliminary draft revision of Recommendation ITU-R SM.1880-2 - Spectrum occupancy measurement and evaluation     WG 1C-1 (issue 1b1)   2025-06-17
[ 32 ]  
(Rev.1) 
[Working document towards a] preliminary draft Recommendation ITU-R SM.443-4 - Bandwidth measurement at monitoring stations     WG 1C-1 (issue c)   2025-06-17
[ 31 ]  
 
Working document towards a preliminary draft new Report ITU-R SM.[TRP_MEAS] - Estimation of Total Radiated Power (TRP) in the field     WG 1C-1 (issue 1a)   2025-06-17
[ 30 ]  
 
Working document towards a preliminary draft revision of Chapter 5.6 of the Spectrum Monitoring Handbook - Measurements of Non-ionizing emissions     WG 1C-2 (issue 2b5.6)   2025-06-17
[ 29 ]  
 
Working document towards a preliminary draft revision of Chapter 5.5 of the Spectrum Monitoring Handbook - Monitoring of radar emissions     WG 1C-2 (issue 2b5.5)   2025-06-17
[ 28 ]  
 
[Draft] liaison statement to Working Party 6A - Monitoring of Broadcast Emissions     WG 1C-2 (issue 2b5.2)   2025-06-17
[ 27 ]  
 
Working document towards a preliminary draft revision of Chapter 5.2 of the Spectrum Monitoring Handbook - Broadcast monitoring     WG 1C-2 (issue 2b5.2)   2025-06-17
[ 26 ]  
 
[Working document towards a] preliminary draft revision of Report ITU-R SM.2542-0 - Next generation spectrum monitoring - proactive, autonomous and data-driven     WG 1C-1 (issue 1g)   2025-06-17
[ 25 ]  
 
Working document towards a preliminary draft revision of Chapter 1 of the Spectrum Monitoring Handbook - Spectrum monitoring as a key function of a spectrum management system     WG 1C-2 (issue 1b1)   2025-06-16
[ 24 ]  
 
Reply liaison statement to ITU-T Study Group 2 (Copy to xxx for information) - Request for Input on Quality of Service (QoS) and Electromagnetic Fields (EMF) in the Context of Indoor Coverage Technologies     WP 1C   2025-06-16
[ 23 ]  
 
Reply liaison statement to ITU-R Working Party 5D (copy to ITU-T Study Group 5 for information) - Determination and mitigation of electromagnetic compatibility issues for 5G TDD network under tropospheric duct effect     WP 1C   2025-06-13
[ 22 ]  
 
Working document towards a preliminary draft revision of Annex 1 of the ITU Handbook on Spectrum Monitoring - Monitoring system planning and tenders     WG 1C-2   2025-06-13
[ 21 ]  
 
Working document towards a preliminary draft revision of Chapter 5.1 of the Spectrum Monitoring Handbook - Monitoring of spacecraft emissions     WG 1C-2 (issue 2b5.1)   2025-06-13
[ 20 ]  
(Rev.1) 
Working document towards a preliminary draft revision of Chapter 5.3 of the spectrum monitoring Handbook - Monitoring of cellular systems     WG 1C-2 (issue 2b5.3)   2025-06-12
[ 19 ]  
 
[Working document towards a] Preliminary draft revision of Chapter 5.4 of the spectrum monitoring Handbook - Microwave links and satellite up-links     WG 1C-2 (Issue 2b5.4)   2025-06-11
[ 18 ]  
 
Working document towards a preliminary draft revision of Chapter 2 of the Spectrum Monitoring Handbook - Organization, physical structures, and personnel     WG 1C2 (issue 2b2)   2025-06-10
Results:23 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2025-06-18