Contribuciones |
|
Número
|
Título
|
Origen
|
AI/Cuestión
|
Fecha
|
|
[ 240 ]
|
Reply liaison statement to Working Party 4A (copy to Working Party 5B) - Characteristics of space research service systems operating in the 13.75-14.0 GHz band
|
WP 7B
|
AI1.2
|
2024-10-08 |
|
[ 239 ]
|
Elements of working document relating to WRC-27 agenda item 1.1 - Use of frequency bands 47.2-50.2 GHz and 50.4-51.4 GHz (Earth-to-space) by aeronautical and maritime earth stations in motion in the fixed-satellite service
|
United States
|
AI1.1
|
2024-10-08 |
|
[ 238 ]
|
Proposed updates to working document - Elements on mitigation measures between FSS and IMT in the frequency band 3 400-3 600 MHz
|
United States
|
|
2024-10-08 |
|
[ 237 ]
|
Working document towards a preliminary draft new Report ITU-R S.[INTERFERENCE-NGSO-NGSO/GSO-STUDIES]
|
United States
|
|
2024-10-08 |
|
[ 236 ]
|
Reply liaison statement to Working Party 7C and 7D on WRC-27 agenda item 1.18
|
United States
|
AI1.18
|
2024-10-08 |
|
[ 235 ]
|
Reply liaison statement to Working Party 5C agenda item 1.10
|
United States
|
AI1.10
|
2024-10-08 |
|
[ 234 ]
|
Proposed revisions to the working document towards preliminary draft new Recommendation/Report ITU-R S. Recommendation ITU-R S. [INTERFERENCE-NGSO-GSO]
|
United States
|
|
2024-10-08 |
|
[ 233 ]
|
Working document towards a preliminary draft revision of recommendations ITU-R S.1428-1 and BO.1443 - Reference FSS and BSS earth-station radiation patterns for use in interference assessment involving non-GSO satellites in frequency bands between 10.7 GHz and 30 GHz
|
United States
|
|
2024-10-08 |
|
[ 232 ]
|
Possible measures to enhance protection and sustainable development of broadcasting-satellite service in Regions 1 and 3 Plan band
|
United States
|
|
2024-10-08 |
|
[ 231 ]
|
Studies to support the next revision of Recommendation ITU-R S.1503-4
|
United States
|
|
2024-10-08 |
|
[ 230 ]
|
Draft reply liaison statement to working party 7C - Technical and operational characteristics of FSS systems for sharing and compatibility studies on WRC-27 agenda item 1.19
|
United States
|
AI1.19
|
2024-10-08 |
|
[ 229 ]
|
Working document towards a preliminary draft new Recommendation ITU-R S.[AGGREGATE EPFD KA KU] - Study of Non-GSO Constellation Pointing Avoidance for Accurate Calculation of Aggregate Downlink Epfd
|
United States
|
|
2024-10-08 |
|
[ 228 ]
|
Draft liaison statement to Working Party 7D - WRC-27 agenda item 1.16
|
United States
|
AI1.16
|
2024-10-08 |
|
[ 227 ]
|
Working document regarding consideration of possible measures to address the case of "satellite hopping without moving" described in the RRB's report to WRC-23
|
United States
|
|
2024-10-08 |
|
[ 226 ]
|
Proposed revisions to working document on WRC-27 agenda item 1.2 - Operational and technical limitations for FSS earth stations in the frequency band 13.75-14 GHz (Earth-to-space)
|
United States
|
|
2024-10-08 |
|
[ 225 ]
|
FSS system characteristics relevant to WRC-27 agenda item 1.7 studies
|
United States
|
AI1.7
|
2024-10-08 |
|
[ 224 ]
|
Proposed updates to working document towards a preliminary draft revision of Recommendation ITU-R S.1503 - Functional description to be used in developing software tools for determining conformity of non-geostationary-satellite orbit fixed-satellite service systems or networks with limits contained in Article 22 of the Radio Regulations
|
United States
|
|
2024-10-08 |
|
[ 223 ]
|
Sharing and compatibility study of FSS systems with SRS operating in the 13.75-14 GHz frequency range
|
Ghana
|
AI1.2
|
2024-10-07 |
|
[ 222 ]
|
Sharing and compatibility study of FSS systems with RLS operating in the 13.75-14 GHz frequency range
|
Ghana
|
|
2024-10-07 |
|
[ 221 ]
|
Statistics and information on FSS networks in Region 2 sharing the 11.7-12.2 GHz frequency band with the BSS plan in Regions 1 and 3
|
Director, BR
|
|
2024-10-08 |
|
[ 220 ]
|
Issues from report of the Director to WRC-23 relevant to Appendices 30, 30A and 30B of the Radio Regulations
|
Director, BR
|
|
2024-10-08 |
|
[ 219 ]
|
Proposal for working document towards draft CPM text for WRC-27 agenda item 1.5
|
Asia Satellite Telecommunications Co. Ltd. (AsiaSat)
|
AI1.5
|
2024-10-07 |
|
[ 218 ]
|
ITU role in ensuring long-term sustainability of outer space activities
|
Russian Federation
|
|
2024-10-07 |
|
[ 217 ]
|
Proposals for WRC-27 agenda item 1.4
|
Asia Satellite Telecommunications Co. Ltd. (AsiaSat)
|
AI1.4
|
2024-10-07 |
|
[ 216 ]
|
Contribution to Working Party 4A on WRC-27 agenda item 1.5
|
Iran (Islamic Republic of)
|
AI1.5
|
2024-10-06 |
|
[ 215 ]
|
Proposals to working document towards a preliminary draft new Recommendation ITU-R S.[NON-GSO-MODELING]
|
Russian Federation
|
|
2024-10-04 |
|
[ 214 ]
|
FSS protection criteria for sharing studies under WRC-27 agenda item 1.7
|
Russian Federation
|
AI1.7
|
2024-10-04 |
|
[ 213 ]
|
Proposals to include a new topic under WRC-27 agenda item 7: "potential measures to govern application of RR No. 4.4"
|
Russian Federation
|
AI7
|
2024-10-04 |
|
[ 212 ]
|
Proposed modifications to the working document towards draft CPM text for WRC-27 agenda item 1.5
|
Russian Federation
|
AI1.5
|
2024-10-04 |
|
[ 211 ]
|
Proposed modifications to the elements on a working document related to the operation and functionalities of NCMC for ESIMS on WRC-27 agenda item 1.1
|
Russian Federation
|
AI1.1
|
2024-10-04 |
|
[ 210 ]
|
Proposed modifications of the elements to working document towards preliminary draft new Report ITU-R on WRC-27 agenda item 1.1 - Use of frequency bands 47.2-50.2 GHz and 50.4-51.4 GHz (Earth-to-space) by aeronautical and maritime earth stations in motion in the fixed-satellite service
|
Russian Federation
|
AI1.1
|
2024-10-04 |
|
[ 209 ]
|
GSOA code of conduct on industry space sustainability practices
|
Global Satellite Operators' Association GSOA
|
|
2024-10-03 |
|
[ 208 ]
|
Elements on a working document related to the operation and functionalities of NCMC for ESIMS - The functionalities and implementation of a network control and monitoring center for Earth stations in motion
|
Telesat
|
|
2024-10-02 |
|
[ 207 ]
|
Liaison statement to Working Party 5B (copy to Working Parties 3J, 3K, 3M, 4A, 4C, 5A, 5C and 7D for information) - Additional information on passive sensors in the EESS for WRC-27 agenda item 1.8
|
WP 7C
|
AI1.8
|
2024-10-01 |
|
[ 206 ]
|
Reply liaison statement to Working Party 4A regarding WRC-27 agenda item 1.4
|
WP 7C
|
AI1.4
|
2024-10-01 |
|
[ 205 ]
|
SKAO's views on WRC-27 agenda item 1.16
|
Square Kilometre Array Observatory (SKAO)
|
AI1.16
|
2024-09-28 |
|
[ 204 ]
|
Reply liaison statement to ITU-R Working Party 3J (copied for information to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 7A, 7C and 7D) - Response to Working Party 3J questions related to WRC-27 agenda item 1.15
|
WP 7B
|
AI1.15
|
2024-09-30 |
|
[ 203 ]
|
Liaison statement to Working Parties 3J, 4A, 4C, 5A, 5B, 5C, 5D, 7A, 7C and 7D - Report on progress of activities relating to WRC-27 agenda item 1.15
|
WP 7B
|
AI1.15
|
2024-09-30 |
|
[ 202 ]
|
Reply liaison statement to Working Party 4A - Relevant technical information to support studies under WRC-27 agenda item 1.16 documenting FSS characteristics in some frequency bands
|
WP 7D
|
AI1.16
|
2024-09-30 |
|
[ 201 ]
|
Reply liaison statement to Working Party 4A (copy to Working Parties 5A, 5C and 7C for information) - WRC-27 agenda item 1.3
|
WP 7D
|
AI1.3
|
2024-09-30 |
|
[ 200 ]
|
Reply liaison statement to Working Party 5D (copy to Working Parties 3K, 3M, 4A, 4C, 5A, 5B, 5C, 7B and 7C for information) - Relevant technical information to support studies under WRC-27 agenda item 1.7
|
WP 7D
|
AI1.7
|
2024-09-30 |
|
[ 199 ]
|
Reply liaison statement to Working Party 5D on WRC-27 agenda item 1.7 (copy to Working Parties 3K, 3M, 4A, 4C, 5A, 5B, 5C, 7C and 7D)
|
WP 7B
|
AI1.7
|
2024-09-30 |
|
[ 198 ]
|
Reply liaison statement to Working Party 5C (copy to Working Parties 4A, 4B, 4C, 5A, 5B, 6A and 7C for information) - Studies under WRC-27 agenda item 1.10
|
WP 7D
|
AI1.10
|
2024-09-30 |
|
[ 197 ]
|
Reply liaison statement to Working Party 7B (copy for information to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 7A and 7C) - Relevant technical information to support studies under WRC-27 agenda item 1.15
|
WP 7D
|
AI1.15
|
2024-09-30 |
|
[ 196 ]
|
Working document towards a preliminary draft new Recommendation ITU-R S.[INTERFERENCE-NGSO-[NGSO/GSO]]
|
China
|
|
2024-09-27 |
|
[ 195 ]
|
Working document towards a preliminary draft Revision of Recommendation ITU-R S.1526-1 - Methodology to assess the interference environment in relation to Nos. 9.12, 9.12A and 9.13 of the Radio Regulations when non-geostationary-satellite orbit fixed-satellite service systems are involved
|
China
|
|
2024-09-27 |
|
[ 194 ]
|
Proposal on the studies under WRC-27 agenda item 1.2
|
China
|
AI1.2
|
2024-09-27 |
|
[ 193 ]
|
Proposal of study item related to Resolution 40 (Rev.WRC-19) for WRC-27 agenda item 7
|
China
|
AI7
|
2024-09-27 |
|
[ 192 ]
|
Proposal on characteristics of BSS and FSS which may be used in sharing and compatibility studies under WRC-27 agenda items 1.4
|
China
|
AI1.4
|
2024-09-27 |
|
[ 191 ]
|
Working document towards a preliminary draft new Report ITU-R S.[INTERFERENCE-NGSO-NGSO/GSO-STUDIES] - A study on different options for calculating rain attenuation in non-GSO-non-GSO interference assessment
|
China
|
|
2024-09-27 |
Resultados :240 documentos Resultados :
1 -
2 -
3 -
4 -
5
- Siguiente
|
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):