International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-R : R23-WP7B : Meeting 2024-09-18 : Temporary Documents  Recently posted -  Search Meeting Documents
   
ITU-R R23-WP7B  TD (2024-09-18) 

ITU-R R23-WP7B

Space Radiocommunication Applications

Meeting  from 2024-09-18 to 2024-09-27

held in Almaty (Kazakhstan)

Results:29 total items.
Temporary Documents  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 43 ]  
 
Reply liaison statement to Working Party 5D on WRC-27 agenda item 1.7 (copy to Working Parties 1B, 3K, 3M, 4A, 4C, 5A, 5B, 5C, 7C and 7D)     SWG 7B-1   AI1.7   2024-09-26
[ 42 ]  
 
Reply liaison statement to ITU-R Working Party 4A (copied for information to Study Groups 4, 5 and 7) - Activities in response to Resolution 219 (Bucharest, 2022) and Resolution ITU-R 74 (RA-23)     WP 7B     2024-09-26
[ 41 ]  
 
Reply liaison statement to Working Party 4C on WRC-27 agenda items 1.12, 1.13, 1.14 and 1.15     SWG 7B-3   AI1.15, AI1.14, AI1.13, AI 1.12   2024-09-25
[ 40 ]  
 
Annex XX to Working Party 7B Chair's Report - Preliminary draft new Report ITU-R SA.[LUNAR.SRS STATIONS CHAR] - Technical and operational characteristics for space research systems in the vicinity of the Moon     SWG 7B-2   AI1.15   2024-09-26
[ 39 ]  
(Rev.1) 
Proposed reply liaison statement to Working Party 4A regarding WRC-27 agenda item 1.6     SWG 7B-1   AI1.6   2024-09-25
[ 38 ]  
 
Draft liaison statement to Working Party 5D regarding WRC-27 agenda item 1.7 - Technical information to support studies under WRC-27 agenda item 1.7     SWG 7B-2   AI1.7, AI1.15   2024-09-25
[ 37 ]  
 
Draft revision of the Handbook on Space research communication (2014)     SWG 7B-2     2024-09-25
[ 36 ]  
 
Draft reply liaison statement to Working Party 5D - Possible coordination of space research service (deep space) stations operating in the band 7 145-7 190 MHz with IMT stations operating in the band 6 425-7 125 MHz     SWG 7B-2     2024-09-24
[ 35 ]  
(Rev.1) 
Annex XX to Working Party 7B Chair's Report - Revised work plan for WRC-27 agenda item 1.15 and Resolution 680 (WRC-23)     SWG 7B-2   AI1.15   2024-09-24
[ 34 ]  
 
Working document towards a preliminary draft new Report ITU-R SA.[EESS NGS 7-8GHZ] - Evolution of Earth exploration-satellite service systems in the frequency range 7 190 to 8 400 MHz     SWG 7B-3     2024-09-24
[ 33 ]  
 
Preliminary draft new Recommendation ITU-R SA.[2 GHZ SOS CHAR] - Technical and operational characteristics of the space operation service (SOS) systems that use the 2 025-2 110 MHz (Earth-to-space) (space-to-space) and 2 200-2 290 MHz (space-to-Earth) (space-to-space) frequency bands to be used for assessing interference and for conducting sharing studies     SWG 7B-1     2024-09-25
[ 32 ]  
 
This document has been withdrawn     N/A     2024-09-25
[ 31 ]  
 
Draft liaison statement to ITU-R Working Parties 1B, 3J, 4A, 4C, 5A, 5B, 5C, 5D, 7A, 7C and 7D - Report on progress of activities relating to WRC-27 agenda item 1.15     SWG 7B-2   AI1.15   2024-09-25
[ 30 ]  
 
Annex XX to Working Party 7B Chair's Report - Working document towards a preliminary draft new Report ITU-R SA.[LUNAR 1.15 STUDIES] - Sharing studies of space research systems for lunar operations under WRC-27 agenda item 1.15     SWG 7B-2   AI1.15   2024-09-24
[ 29 ]  
 
Working document towards representative characteristics and concepts of operation for Lunar SRS     WP 7B     2024-09-25
[ 28 ]  
 
Liaison statement to Working Party 7C on WRC-27 agenda item 1.19     SWG 7B-3   AI1.19   2024-09-25
[ 27 ]  
 
[Preliminary draft new Recommendation ITU-R SA.[2.0 GHZ SRS & EESS CHAR] - Technical and operational characteristics of the space research service and Earth exploration-satellite service systems in the 2 025-2 120 MHz frequency band to be used for assessing interference and for conducting sharing and compatibility studies     SWG 7B-3     2024-09-24
[ 26 ]  
 
Working document toward a preliminary draft Revision of Recommendation ITU-R SA.514-3 - Interference and sharing criteria for command and data transmission systems operating in the Earth exploration-satellite and meteorological-satellite services     WP 7B     2024-09-24
[ 25 ]  
 
Working document toward a preliminary draft revision of Report ITU-R SA.2488-0 - Characteristics to be used for assessing interference to systems operating in the Earth exploration-satellite and meteorological-satellite services, and for conducting sharing and compatibility studies     SWG 7B-3     2024-09-25
[ 24 ]  
 
Draft reply liaison statement to ITU-R Working Party 4C regarding WRC-27 agenda item 1.11 - Technical information to support studies under WRC-27 agenda item 1.11     SWG 7B-2   AI1.11   2024-09-24
[ 23 ]  
 
Reply liaison statement to ITU-R Working Party 4A (copied for information to Study Groups 4, 5 and 7) - Activities in response of Resolution 219 (Bucharest, 2022) and Resolution ITU-R 74 (RA-23)     WP 7B     2024-09-23
[ 22 ]  
 
Note to Acting Chair Working Party 7B - Interim Report on SWG 7B-2 Discussion of Document 7B/81     Chair, SWG 7B-2   AI1.7, AI1.15   2024-09-23
[ 21 ]  
(Rev.1) 
Liaison statement to Working Party 7C on WRC-27 agenda item 1.17     SWG 7B-3   AI1.17   2024-09-21
[ 20 ]  
 
Reply liaison statement to Working Party 4C regarding WRC-27 agenda item 1.15 - Technical information to support studies under WRC-27 agenda item 1.15     SWG 7B-2   AI1.15   2024-09-21
[ 19 ]  
 
Reply liaison statement t- o ITU-R Working Party 3J (copied for information to Working Parties 1B, 4A, 4C, 5A, 5B, 5C, 5D, 7A, 7C and 7D) - Response to Working Party 3J questions related to WRC-27 agenda item 1.15     SWG 7B-2   AI1.15   2024-09-21
[ 18 ]  
 
Preliminary draft revision of Recommendation ITU-R SA.2141-0 - Characteristics of space research service systems in the frequency range 14.8-15.35 GHz     SWG 7B-1     2024-09-20
[ 17 ]  
(Rev.1) 
Draft reply liaison statement to Working Party 4A - Characteristics of space research service systems operating in the 13.75-14.0 GHz band     SWG 7B-1   AI1.2   2024-09-20
[ 16 ]  
 
Proposed reply liaison statement to Working Party 4A regarding WRC-27 agenda item 1.1     SWG 7B-1   AI1.1   2024-09-20
[ 15 ]  
 
Elements for a possible revision of Recommendation ITU-R SA.1743     SWG 7B-1     2024-09-20
Results:29 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2024-09-26