International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-R : R23-WP7B : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R R23-WP7B  C 

ITU-R R23-WP7B

Space Radiocommunication Applications

Results:189 total items.
Result page:  1 - 2 - 3 - 4  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 189 ]  
 
Proposed modifications to the working document towards a draft new Report ITU-R SA.[EESS NGS 7-8GHZ] - Evolution of Earth exploration-satellite service systems in the frequency range 7 190 to 8 400 MHz     Germany , France     2025-09-04
[ 188 ]  
 
Potential interference to COSPAS-SARSAT from lunar communications     Canada   AI1.15   2025-09-04
[ 187 ]  
 
Preliminary draft new Recommendation ITU-R SA.[2.0 GHZ SRS & EESS CHAR] - Technical and operational characteristics of the space research service and Earth exploration-satellite service systems in the 2 025-2 120 MHz frequency band to be used for assessing interference and for conducting sharing and compatibility studies     Canada     2025-09-04
[ 186 ]  
 
Draft reply liaison statement to Working Party 5D - Coordination between space research service (deep space) stations operating in the band 7 145-7 190 MHz and IMT stations operating in the band 6 425-7 125 MHz     United States     2025-09-03
[ 185 ]  
 
Draft reply liaison statement to Working Party 4A - WRC-27 agenda item 1.2 - Characteristics of space research service systems operating in the 13.75-14.0 GHz band     United States   AI1.2   2025-09-03
[ 184 ]  
 
Draft new Recommendation ITU-R SA.[2.0 GHz SRS & EESS CHAR] - Technical and operational characteristics of the space research service and Earth exploration-satellite service systems in the 2 025-2 120 MHz frequency band to be used for assessing interference and for conducting sharing and compatibility studies     United States     2025-09-03
[ 183 ]  
 
Working document towards a preliminary draft new Report ITU-R SA.[LUNAR 1.15 STUDIES] - Sharing studies of space research systems for lunar operations under WRC-27 agenda item 1.15     United States   AI1.15   2025-09-03
[ 182 ]  
 
Working document towards preliminary draft CPM text for WRC-27 agenda item 1.15     United States   AI1.15   2025-09-03
[ 181 ]  
 
Preliminary calculation of interference from lunar surface SRS to DC-MSS-IMT in frequency bands overlapped by WRC-27 agenda items 1.13 and 1.15     United States   AI1.15, AI1.13   2025-09-03
[ 180 ]  
 
Preliminary calculation of interference from lunar surface SRS to MSS (space-to-space) in frequency bands overlapped by WRC-27 agenda items 1.15 and 1.11     United States   AI1.15, AI1.11   2025-09-03
[ 179 ]  
 
Working document toward preliminary draft new Report ITU-R SA.[Future lunar communication and systems study] - Radiocommunication needs for future lunar vicinity activities beyond space research and consideration of associated radiocommunication services and sufficiency of existing regulatory provisions     United States     2025-09-03
[ 178 ]  
 
Proposed modification to the working document towards a preliminary draft new Report ITU-R SA.[LUNAR 1.15 STUDIES] - Sharing studies of space research systems for lunar operations under WRC-27 agenda item 1.15     Korea (Rep. of)   AI1.15   2025-09-04
[ 177 ]  
 
Working document in support of possible ITU-R SA.[EESS-DOWNLINKS-37.5 TO 52.4 GHZ] - Potential future EESS (space-to-Earth) in the frequency range [37.5-52.4 GHz]     European Space Agency (ESA)     2025-09-03
[ 176 ]  
 
Working document in support of possible Report ITU-R SA.[EESSUPLINKS-23GHZ] - Potential future EESS (Earth-to-space) in the 22.55-23.15 GHz band     European Space Agency (ESA)     2025-09-03
[ 175 ]  
 
Proposed changes to working document towards a preliminary draft new Report ITU-R SA.[LUNAR 1.15 STUDIES] - Sharing studies of space research systems for lunar operations under WRC-27 agenda item 1.15     Germany   AI1.15   2025-09-03
[ 174 ]  
 
Proposal for update on the draft revision of the Handbook on space research communication     Japan     2025-09-03
[ 173 ]  
 
Proposed liaison statement to Working Party 4C concerning WRC-27 agenda item 1.13     Japan   AI1.13   2025-09-03
[ 172 ]  
 
Proposal for update on working document towards a preliminary draft revision of Report ITU-R SA.2488-0 - Characteristics to be used for assessing interference to systems operating in the Earth exploration-satellite and meteorological-satellite services, and for conducting sharing and compatibility studies     Japan     2025-09-03
[ 171 ]  
 
Proposed modification to preliminary draft new Recommendation ITU-R SA.[2.0 GHZ SRS & EESS CHAR] - Technical and operational characteristics of the space research service and Earth exploration-satellite service systems in the 2 025-2 120 MHz frequency band to be used for assessing interference and for conducting sharing and compatibility studies     Japan     2025-09-03
[ 170 ]  
 
Proposals for working document towards a preliminary draft new Report ITU-R SA.[LUNAR 1.15 STUDIES]     Russian Federation   AI1.15   2025-09-02
[ 169 ]  
 
Proposals for draft reply liaison statement to Working Party 5D - Coordination between space research service (deep space) stations operating in the band 7 145-7 190 MHz and IMT stations operating in the band 6 425-7 125 MHz     Russian Federation     2025-09-02
[ 168 ]  
 
Proposed modification to working document towards a preliminary draft new Report ITU-R SA.[LUNAR 1.15 STUDIES] - Sharing studies of space research systems for lunar operations under WRC-27 agenda item 1.15     China   AI1.15   2025-09-02
[ 167 ]  
 
Preliminary draft new Recommendation ITU-R SA.[2 GHz SRS & EESS CHAR] - Technical and operational characteristics of the space research service (SRS) and Earth exploration service system (EESS) that use the 2 025-2 120 MHz frequency band to be used for assessing interference and for conducting sharing and compatibility studies     India     2025-09-01
[ 166 ]  
 
Draft revision of the Handbook on space research communication (2014)     India     2025-09-01
[ 165 ]  
 
Reply liaison statement to Working Party 7B - Coordination between space research service (deep space) stations operating in the band 7 145-7 190 MHz and IMT stations operating in the band 6 425-7 125 MHz     WP 5D     2025-07-07
[ 164 ]  
 
Liaison statement to Working Party 5D (copy to Working Parties 4A, 4C, 5A, 5B, 5C, 7B, 7C and 7D for information) - Update on propagation modelling for WRC-27 agenda item 1.7     WPs 3K and 3M   AI1.7   2025-06-10
[ 163 ]  
 
Liaison statement to Working Party 7B (copy to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 7A, 7C and 7D for information) - Report on progress of activities relating to WRC-27 agenda item 1.15     WP 3J   AI1.15   2025-06-10
[ 162 ]  
 
Liaison statement to Working Party 4C (copy to Working Parties 4A, 4B, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D for information) - Update on propagation modelling for WRC-27 agenda items 1.11, 1.12, 1.13 and 1.14     WP 3M   AI1.14, AI1.13, AI1.12, AI1.11   2025-06-10
[ 161 ]  
 
Liaison statement to Working Parties 4A and 5B (copy to Working Parties 5A, 5C, 7A, 7B and 7C for information) - Update on propagation modelling for WRC-27 agenda item 1.2     WP 3M   AI1.2   2025-06-09
[ 160 ]  
 
Liaison statement to Working Party 7C (copy to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B and 7D for information) - Update on propagation modelling for WRC-27 agenda item 1.17     WP 3M   AI1.17   2025-06-09
[ 159 ]  
 
Liaison statement to Working Party 7C (copy to Working Parties 4A, 5A, 5B, 5C, 5D and 7B for information) - Update on propagation modelling for WRC-27 agenda item 1.19     WP 3M   AI1.19   2025-06-09
[ 158 ]  
 
Reply liaison statement to Working Party 7B - WRC-27 agenda item 1.2     WP 4A   AI1.2   2025-06-03
[ 157 ]  
(Rev.1) 
Reply liaison statement to Working Party 5D (copy to Working Parties 4C, 7B and 7D) - Technical information to support studies under WRC-27 agenda item 1.7     WP 4A   AI1.7   2025-06-03
[ 156 ]  
 
Reply liaison statement to ITU-R Working Party 7B - Report on progress of activities relating to WRC-27 agenda item 1.15     WP 5C   AI1.15   2025-05-30
[ 155 ]  
 
Additional information on the summary of conclusions of the 32nd meeting of the Radiocommunication Advisory Group for the attention of all ITU-R Study Groups and Working Parties     Director, BR     2025-05-23
[ 154 ]  
 
Liaison statement to Working Parties 3L, 3M, 4A, 4B, 5A, 5B, 5C, 5D, 7B, 7C, and 7D regarding progress of work on WRC-27 agenda item 1.11     WP 4C   AI1.11   2025-05-12
[ 153 ]  
 
Reply liaison statement to Working Party 7B - Assessment of frequency overlaps between WRC-27 agenda items 1.11, 1.13 and 1.15     WP 4C   AI1.15, AI1.13, AI1.11   2025-05-12
[ 152 ]  
 
Preliminary position on WRC-27 agenda - Preliminary WMO position on the World Radiocommunication Conference 2027 (WRC-27) agenda     World Meteorological Organization     2025-04-07
[ 151 ]  
 
Liaison statement to Working Party 7B - Use of the SZM for radio astronomy in the context of WRC-27 agenda item 1.15     WP 7D   AI1.15   2025-04-02
[ 150 ]  
+Ann.1-11 
Report of the meeting of Working Party 7B (Geneva, 17-26 March 2025)     Acting Chair, WP 7B     2025-03-26
[ 149 ]  
 
Final list of participants - Working Party 7B (Geneva, 17-26 March 2025)     Director, BR     2025-03-26
[ 148 ]  
 
List of documents issued - (Documents 7B/94 - 7B/148)     BR, Study Groups Department     2025-03-17
[ 147 ]  
 
Space sustainability and the protection of scientific services - Brazil's Commitment and International Engagement     Brazil     2025-03-05
[ 146 ]  
 
Proposed reply liaison statement to Working Party 5D - WRC-27 agenda item 1.7     European Space Agency (ESA)   AI1.7   2025-03-05
[ 145 ]  
 
Working document towards a preliminary draft new Report ITU-R SA.[EESS-DOWNLINKS-40GHZ] - Potential future EESS (space-to-Earth) in the frequency range [37.5-52.4 GHz]     European Space Agency (ESA)     2025-03-05
[ 144 ]  
 
Working document towards a preliminary draft new Report ITU-R SA.[EESS-UPLINKS-23GHZ] - Potential future EESS (Earth-to-space) in the 22.55-23.15 GHz band     European Space Agency (ESA)     2025-03-05
[ 143 ]  
 
Draft revision of the Handbook on Space Research Communication (2014)     European Space Agency (ESA)     2025-03-05
[ 142 ]  
 
Proposed draft reply liaison statement to Working Party 4A - Consideration on Draft Table of Contents (ToC) of Handbook on Best practices for the sustainable use of frequencies and associated non-GSO orbits by space radiocommunication services     Germany     2025-03-05
[ 141 ]  
 
Elements for a possible contribution to Working Party 4A - Handbook on Best Practices for the Sustainable use of Frequencies and Associated non-GSO Orbits by Space Radiocommunication Services     Germany     2025-03-05
[ 140 ]  
 
Proposed modifications to the working document towards a draft new Report ITU-R SA.[EESS NGS 7-8GHZ] - Evolution of Earth exploration-satellite service systems in the frequency range 7 190 to 8 400 MHz     France , Germany     2025-03-05
Results:189 total items.
Result page:  1 - 2 - 3 - 4  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2025-09-05