Contribuciones |
|
Número
|
Título
|
Origen
|
AI/Cuestión
|
Fecha
|
|
[ 104 ]
|
Reply liaison statement to Working Party 4C (copy to the SG 7 Chair, the CPM Chair and to Working Parties 3L, 3M, 4B, 5A, 5C, 5D, 7B for information) - WRC-27 agenda item 1.14
|
WP 7C
|
AI1.14
|
2024-09-30 |
|
[ 103 ]
|
Reply liaison statement to Working Party 7B regarding WRC-27 agenda item 1.15
|
WP 7C
|
AI1.15
|
2024-09-30 |
|
[ 102 ]
|
Reply liaison statement to Working Party 5D (copy to Working Parties 3K, 3M, 4A, 4C, 5A, 5B, 5C, 7B and 7C for information) - Relevant technical information to support studies under WRC-27 agenda item 1.7
|
WP 7D
|
AI1.7
|
2024-09-30 |
|
[ 101 ]
|
Reply liaison statement to Working Party 7B (copy for information to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 7A and 7C) - Relevant technical information to support studies under WRC-27 agenda item 1.15
|
WP 7D
|
AI1.15
|
2024-09-30 |
|
[ 100 ]
|
Reply liaison statement to Working Party 4A (copy to Working Parties 4C, 5A, 5B, 5C, 5D, 7B and 7C for information) - Information to support the studies under WRC-27 agenda item 1.1
|
WP 7D
|
AI1.1
|
2024-09-27 |
|
[ 99 ]
|
Reply liaison statement to Working Party 4C (copy to Working Parties 3L, 3M, 4A, 4B, 5A, 5B, 5C, 5D, 6A, 7B, 7C for information) - Technical information to support the studies for WRC-27 agenda items 1.12 and 1.13
|
WP 7D
|
AI1.13, AI1.12
|
2024-09-27 |
|
[ 98 ]
|
Reply liaison statement to Working Party 4C (copy to Working Parties 4A, 4B, 5A, 5B, 5C, 5D, 7B and 7C for information) - WRC-27 agenda item 1.11
|
WP 7D
|
AI1.11
|
2024-09-27 |
|
[ 97 ]
+Ann.1-12 |
Report of the meeting of Working Party 7B (Almaty, Kazakhstan, 18-27 September 2024)
|
Acting Chair, WP 7B
|
|
2024-09-28 |
|
[ 96 ]
|
Final list of participants - Working Party 7B (Almaty, Kazakhstan, 18-27 September 2024)
|
Director, BR
|
|
2024-09-28 |
|
[ 95 ]
|
Reply liaison statement to Working Party 7B (copy to Working Parties 3J, 4A, 4C, 5A, 5B, 5C, 5D, 7C and 7D for information) - Information on the standard frequency and time signal service with regards to WRC-27 agenda item 1.15 on lunar communications
|
WP 7A
|
AI1.15
|
2024-09-23 |
|
[ 94 ]
|
Reply liaison statement to Working Party 4A (copy to Working Parties 3M, 5A, 5B, 5C, 7B and 7C for information) - Information regarding the standard frequency and time signal-satellite service for WRC-27 agenda item 1.2 on smaller antenna sizes for FSS uplinks at 14 GHz
|
WP 7A
|
AI1.2
|
2024-09-20 |
|
[ 93 ]
|
List of documents issued (Documents 7B/35 - 7B/93)
|
BR, Study Groups Department
|
|
2024-09-17 |
|
[ 92 ]
|
Proposed draft reply liaison statement to SG 4 - Consideration on the possible impact and/or support of Working Party 7B regarding the collaboration between Study Groups 4 and 7 on activities in response of Resolution 219 (Bucharest, 2022) and Resolution ITU-R 74 (RA-23)
|
Germany
|
|
2024-09-06 |
|
[ 91 ]
|
Proposed modifications to the working document towards a draft new Report ITU-R SA. [EESS NGS 7-8GHZ]
|
France
,
Germany
|
|
2024-09-06 |
|
[ 90 ]
|
Proposed reply liaison statement to Working Party 5D on WRC-27 agenda item 1.7
|
France
,
Germany
|
AI1.7
|
2024-09-06 |
|
[ 89 ]
|
Proposals to the working document towards a preliminary draft new Report ITU-R SA.[LUNAR.SRS STATIONS CHAR]
|
Russian Federation
|
|
2024-09-06 |
|
[ 88 ]
|
Draft reply liaison statement to Working Party 5D - Technical and operational characteristics for (EESS) (space-to-Earth) systems in the band 8 025-8 400 MHz
|
Egypt
,
Saudi Arabia
|
AI1.7
|
2024-09-05 |
|
[ 87 ]
|
Considerations on technical characteristics and deployment scenarios of EESS, MetSat and SRS systems for compatibility and sharing study of WRC-27 agenda item 1.7
|
Korea (Rep. of)
|
AI1.7
|
2024-09-05 |
|
[ 86 ]
|
Proposed amendments to Report ITU-R SA.2488-0 [CHARACTERISTICS TO BE USED FOR ASSESSING INTERFERENCE TO SYSTEMS OPERATING IN THE EARTH EXPLORATION-SATELLITE AND METEOROLOGICAL-SATELLITE SERVICES, AND FOR CONDUCTING SHARING STUDIES]
|
China
|
|
2024-09-02 |
|
[ 85 ]
|
Proposed reply draft liaison statement to Working Party 5D (copy to Working Parties 1B, 3K, 3M, 4A, 4C, 5A, 5B, 5C, 7C and 7D) - WRC-27 agenda item 1.7
|
China
|
AI1.7
|
2024-09-02 |
|
[ 84 ]
|
Proposed modification to working document towards a preliminary draft new Report ITU-R SA.[LUNAR.SRS STATIONS CHAR] - Technical and operational characteristics for space research systems in the vicinity of the Moon
|
China
|
|
2024-09-02 |
|
[ 83 ]
|
Proposed modification to working document towards a preliminary draft new Report ITU-R SA.[LUNAR.SRS STATIONS CHAR] - Technical and operational characteristics for space research systems in the vicinity of the Moon
|
Japan
|
|
2024-09-02 |
|
[ 82 ]
|
Proposed modification to preliminary draft new [REPORT/RECOMMENDATION] ITU-R SA.[2 GHZ SOS CHAR] - Technical and operational characteristics of the space operation service (SOS) systems that use the 2 025-2 110 MHz (Earth-to-space) (space-to-space) and 2 200-2 290 MHz (space-to-Earth) space-to-space) frequency bands to be used for assessing interference and for conducting sharing studies
|
Japan
|
|
2024-09-02 |
|
[ 81 ]
|
Consideration on the overlapping frequency band 7 190-7 235 MHz between WRC-27 agenda items 1.7 and 1.15
|
Acting Chairs, WPs 5D and 7B
|
AI1.7, AI1.15
|
2024-09-02 |
|
[ 80 ]
|
Preliminary draft new [REPORT/RECOMMENDATION] ITU-R SA.[2 GHZ SOS CHAR] - Technical and operational characteristics of the space operation service (SOS) systems that use the 2 025-2 110 MHz (Earth-to-space) (space-to-space) and 2 200-2 290 MHz (space-to-Earth) (space-to-space) frequency bands to be used for assessing interference and for conducting sharing studies
|
Canada
|
|
2024-08-30 |
|
[ 79 ]
|
Proposed revisions to reply liaison statement to Working Party 5D on WRC-27 agenda item 1.7
|
United States
|
AI1.7
|
2024-08-30 |
|
[ 78 ]
|
Draft reply liaison statement to Working Party 4A - Characteristics of space research service systems operating in the 13.75-14.0 GHz band
|
United States
|
AI1.2
|
2024-08-28 |
|
[ 77 ]
|
Proposed revisions to preliminary draft new [REPORT/RECOMMENDATION] ITU-R SA.[2 GHZ SOS CHAR] - Technical and operational characteristics of the space operation service (SOS) systems that use the 2 025-2 110 MHz (Earth-to-space) (space-to-space) and 2 200-2 290 MHz (space-to-Earth) (space-to-space) frequency bands to be used for assessing interference and for conducting sharing studies
|
United States
|
|
2024-08-28 |
|
[ 76 ]
|
Preliminary draft revision of Report ITU-R SA.2488-0 - Characteristics to be used for assessing interference to systems operating in the Earth exploration-satellite and meteorological-satellite services, and for conducting sharing studies
|
United States
|
|
2024-08-28 |
|
[ 75 ]
|
Working document towards a preliminary draft new Report ITU-R SA.[LUNAR.SRS STATIONS CHAR] - Technical and operational characteristics for space research systems in the vicinity of the Moon
|
United States
|
AI1.15
|
2024-08-28 |
|
[ 74 ]
|
Working document towards a preliminary draft new Report ITU-R SA.[LUNAR 1.15 STUDIES] - Working document on sharing studies of space research systems for lunar operations under WRC-27 agenda item 1.15
|
United States
|
AI1.15
|
2024-08-28 |
|
[ 73 ]
|
Draft reply liaison statement to Working Party 4C - Technical and operational characteristics of the space research service and Earth exploration-satellite service systems in the 2 200-2 290 MHz and 2 290-2 300 MHz bands for use in sharing and compatibility studies
|
United States
|
|
2024-08-28 |
|
[ 72 ]
|
Preliminary draft new Recommendation ITU-R SA.[2.0 GHZ SRS & EESS CHAR] - Technical and operational characteristics of the space research service and Earth exploration-satellite service systems that use the 2 025-2 120 MHz (Earth-to-space) frequency band to be used for assessing interference and for conducting sharing studies
|
United States
|
|
2024-08-28 |
|
[ 71 ]
|
Committee on the Peaceful Uses of Outer Space: 2024 - Sixty-seventh session (19-28 June 2024) - Space Sustainability Issues
|
Brazil
|
|
2024-08-26 |
|
[ 70 ]
|
Interpretation to the wording "Major portion of the Earth atmosphere" used in Article 1, Nos. 1.64 and 1.178 of the Radio Regulations
|
Azerbaijan
|
|
2024-08-16 |
|
[ 69 ]
|
Report on the activities of the WP 7B Correspondence Group related to WRC-27 agenda item 1.7
|
Convenor of the WP 7B CG on the development of an RLS to WP 5D
|
AI1.7
|
2024-08-09 |
|
[ 68 ]
|
Liaison statement to Working Party 7B - Possible coordination of space research service (deep space) stations operating in the band 7 145-7 190 MHz with IMT stations operating in the band 6 425-7 125 MHz
|
WP 5D
|
|
2024-07-16 |
|
[ 67 ]
|
Information on the preparation of texts for the draft CPM Report to WRC-27
|
Chair, CPM-27
|
|
2024-07-09 |
|
[ 66 ]
|
Liaison statement to Working Parties 3K, 3M, 4A, 4C, 5A, 5B, 5C, 7B, 7C and 7D - WRC-27 agenda item 1.7
|
WP 5D
|
AI1.7
|
2024-07-08 |
|
[ 65 ]
|
Initial reply liaison statement to Working Parties 7B and 7C - Relevant technical information to support studies under WRC-27 agenda items 1.15, 1.17 and 1.19
|
WP 5D
|
AI1.19, AI1.17, AI1.15
|
2024-07-08 |
|
[ 64 ]
|
Reply liaison statement to Working Parties 4C and 7B for WRC-27 agenda items 1.12, 1.13, 1.14 and 1.15 - Technical and operational characteristics of HIBS for sharing and compatibility studies in preparation for WRC-27
|
WP 5D
|
AI1.15, AI1.14, AI1.13, AI1.12
|
2024-07-08 |
|
[ 63 ]
|
Reply liaison statement to Working Party 7C (copy to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B and 7D for information) - Relevant technical information to support studies under WRC-27 agenda item 1.17
|
WPs 3L and 3M
|
AI1.17
|
2024-06-12 |
|
[ 62 ]
|
Reply liaison statement to Working Party 4A (copy to Working Parties 4C, 5A, 5B, 5C, 5D, 7B, 7C and 7D for information) - Information to support studies under WRC-27 agenda item 1.1
|
WP 3M
|
AI1.1
|
2024-06-12 |
|
[ 61 ]
|
Reply liaison statement to Working Party 4A (copy to Working Parties 5A, 5B, 5C, 7A, 7B and 7C for information) - Relevant technical information to support studies under WRC-27 agenda item 1.2
|
WP 3M
|
AI1.2
|
2024-06-12 |
|
[ 60 ]
|
Reply liaison statement to Working Party 4C (copy to Working Parties 4A, 4B, 5A, 5B, 5C, 5D, 6A,7B, 7C and 7D for information) - Studies under WRC-27 agenda items 1.11, 1.12, 1.13 and 1.14
|
WPs 3L and 3M
|
AI1.14, AI1.13, AI1.12, AI1.11
|
2024-06-12 |
|
[ 59 ]
|
Reply liaison statement to Working Party 7C (copy to Working Parties 4A, 5A, 5B, 5C, 5D and 7B for information) - WRC-27 agenda item 1.19
|
WPs 3J and 3M
|
AI1.19
|
2024-06-12 |
|
[ 58 ]
|
Reply liaison statement to Working Party 7B (copy to Working Parties 1B, 4A, 4C, 5A, 5B, 5C, 5D, 7A, 7C and 7D) - Relevant technical information to support studies under WRC-27 agenda item 1.15
|
WP 3J
|
AI1.15
|
2024-06-12 |
|
[ 57 ]
|
Reply liaison statement to Working Party 5D (copy to Working Parties 1B, 4A, 4C, 5A, 5B, 5C, 7B, 7C and 7D for information) - Relevant technical information to support studies under WRC-27 agenda item 1.7
|
WPs 3K & 3M
|
AI1.7
|
2024-06-10 |
|
[ 56 ]
|
Reply liaison statement to Working Party 7B
(copy to Working Parties 1B, 3J, 4A, 4C, 5A, 5B, 5D,
7A, 7C and 7D for information) - Fixed service characteristics for use in sharing studies under
WRC-27 agenda item 1.15
|
WP 5C
|
AI1.15
|
2024-05-29 |
|
[ 55 ]
|
Reply liaison statement to Working Party 4C (copy to Working Parties 3L, 3M, 4A, 4B, 5A, 5B, 5D, 6A, 7B, 7C and 7D for information) - Fixed service characteristics for use in sharing studies under WRC-27 agenda item 1.13
|
WP 5C
|
AI1.13
|
2024-05-29 |
Resultados :104 documentos Resultados :
1 -
2 -
3
- Siguiente
|
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):