|
Format |
Size |
Posted |
|
|
|
English |
PDF (acrobat)
|
145627 bytes |
2024-10-07 |
[142] Annex 30
- Final list of participants |
|
Word
|
48326 bytes |
2024-10-08 |
[142] Annex 29
- List of documents issued (Documents 7C/41 - 7C/137) |
|
Word
|
52354 bytes |
2024-10-08 |
[142] Annex 28
- Review of Recommendations, Reports and Opinions under the purview of Working Party 7C |
|
Word
|
34660 bytes |
2024-10-08 |
[142] Annex 27
- Status of Questions assigned to Working Party 7C |
|
Word
|
34855 bytes |
2024-10-08 |
[142] Annex 26
- List of contributors to the work on updating the "ITU/WMO Handbook on use of radio spectrum for meteorology" |
|
Word
|
35273 bytes |
2024-10-08 |
[142] Annex 25
- Terms of Reference for Working Party 7C Correspondence Group on updating the "ITU/WMO Handbook on use of radio spectrum for meteorology" |
|
Word
|
46369 bytes |
2024-10-08 |
[142] Annex 24
- Timeline for finalisation of the update of the "ITU/WMO Handbook on use of radio spectrum for meteorology" |
|
Word
|
1039952 bytes |
2024-10-08 |
[142] Annex 23
- Working document towards a preliminary draft revision of Recommendation ITU-R RS.515-5 - Frequency bands and bandwidths used for satellite passive remote sensing |
|
Word
|
3358869 bytes |
2024-10-08 |
[142] Annex 22
- Preliminary draft new ITU-R Report - Analysis of interference received by EESS (passive) sensors in the 18.6-18.8 GHz band caused by surface water reflections |
|
Word
|
2903836 bytes |
2024-10-08 |
[142] Annex 21
- Working document toward a preliminary draft revision of Report ITU-R RS.2431-0 - Technical and operational characteristics of EESS (passive) systems in the frequency range 275-[ XXX] GHz |
|
Word
|
3933361 bytes |
2024-10-08 |
[142] Annex 20
- Working document toward a preliminary draft revision of Recommendation ITU-R RS.1861-1 - Typical technical and operational characteristics of Earth exploration-satellite service (passive) systems using allocations between 1.4 and 275 GHz |
|
Word
|
48719 bytes |
2024-10-08 |
[142] Annex 19
- Status of issues related to EESS (passive) above 86 GHz |
|
Word
|
38404 bytes |
2024-10-08 |
[142] Annex 18
- Draft work plan for WRC-27 agenda item 1.18 on resolves 1 of Resolution 712 (WRC-23) |
|
Word
|
358666 bytes |
2024-10-08 |
[142] Annex 17
- Working document towards a preliminary draft new Report ITU-R [1.18 - EESS] |
|
Word
|
36576 bytes |
2024-10-07 |
[142] Annex 16
- Working document towards a preliminary draft new Report ITU-R RS.[EESS(PASSIVE)6-7 GHz] - EESS (passive) in the 6 425-7 250 MHz range |
|
Word
|
36885 bytes |
2024-10-07 |
[142] Annex 15
- Work plan for WRC-27 agenda item 1.19 |
|
Word
|
18773187 bytes |
2024-10-08 |
[142] Annex 14
- Working document towards a preliminary draft new Report ITU-R RS.[SST MEASUREMENTS] - Spectrum for EESS (passive) sea surface temperature (SST) measurements |
|
Word
|
43158 bytes |
2024-10-07 |
[142] Annex 13
- Working document towards a PDN Report on WRC-27 agenda item 1.19 - Studies on possible allocations to the Earth exploration-satellite service (passive) in the bands 4 200-4 400 MHz and 8 400-8 500 MHz |
|
Word
|
1903660 bytes |
2024-10-07 |
[142] Annex 12
- Preliminary draft revision of Report ITU-R RS.2489-0 |
|
Word
|
47029 bytes |
2024-10-08 |
[142] Annex 11
- Proposed draft CPM text for WRC-27 agenda item 1.17 |
|
Word
|
40086 bytes |
2024-10-07 |
[142] Annex 10
- Working document toward a preliminary draft new Report ITU-R RS.[SW_STUDIES] - |
|
Word
|
35310 bytes |
2024-10-07 |
[142] Annex 9
- Work paln for WRC-27 agenda item 1.17 |
|
Word
|
132159 bytes |
2024-10-07 |
[142] Annex 8
- Element for protection criteria for SW sensors operating in frequency not listed in Resolution 682 (WRC-23) |
|
Word
|
132157 bytes |
2024-10-07 |
[142] Annex 7
- Working document towards a preliminary draft new Recommendation ITU-R RS.[RXSW_PROTECT_CRITERIA] - Protection criteria of receive-only space weather sensors in the meteorological aids service (space weather) |
|
Word
|
32135 bytes |
2024-10-07 |
[142] Annex 6
- Working document towards a preliminary draft new Report ITU-R - Typical technical and operational characteristics of spaceborne
active sensors in the band 3 000-3 400 MHz |
|
Word
|
36432 bytes |
2024-10-07 |
[142] Annex 5
- Elements of working document towards a preliminary draft new Report ITU-R - Compatibility study between spaceborne EESS (active) SAR systems and radiolocation service |
|
Word
|
1702596 bytes |
2024-10-07 |
[142] Annex 4
- Preliminary draft revision of Recommendation ITU-R RS.1166-5 - Performance and interference criteria for active spaceborne sensors |
|
Word
|
513764 bytes |
2024-10-07 |
[142] Annex 3
- Preliminary draft revision of Recommendation ITU-R RS.2105-2 - Typical technical and operational characteristics of Earth exploration-satellite service (active) systems using allocations between 432 MHz and 238 GHz |
|
Word
|
64750 bytes |
2024-10-07 |
[142] Annex 2
- Preliminary draft revision of Recommendation ITU-R RS.577-7 - Frequency bands and required bandwidths used for spaceborne active sensors operating in the Earth exploration-satellite (active) and space research (active) services |
|
Word
|
147919 bytes |
2024-10-07 |
[142] Annex 1
- Preliminary draft new Report ITU R RS.[AGG_EESS_SAR-RNSS] - Examples of evaluating and resolving interference into receiving earth stations in the radionavigation-satellite service (space-to-Earth) from multiple spaceborne synthetic aperture radar sensors in the Earth exploration-satellite (active) service in the 1 215-1 300 MHz band |
|
Word
|
122800 bytes |
2024-10-18 |
[142]
- Report on the meeting of Working Party 7C (18 - 27 September 2024) |
|
|