Temporary Documents
(GEN)
|
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 58-GEN ]
|
Final List of Participants
|
TSB
|
QALL/5
|
2002-07-02 |
|
[ 57-GEN ]
|
Final List of Temporary Documents
|
TSB
|
QALL/5
|
2002-07-02 |
|
[ 56-GEN ]
|
Report of Working Party 1/5
|
Chairman of WP1/5
|
Q9/5, Q6/5, Q5/5, Q4/5, Q13/5, Q11/5, Q10/5
|
2002-07-02 |
|
[ 55-GEN ]
|
Liaison statement to CIGRÉ and UIC concerning amendments to the Directives Volume VI
|
Rapporteur for Q9/5
|
Q9/5
|
2002-07-02 |
|
[ 54-GEN ]
|
Report on the discussion of Question 1/5
|
Rapporteur for Q1/5
|
Q1/5
|
2002-07-02 |
|
[ 53-GEN ]
|
Liaison to ETSI ERM JWG on radiation
|
Rapporteur for Q2/5
|
Q2/5
|
2002-07-02 |
|
[ 52-GEN ]
|
Progress report
|
Rapporteur for Q2/5
|
Q2/5
|
2002-07-02 |
|
[ 51-GEN ]
|
Report on Q3/5
|
Rapporteur for Q3/5
|
Q3/5
|
2002-07-02 |
|
[ 50-GEN ]
|
Rapporteurs Report on Q7/5
|
Rapporteur for Q7/5
|
Q7/5
|
2002-07-02 |
|
[ 49-GEN ]
|
Report of discussion on Question 12/5
|
Rapporteur for Q12/5
|
Q12/5
|
2002-07-02 |
|
[ 48-GEN ]
|
Revised Recommendation K.mes
|
Rapporteur for Q3/5
|
Q3/5
|
2002-07-02 |
|
[ 47-GEN ]
|
Summary of the discussion on draft Recommendations K.olo (TD25), K.rcol (TD24) and K.rub (TD23)
|
Rapporteur for Q1/5
|
Q1/5
|
2002-07-02 |
|
[ 46-GEN ]
(Rev.1) |
Test on DC input
|
Rapporteur for Q12/5
|
Q12/5
|
2002-07-02 |
|
[ 45-GEN ]
|
Status of Question 2/5
|
Rapporteur for Q2/5
|
Q2/5
|
2002-07-02 |
|
[ 44-GEN ]
|
Summary of Recommendations at start of the meeting
|
Rapporteur for Q4, 13/5
|
Q4/5, Q13/5
|
2002-07-02 |
|
[ 43-GEN ]
|
Report on the IEC TC81 activities
|
Chairman of WP1/5
|
QALL/5
|
2002-07-02 |
|
[ 42-GEN ]
|
Introduction to the measurement of radiated fields by overhead lines
|
Rapporteur for Q2/5
|
Q2/5
|
2002-07-02 |
|
[ 41-GEN ]
|
Summary of the work realised at the ETSI/CENELEC JWG meeting #6 on radiation
|
Rapporteur for Q2/5
|
Q2/5
|
2002-07-02 |
|
[ 40-GEN ]
|
Emission of xDSL on overhead lines
|
Rapporteur for Q2/5
|
Q2/5
|
2002-07-02 |
|
[ 39-GEN ]
|
Results of a validation exercise
|
Rapporteur for Q7/5
|
Q7/5
|
2002-07-02 |
|
[ 38-GEN ]
|
Meeting report: ACEC meeting, April 2002
|
ACEC Liaison Rapporteur
|
QALL/5
|
2002-07-02 |
|
[ 37-GEN ]
|
France Telecom comments on Questions 1, 4 and 13/5
|
Chairman of WP1/5
|
Q4/5, Q13/5, Q1/5
|
2002-07-02 |
|
[ 36-GEN ]
|
Report on the 7th International Advisory Committee Meeting
|
WHO Liaison Rapporteur
|
QALL/5
|
2002-07-02 |
|
[ 35-GEN ]
|
Analytical Expressions for the Statistical Distributions for the Combined Field Generated by Two Independently Radiated Emissions
|
Rapporteur for Q7/5
|
Q7/5
|
2002-07-02 |
|
[ 34-GEN ]
|
Situation of revised Recommendation K.48
|
Rapporteur for Q12/5
|
Q12/5
|
2002-07-02 |
|
[ 33-GEN ]
|
Disturbance on the DC power supply
|
Rapporteur for Q12/5
|
Q12/5
|
2002-07-02 |
|
[ 32-GEN ]
|
Chapter 3 of Earthing Handbook
|
Editor of Chapter 3 of Earthing Handbook
|
Q6/5
|
2002-07-02 |
|
[ 31-GEN ]
|
Preliminary draft of new Recommendation K.swp "Safe working practices for outside equipment installed in particular environment" and questionnaire for identifying specific working practices on telecommunications installation
|
Rapporteur for Q11/5
|
Q11/5
|
2002-07-02 |
|
[ 30-GEN ]
|
Revision of Chapter 1 of Earthing & Bonding of Telecommunications Installations Handbook
|
N/A
|
|
2002-07-02 |
|
[ 29-GEN ]
|
Tower effect on the risk of damages to its neighbourhood due to lightning
|
Rapporteur for Q5/5
|
Q5/5
|
2002-06-20 |
|
[ 28-GEN ]
|
Resistance effect in lightning current distribution
|
Rapporteur for Q5/5
|
Q5/5
|
2002-06-20 |
|
[ 27-GEN ]
|
A draft handbook for applying mitigation measures in telecommunications installations
|
Rapporteur for Q10/5
|
Q10/5
|
2002-06-17 |
|
[ 26-GEN ]
|
A draft handbook for identifying trouble sources of EM problems in telecommunications installations
|
Rapporteur for Q10/5
|
Q10/5
|
2002-06-17 |
|
[ 25-GEN ]
|
Draft new Recommendation K.olo - "Necessary steps to ensure safe and problem-free operation in multiple operator environment"
|
Rapporteur for Q1/5
|
Q1/5
|
2002-06-17 |
|
[ 24-GEN ]
|
Draft new Recommendation K.rcol, - "Recommendation for EMC, resistibility, and safety requirements of equipment collocated in telecommunication centre"
|
Rapporteur for Q1/5
|
Q1/5
|
2002-06-17 |
|
[ 23-GEN ]
|
Draft new Recommendation K.rub - "Recommendation for EMC, Resistibility and Safety requirements of telecommunication services in use of unbundling cable"
|
Rapporteur for Q1/5
|
Q1/5
|
2002-06-17 |
|
[ 22-GEN ]
|
Proposal for revision of K.21
|
Rapporteur for Q10/5
|
Q4/5, Q13/5
|
2002-06-17 |
|
[ 21-GEN ]
|
Proposal for revision of K.31
|
Rapporteur for Q10/5
|
Q6/5
|
2002-06-17 |
|
[ 20-GEN ]
|
Proposed section on categories of malfunction for K.qual
|
Rapporteur for Q10/5
|
Q8/5, Q10/5
|
2002-06-17 |
|
[ 19-GEN ]
|
Resistibility requirement for telecommunication equipment with new ports
|
Rapporteur for Q10/5
|
Q4/5, Q13/5
|
2002-06-17 |
|
[ 18-GEN ]
|
Draft of Earthing Handbook
|
Editor
|
Q6/5
|
2002-06-17 |
|
[ 17-GEN ]
|
Draft new Recommendation K.rbs: "The protection of radio base stations against lightning discharges"
|
Rapporteur for Q5/5
|
Q5/5
|
2002-06-11 |
|
[ 16-GEN ]
|
Issues List for Questions 4 and 13/5
|
Rapporteur for Qs4, 13/5
|
Q4/5, Q13/5
|
2002-06-10 |
|
[ 15-GEN ]
|
Proposed changes to Recommendation K.44 re earthing and test methods
|
Rapporteur for Qs 4, 13/5
|
Q6/5, Q4/5, Q13/5
|
2002-06-10 |
|
[ 14-GEN ]
|
Proposed text for K.45 "Resistibility of telecommunication equipment installed at outdoor locations to overvoltages and overcurrents"
|
Rapporteur for Qs 4, 13/5
|
Q4/5, Q13/5
|
2002-06-10 |
|
[ 13-GEN ]
|
Proposed text for K.21 "Resistibility of telecommunication equipment installed in customer premises to overvoltages and overcurrents"
|
Rapporteur for Qs 4, 13/5
|
Q4/5, Q13/5
|
2002-06-10 |
|
[ 12-GEN ]
|
Proposed text For K.20 "Resistibility of telecommunication equipment installed in a telecommunications centre to overvoltages and overcurrents"
|
Rapporteur for Qs 4, 13/5
|
Q4/5, Q13/5
|
2002-06-10 |
|
[ 11-GEN ]
(Rev.1) |
Draft new Recommendation K.idc: Overvoltage and overcurrent requirements for IDC terminations
Rev.1 available
|
Rapporteur for Q4, 13/5
|
Q4/5, Q13/5
|
2002-07-02 |
|
[ 10-GEN ]
|
Draft new Recommendation K.hold: Overvoltage and overcurrent requirements for interconnecting elements and protection holders
|
Rapporteur for Qs 4, 13/5
|
Q4/5, Q13/5
|
2002-06-10 |
|
[ 9-GEN ]
|
Proposed changes to Recommendation K.31
|
Rapporteur for Qs 4, 13/5
|
Q4/5, Q13/5
|
2002-06-10 |
Results:58 total items. Result page:
1 -
2
- Next
|
Multiple Document Download: Formats and Languages to be included (when available):