Français
Español
Home
:
ITU-T
:
SG06
:
Contributions
Recently posted
-
Search Meeting Documents
ITU-T SG06 C
ITU-T SG06
Max # of documents displayed/page:
Outside plant
Study Period 2001
Results:
49
total items.
Contributions
Number
Title
Source
AI/Question
Filter...
Q10/6
Q3/6
Q4/6
Q5/6
Q6/6
Q7/6
Q8/6
Q9/6
QALL/6
Clear filter
Date
[ 49 ]
Study plan Q.4 for next study period
Rapporteur, Q.4/6
Q4/6
2004-04-16
[ 48 ]
Draft of study plan for Question 3/6 - Copper cables and networks for broadband access
Q3/6 Rapporteur
Q3/6
2004-04-14
[ 47 ]
Draft new Recommendation L.60 (ex-L.hyb) "Construction of optical/metallic hybrid cables" (for consent)
Rapporteur of Q.8/6
Q8/6
2004-04-01
[ 46 ]
Draft new Recommendation L.59 (ex-L.indoor) "Optical fibre cables for indoor application" (for consent)
Rapporteur of Q.8/6
Q8/6
2004-04-01
[ 45 ]
Proposal adapted study plan Q.7 for the next study period
Rapporteur, Q.7/6
Q7/6
2004-03-11
[ 44 ]
Draft of study plan for Question 9/6 - Construction of optical networks in the access area
Rapporteur of Q.9/6
Q9/6
2004-02-19
[ 43 ]
(Rev.1)
Future study items for Q.8/6 - Optical fibre cable construction
Rapporteur of Q.8/6
Q8/6
2004-02-19
[ 42 ]
Draft of study plan for Question 5/6 - Optical fibre cable network maintenance
Rapporteur of Q.5/6
Q5/6
2004-02-19
[ 41 ]
Draft new Recommendation L.50: Requirements for optical distribution frame in a central office (for consent)
NTT
Q7/6
2003-09-29
[ 40 ]
Draft new Recommendation L.58 (ex-L.cabax): Optical fibre cables for access network (for consent)
Rapporteur of Q.8/6
Q8/6
2003-09-29
[ 39 ]
Draft revised Recommendation L.19: "Multi-pair copper network cable supporting shared multiple services such as POTS/ISDN/xDSL" (for consent)
Rapporteur for Q.3/6
Q3/6
2003-09-25
[ 38 ]
Draft new Recommendation L.54 (ex. L.jointbox): "Splice closures for marinized terrestrial cables (MTC)" (for consent)
Rapporteur Q.10/6
Q10/6
2003-09-23
[ 37 ]
Draft new Recommendation L.51: Passive node elements for fibre optic networks - General principles and definitions for characterisation and performance evaluation (for approval)
Rapporteur Q.7/6
Q7/6
2003-02-19
[ 36 ]
Draft revised Recommendation L.13: Performance requirements for passive optical nodes: Sealed closures for outdoor environments (for approval)
Raporteur Q.7/6
Q7/6
2003-02-19
[ 35 ]
Draft new Recommendation L.52: "Deployment of passive optical networks (PON)" (for consent)
Rapporteur Q.9/6
Q9/6
2003-02-17
[ 34 ]
Draft new Recommendation L.42: "Extending optical fibre solutions into the access network" (for consent)
Rapporteur Q.9/6
Q9/6
2003-02-17
[ 33 ]
Draft new Recommendation L.53 (ex-L.mai): "Optical fibre maintenance criteria for access networks" (for consent)
Rapporteur Q.5/6
Q5/6
2003-02-17
[ 32 ]
Draft new Recommendation L.digitdb (for determination)
Rapporteur Q.10/6
Q10/6
2003-02-18
[ 31 ]
Draft new Recommendation L.52: "Deployment of passive optical networks (PON)"
Rapporteur Q9/6
Q9/6
2002-08-02
[ 30 ]
Draft new Recommendation L.42: "Extending optical fibre solutions into the access network"
Rapporteur Q9/6
Q9/6
2002-08-02
[ 29 ]
Draft new Recommendation L.43: Optical fibre cables for buried application
Rapporteur Q8/6
Q8/6
2002-08-02
[ 28 ]
Draft revised Recommendation L.26: Optical fibre cables for aerial application
Rapporteur Q8/6
Q8/6
2002-08-02
[ 27 ]
Draft revised Recommendation L.10: Optical fibre cables for duct and tunnel application
Rapporteur Q8/6
Q8/6
2002-08-02
[ 26 ]
Draft new Recommendation L.mai: "Optical fibre maintenance criteria for access networks"
Rapporteur Q5/6
Q5/6
2002-08-02
[ 25 ]
Issues on OTDR monitoring of active fibres
Italy
Q5/6
2002-08-02
[ 24 ]
Draft new Recommendation L.51 (ex-L.new): Passive node elements for fibre optic networks - General principles and definitions for characterisation and performance evaluation (for consent)
Rapporteur Q7/6
Q7/6
2002-08-02
[ 23 ]
Draft revised Recommendation L.13: Performance requirements for passive optical nodes: sealed closures for outdoor environments (for consent)
Rapporteur Q7/6
Q7/6
2002-08-02
[ 22 ]
Draft revised Recommendation L.28 "External additional protection for marinized terrestrial cables" (for consent)
Rapporteur Q10/6
Q10/6
2002-08-01
[ 21 ]
Italian experience on remote fibre monitoring and testing
Italy
Q5/6
2002-08-01
[ 20 ]
Installation of optical fibre cable along railways
Telefónica de España
Q4/6
2002-06-04
[ 19 ]
Optical fibre cable installation by blowing technique
Telefónica de España
Q4/6
2002-06-04
[ 18 ]
Replies to Circular TSB 52 (Summary): Questionnaire related to joint closures, termination and distribution frames, outdoor enclosures and passive modules for optical networks
Rapporteur Q.7/6
Q7/6
2002-01-21
[ 17 ]
Draft new Recommendation L.50 "Optical fibre cable closures general requirements" (for consent)
Ukraine
Q7/6
2001-10-16
[ 16 ]
Optical fibre communication lines installed along railway
Ukraine
Q3/6
2001-10-16
[ 15 ]
Draft new Recommendation L.48: Mini-trenching cable laying technique (for consent)
Rapporteur Q.6/6
Q6/6
2001-10-16
[ 14 ]
Draft new Recommendation L.49: Micro-trenching cable laying technique (for consent)
Rapporteur Q.6/6
Q6/6
2001-10-16
[ 13 ]
Construction of optical networks in the access areabased on duct installation techniques
Nertherlands
Q4/6
,
Q9/6
2001-10-16
[ 12 ]
Proposal for a new Recommendation on Underwater Cables Digital Database
Rapporteur Q.10/6
Q10/6
2001-10-16
[ 11 ]
Installation of telecommunication cables in small trenches: an overview on micro-trenching technique
Italy
Q6/6
2001-01-15
[ 10 ]
Installation of telecommunication cables in small trenches: an overview on mini trenching technique
Italy
Q6/6
2001-01-15
[ 9 ]
Work plan for Question 6/6 "Installation of underground telecommunication cables in small trenches"
Italy
Q6/6
2001-01-15
[ 8 ]
Proposed appendix of Recommendation (L.40) "Optical fibre outside plant maintenance support and testing system"
Italy
Q5/6
2001-01-15
[ 7 ]
Proposed appendix of Recommendation (L.40) "Optical fibre outside plant maintenance support and testing system"
NTT
Q5/6
2001-01-15
[ 6 ]
Proposed study plan of Question 5/6 - Optical fibre cable network maintenance
NTT
Q5/6
2001-01-15
[ 5 ]
Study plan for Question 8/6 - Optical fibre cable construction
NTT
Q8/6
2001-01-15
[ 4 ]
Study plan for Question 9/6 - Construction of optical networks in the access area
NTT
Q9/6
2001-01-15
[ 3 ]
SDH Test Light module for SDH Ring OAN
Telkom-Indonesia
Q5/6
2001-01-15
[ 2 ]
Indonesian experience on optical fiber cable operation and maintenance support system
Telkom-Indonesia
Q5/6
2001-01-15
[ 1 ]
Questions allocated to Study Group 6 (Outside plant) for the Study Period 2001-2004
World Telecommunication Standardization Assembly (WTSA-2000, Montreal, 27 September - 6 October 2000)
QALL/6
2000-11-28
Results:
49
total items.
Multiple Document Download:
Check the boxes of the selected documents, then click "Zip and download"
User preferences:
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages
Yes
Formats
doc
pdf
zip
+ Other formats
Languages (maximum 2)
E
F
S
A
C
R
+ Multilingual
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)
Test ITU Translate for automated document translation
Top
-
Feedback
-
Contact Us
-
Copyright © ITU
2008 All Rights Reserved
Contact for this page :
TSB EDH
Updated : 2003-04-08