International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : NGN GSI : Meeting 2008-05-12 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T NGN GSI  C (2008-05-12) 

ITU-T NGN GSI

NGN Global Standards Initiative

Study Period 2005

Meeting  from 2008-05-12 to 2008-05-23

held in Switzerland [Geneva]

Other Meetings : 2008-09-01  2008-01-14  2007-09-11  2007-04-16  2007-01-08  2006-10-24  2006-07-17  2006-04-22  2006-01-16 

Results:302 total items.
Result page:  1 - 2 - 3 - 4 - 5 - 6 - 7  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 1059 ]  
 
Draft Recommendation Y.NGN-DSL: Roadmap for DSL based systems in Next Generation Networks     Korea (Rep. of )   Q3/13   2008-05-12
[ 1058 ]  
 
Proposed update of definition for Q.FMC-IMS     China Mobile   Q6/13, Q5/19   2008-05-12
[ 1057 ]  
 
Add mapping of 3GPP VCC architecture to IMS based FMC reference model     China Mobile   Q6/13, Q5/19   2008-05-12
[ 1056 ]  
 
Propose for user group creation in draft X.idm-dm     Huawei Technologies Co.,Ltd.   Q6/17, Q15/13   2008-05-07
[ 1055 ]  
 
IMS Message flows using MIH and SIP for Intersystem-Handover: Towards Draft Q.HCF. Flows Message flows are added to Section I.2.1 to complement the functionality.of the scenario     InterDigital Communications, LLC   Q6/13, Q2/19   2008-05-06
[ 1054 ]  
 
Procedural Information Flows for Host-based Handover Control in Q.HCF     ETRI   Q6/13, Q2/19   2008-05-04
[ 1053 ]  
 
Functional Architecture of HCF     ETRI   Q6/13, Q2/19   2008-05-04
[ 1052 ]  
 
Trusted SPID requirements and related concerns     VeriSign   Q6/17, Q15/13   2008-05-06
[ 1051 ]  
 
Harmonization of IdM requirements specifications     VeriSign   Q6/17, Q15/13   2008-05-04
[ 1050 ]  
 
Concerns and recommendations on the current SPID approach     Qwest Communications and AT&T   Q6/17, Q15/13   2008-05-04
[ 1049 ]  
 
Proposed texts for the IPv6-based NGN in NGN-R2-Reqts     ETRI   Q9/13, Q2/13   2008-05-04
[ 1048 ]  
 
Proposed signaling flows supporting PMIPv6 for Q.NACF.mob2     ETRI   Q3/13, Q7/11   2008-05-06
[ 1047 ]  
 
Proposed text of Section 4. NGN release 2 environment overview of 'Supplement NGN Release 2 Scope' document     ETRI   Q1/13   2008-05-04
[ 1046 ]  
 
Proposed text of Section 3. Terms and definitions of 'Supplement NGN Release 2 Scope' document     ETRI   Q1/13   2008-05-04
[ 1045 ]  
 
Proposed text of Section 5. NGN release 2 services of 'Supplement NGN Release 2 Scope' document     ETRI   Q1/13   2008-05-04
[ 1044 ]  
 
Proposal for Section 6.3 in Q.HCF     ETRI   Q6/13, Q2/19   2008-05-04
[ 1043 ]  
 
Text for Sections 6.4 and 7.4 of Q.CRBT_CRT draft     ETRI   Q3/11, Q2/11   2008-05-04
[ 1042 ]  
 
Integrating the IPTV architectural elements     France Telecom   Q3/13   2008-05-04
[ 1041 ]  
 
Modification of 8.2; scenarios for QoS management in Y.mpls-mob     ETRI   Q2/13   2008-05-04
[ 1040 ]  
 
Proposal for Section 8.2 in Y.mpls-mob     ETRI   Q2/13   2008-05-04
[ 1039 ]  
 
Addition of QMF related to MM in Y.MCFArch and Y.MPLS-mob     ETRI   Q3/13, Q2/13   2008-05-04
[ 1038 ]  
 
Proposed Modification of the Functional Architecture in Y.ngn-account-R2     ETRI   Q4/13, Q2/13   2008-05-04
[ 1037 ]  
 
Proposed Modification and New Requirements in Y.ngn-account-R2     ETRI   Q2/13   2008-05-04
[ 1036 ]  
 
Comments on draft Y.CIP     France Telecom   Q3/13   2008-05-04
[ 1035 ]  
 
Home gateway architecture in NGN     France Telecom   Q3/13   2008-05-04
[ 1034 ]  
 
Comments on draft Y.NGN-DSL     France Telecom   Q3/13   2008-05-06
[ 1033 ]  
 
Proposal for addition of some NGN capabilities for USN applications and Services in Y.USN-reqts     KT   Q2/13   2008-05-04
[ 1032 ]  
 
Proposed modification of clause 8.1 of Y.mpls-mob     China Telecom   Q2/13   2008-05-04
[ 1031 ]  
 
Proposal on Addition of Annex in Q.3308: Applications of Rh Interface     China Telecom   Q5/11   2008-05-04
[ 1030 ]  
 
NGN-based services standardization approach     Ministry of the Russian Federation for the Informa   Q8/13   2008-05-06
[ 1029 ]  
 
Draft Recommendation Q.3903 "Formalized presentation of testing results"     Telecommunication Administration Of The Russian Fe   Q8/11   2008-05-06
[ 1028 ]  
 
Proposal for update texts to section 6 of Y.ipsplit     ETRI   Q3/13   2008-05-06
[ 1027 ]  
 
Proposal for update terms in Y.ipsplit     ETRI   Q3/13   2008-05-04
[ 1026 ]  
 
Proposal for Presence enhancement in Y.NGN-R2-Reqts     China Telecom   Q2/13   2008-05-04
[ 1025 ]  
 
A Proposal to initiate a new study item on the use of IPv4(LSRR) in NGN     China Telecom, CATR   Q13/13   2008-05-04
[ 1024 ]  
 
Proposal for the study on IMS-based visual surveillance services over NGN     China Telecom   Q2/13   2008-05-04
[ 1023 ]  
 
Proposed texts for Y.NGN-R2-Reqts. to support visual surveillance service in NGN Release 2     China Telecom   Q2/13   2008-05-04
[ 1022 ]  
 
Proposal for supporting the visual surveillance service in NGN Release 2 Scope     China Telecom   Q1/13   2008-05-04
[ 1021 ]  
 
A proposal to clarify scenario of Ri interface and add texts to Q.3307.1     China Telecom, Huawei Technologies Co., Ltd.   Q5/11   2008-05-06
[ 1020 ]  
 
A proposal to initiate an ad-hoc new work item in Q8/11 for developing a monitoring parameters set for voice service in NGN     China Telecom   Q8/11   2008-05-04
[ 1019 ]  
 
A proposal to initiate an ad-hoc new work item in Q8/11 for developing a monitoring parameters set for NGN protocols     China Telecom   Q8/11   2008-05-04
[ 1018 ]  
 
Comments on" The Signalling Requirements and Protocol Profile for CRBT and CRT services"     China Telecom   Q2/11   2008-05-04
[ 1017 ]  
 
The Signalling Requirements for IP Centrex service     China Telecom   Q3/11   2008-05-04
[ 1016 ]  
 
Proposed modifications of Clause 7 of Y.USN-reqts     Nortel Networks (UK)   Q2/13   2008-05-04
[ 1015 ]  
 
Proposed Changes in Appendices in Y.mpm     ETRI   Q4/13   2008-05-04
[ 1014 ]  
 
Proposed Changes in the Clause 9 & 10 in Y.mpm     ETRI   Q4/13   2008-05-04
[ 1013 ]  
 
Proposed Changes in the Clause 7 and 8 in Y.mpm     ETRI   Q4/13   2008-05-04
[ 1012 ]  
 
Proposed Changes in the Clause 1, 2, 4, and 5 in Y.mpm     ETRI   Q4/13   2008-05-04
[ 1011 ]  
 
Proposed Appendix to Y.MCFArch: Mapping from 3GPP EPC architecture to NGN architecture     Industry Canada   Q3/13   2008-05-04
[ 1010 ]  
 
IdM Metasystem Baseline     Nortel Networks (USA)   Q15/13   2008-05-04
Results:302 total items.
Result page:  1 - 2 - 3 - 4 - 5 - 6 - 7  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-9-27