Unión Internacional de Telecomunicaciones   UIT
English  Français
 
Mapa Contáctenos Copia Imprimible
  Página principal : UIT-T : SG06 : Documentos de la reunión  Nuevo -  Busque los documentos de la reunión
   
UIT-T SG06  ALL (2007-11-19) 

UIT-T SG06

Planta exterior e instalaciones interiores relacionadas

Periodo de estudios 2005

Reunión  del 2007-11-19 al 2007-11-23

Lugar : Suiza [Ginebra]

Cartas Colectivas  Documents / Contributions
 
Número 
Título Origen AI/Cuestión
Fecha
[ 5 ]  
 
Reunión de la Comisión de Estudio 6, Ginebra, 19-23 de noviembre de 2007     SG 6     2007-09-17
 

 
Contribuciones  Documents / Contributions
 
Número 
Título Origen AI/Cuestión
Fecha
[ 49 ]  
 
Revised draft proposal for a new recommendation for optical cabling systems in buildings     France Telecom   Q2/6   2007-11-09
[ 48 ]  
 
Contribution for a Draft new Recommendation L.coloop "Developing the copper loop requirement, including indoor and structured cabling, for various access technologies"     Korea   Q5/6   2007-11-08
[ 47 ]  
 
Japanese experience on optical fiber joints for appendix of ITU-T Rec. L.12     NTT   Q9/6   2007-11-07
[ 46 ]  
 
Information about optical fibre identification technique for operation and maintenance of optical fibre communication networks     NTT   Q6/6   2007-11-07
[ 45 ]  
 
Proposed initial Updated proposal for a draft new for new ITU-T Recommendation L.iirud "Methods for Improved methods for installing, inspecting and repairing underground ducts"     Korea Telecom   Q2/6   2007-11-05
Documentos presentados : 5 de un total de 7  relacionaron a este reunión (vea más...)  

 
Documentos Temporales  Documents / Contributions
 
Número 
Título Origen AI/Cuestión
Fecha
[ 322-GEN ]  
 
Final list of participants     TSB   QALL/6   2007-11-23
[ 321-GEN ]  
 
OUTGOING LS - Draft LS to ITU-T SG4 on OSS requirements works     Rapporteur Q4/6   Q4/6   2007-11-22
[ 320-GEN ]  
 
First revised draft for Qx/6 for next Study Period     Rapporteur Q4/6   Q4/6   2007-11-22
[ 319-GEN ]  
(Rev.1) 
Draft Report of the fourth meeting of Study Group 6 "Outside plant and related indoor installations" (Geneva, 19-23 November 2007)     TSB   QALL/6   2007-11-23
[ 318-GEN ]  
 
OUTGOING LS - Reply to Q1/15 onupdate on Access Network activities in SG6     Liaison Officer to SG15   QALL/6   2007-11-22
Documentos presentados : 5 de un total de 61  relacionaron a este reunión (vea más...)  

 
Informe  Documents / Contributions
 
Número 
Título Origen AI/Cuestión
Fecha
[ 5 ]  
 
Report of the fifth meeting of Study Group 6 "Outside plant and related indoor installations" (Geneva, 19-23 November 2007)     SG 6   QALL/6   2007-12-21
 

 
Telecarga de múltiples documentos: Marcar las casillas correspondientes a los documentos seleccionados, a continuación pulsar "Telecargar"
   
 
Preferencias del usuario: 
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):
Páginas de navegación HTML  
Formatos  + Otros formatos
Idiomas (máximo 2)  + Multilingüe  
(E: inglés - F: francés - S: español - A: árabe - C: chino - R: ruso)

Pruebe ITU Translate, la herramienta de traducción automática de documentos
Comienzo de la página -  Comentarios -  Contáctenos -  Copyright © UIT 2008 Reservados todos los derechos
Contacto público :  TSB EDH
Actualizado el : 2024-8-9