Contributions |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 523 ]
|
Proposal on structure and contents of L.performance
|
China
|
Q19/5
|
2012-09-27 |
|
[ 522 ]
|
Proposal on write into the efficiency and no-load power requirements of China in L.UPA draft on Appendix II
|
China
|
Q21/5
|
2012-09-27 |
|
[ 521 ]
|
Contribution of Basic Configuration, Voltage/Current definition, Ripple and Ripple Noise Voltage measurement to the draft
|
China
|
Q21/5
|
2012-09-27 |
|
[ 520 ]
|
General requirements for minimum data set of data center energy management
|
Electronics and Telecommunications Research Institute (ETRI)
|
Q17/5
|
2012-09-26 |
|
[ 519 ]
|
L.ICT projects : some suggestions
|
France Télécom Orange
|
Q18/5
|
2012-09-26 |
|
[ 518 ]
|
Climate change adaptation, mitigation and Information and Communication Technologies (ICTs): the case of Ghana
|
Ghana
|
Q23/5
|
2012-09-26 |
|
[ 517 ]
|
Interworking solutions between EPS and ICT equipment
|
Telecom Italia S.p.A.
|
Q21/5
|
2012-09-26 |
|
[ 516 ]
|
Proposal for a Recommendation on Universal power Adaptor for non-stationary use
|
Telecom Italia S.p.A.
|
Q21/5
|
2012-09-25 |
|
[ 515 ]
|
Press Release from ANEC (consumers' association) on connector for mobile charging
|
Telecom Italia S.p.A.
|
Q21/5
|
2012-09-25 |
|
[ 514 ]
|
Contribution to Recommendation L methodology ICT Projects
|
European Union
|
Q18/5
|
2012-09-25 |
|
[ 513 ]
|
Proposal for preparing a new recommendation on an agreed eco-rating scheme for mobile phones
|
Telefónica, S.A.
|
Q18/5
|
2012-09-25 |
|
[ 512 ]
|
Examples of ICT Projects in the ICT sector
|
Telefónica, S.A.
|
Q18/5
|
2012-09-25 |
|
[ 511 ]
|
L.ICT in cities: aspects to be covered
|
France Télécom Orange
|
Q18/5
|
2012-09-25 |
|
[ 510 ]
|
Proposal for validation and verification activities to ITU-T L.methodology ICT projects
|
Electronics and Telecommunications Research Institute (ETRI)
|
Q18/5
|
2012-09-25 |
|
[ 509 ]
|
Proposal for resolving some of [Editor's note] issues of ITU-T L.methodology ICT projects
|
Electronics and Telecommunications Research Institute (ETRI)
|
Q18/5
|
2012-09-25 |
|
[ 508 ]
|
Proposal for addition of project reporting guidance to ITU-T L.methodology ICT projects
|
Electronics and Telecommunications Research Institute (ETRI)
|
Q18/5
|
2012-09-25 |
|
[ 507 ]
|
Proposal for updates of project results quantification for ITU-T L.methodology ICT projects
|
Electronics and Telecommunications Research Institute (ETRI)
|
Q18/5
|
2012-09-25 |
|
[ 506 ]
|
Proposal for updates of baseline scenario considerations for ITU-T L.methodology ICT projects
|
Electronics and Telecommunications Research Institute (ETRI)
|
Q18/5
|
2012-09-25 |
|
[ 505 ]
|
Proposal for additions and updates of terms and definitions of L.methodology ICT projects
|
Electronics and Telecommunications Research Institute (ETRI)
|
Q18/5
|
2012-09-25 |
|
[ 504 ]
|
Proposal of additional items and normative reference for draft recommendation L.architecture
|
Nippon Telegraph and Telephone Corporation (NTT)
|
Q19/5
|
2012-09-25 |
|
[ 503 ]
(Rev.1) |
Battery Standardisation (Universal Design) - Study Input & Conclusions
|
United Kingdom
|
Q21/5
|
2012-09-25 |
|
[ 502 ]
|
Proposal to modify for L.CPS_stationary_draft V005
|
Japan
|
Q21/5
|
2012-09-25 |
|
[ 501 ]
|
Proposal to modify for L.CPS_stationary_draft V005 - Proposal to modify of DC output interface characteristics
|
Japan
|
Q21/5
|
2012-09-25 |
|
[ 500 ]
|
Proposal to modify for L.CPS_stationary_draft V005 - Proposal to modify of Scope and basic function
|
Japan
|
Q21/5
|
2012-09-25 |
|
[ 499 ]
|
Proposal on ripple noise voltage and measuring method of CPS in L.CPS_stationary
|
Japan
|
Q21/5
|
2012-09-25 |
|
[ 498 ]
|
Proposal on no-load power consumption of CPS in L.CPS_stationary
|
Japan
|
Q21/5
|
2012-09-25 |
|
[ 497 ]
|
Proposal on average conversion efficiency and 10% partial load conversion efficiency of CPS in L.CPS_stationary
|
Japan
|
Q21/5
|
2012-09-25 |
|
[ 496 ]
|
Joint industry response to contribution C421
|
Motorola Mobility LLC
|
Q21/5
|
2012-09-25 |
|
[ 495 ]
|
A methodological framework for assessments of ICT solutions at a city level - some considerations for L.1440
|
Telefon AB - LM Ericsson
|
Q18/5
|
2012-09-25 |
|
[ 494 ]
|
Contribution to Recommendation ITU-T L-1410 & L-1420
|
European Union
|
Q18/5
|
2012-09-25 |
|
[ 493 ]
|
Discussion document on requirements for a website portal on 'ICT and adaptation to climate change'
|
Egypt
,
Kenya
,
United Kingdom
|
Q23/5
|
2012-09-25 |
|
[ 492 ]
|
Information about an ICT&CC-WG activity of APT Standardization Program Forum
|
Korea (Rep. of)
,
Thailand
|
Q21/5
|
2012-09-25 |
|
[ 491 ]
|
Methodology for assessment of GHG emission reduction enabled by ICT based Real-time Navigation Systems
|
Korea (Rep. of)
|
Q18/5
|
2012-09-25 |
|
[ 490 ]
|
Points to be clarified on the text "Cellular network with capacity transfer" proposed in C378(SG5, 2012)
|
The ITU Association of Japan
|
Q22/5
|
2012-09-25 |
|
[ 489 ]
|
Some proposals for next draft of L.1440
|
Telefon AB - LM Ericsson
|
Q18/5
|
2012-09-25 |
|
[ 488 ]
|
A case study for assessing environmental impact by Real-time Navigation Systems in Korea
|
Korea (Rep. of)
|
Q18/5
|
2012-09-25 |
|
[ 487 ]
(Rev.1) |
Presentations at TDAG, ASTAP and ITU-D SG2 on a plan to cost-effectively install optical cable infrastructure in rural and remote areas in developing countries
|
The ITU Association of Japan
|
Q22/5
|
2012-09-25 |
|
[ 486 ]
|
Experimental results for draft Recommendation of L.rareMetals-measurement, "Measurement method to characterize rare metals of ICT goods"
|
Korea (Rep. of)
|
Q21/5
|
2012-09-25 |
|
[ 485 ]
(Rev.1) |
Proposal for editorial and technical improvements to additionally refine ITU-T L.methodology ICT projects
|
Korea (Rep. of)
|
Q18/5
|
2012-09-25 |
|
[ 484 ]
|
Proposal for best practices for cloud data centers for the revision of ITU-T L.1300
|
Korea (Rep. of)
|
Q17/5
|
2012-09-25 |
|
[ 483 ]
|
Recent development on electronic waste (e-waste) and rare metals in Asia-Pacific Telecommunity
|
Korea (Rep. of)
,
Thailand
|
Q21/5
|
2012-09-25 |
|
[ 482 ]
(Rev.1) |
Networking Devices and Power states
|
Cisco Systems, Inc.
,
Juniper Networks
|
Q17/5
|
2012-09-25 |
|
[ 481 ]
(Rev.1) |
Handbook on energy efficiency for telecom equipment
|
Cisco Systems, Inc.
|
Q17/5
|
2012-09-24 |
|
[ 480 ]
|
Leveraging and enhancing the ICT Environmental sustainability : Options and Priorities
|
Alcatel-Lucent France
|
Q18/5
|
2012-09-24 |
|
[ 479 ]
|
Information regarding review of L.1410 (GNS) and L.1420 (ORG) performed by TENNG consortia for the EC road-testing of standards
|
Telefon AB - LM Ericsson
|
Q18/5
|
2012-09-24 |
|
[ 478 ]
(Rev.1) |
Proposed Study on environment protection and recycling solution for Li-ion and Li-ion polymer batteries for mobile phones
|
Research in Motion
|
Q21/5
|
2012-09-20 |
|
[ 477 ]
|
Handling of TD 1169 and a proposed way forward
|
Canada
|
Q21/5
|
2012-09-20 |
|
[ 476 ]
|
Contribution for the Handbook on best practices - Setting up a low cost sustainable telecommunication infrastructure for rural communications in developing countries
|
Russian Federation
|
Q22/5
|
2012-09-20 |
|
[ 475 ]
|
Proposal for assessment of environmental impact saving and rebound effect discussion
|
France Télécom Orange
|
Q21/5
|
2012-09-17 |
|
[ 474 ]
(Rev.1) |
Installation of telecommunication equipment on existing low voltage utility poles in urban areas
|
Greece
|
Q5/5
|
2012-03-30 |
Results:520 total items. Result page:
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11
- Next
|
Multiple Document Download: Formats and Languages to be included (when available):