Temporary Documents
(WP2)
|
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 143-WP2 ]
|
Draft Questionnaire on "the requirements of low-cost optical cable backhaul solution toward realistically closing the digital divide in a timely manner"
|
Rapporteur Q16/15
|
Q16/15
|
2014-12-03 |
|
[ 142-WP2 ]
|
LS/o on transfer of Recommendation ITU-T L.71 and Handbook "Compendium of Cable Measurement Methods, 1984" (to ITU-T SG5)
|
Rapporteur Q16/15
|
Q16/15
|
2014-12-03 |
|
[ 141-WP2 ]
(Rev.1) |
LS/o on draft revised ITU-T Recommendations for Consent at ITU-T (to IEC SC86A WG3)
|
Rapporteur Q16/15
|
Q16/15
|
2014-12-03 |
|
[ 140-WP2 ]
(Rev.1) |
LS/o on revision considerations for Recommendation ITU-T L.60, "Construction of optical/metallic hybrid cables" (to IEC SC86A WG3)
|
Rapporteur Q16/15
|
Q16/15
|
2014-12-03 |
|
[ 139-WP2 ]
(Rev.1) |
LS/o on revision considerations for Recommendation ITU-T L.59, "Optical fibre cables for indoor applications" (to IEC SC86A WG3)
|
Rapporteur Q16/15
|
Q16/15
|
2014-12-03 |
|
[ 138-WP2 ]
(Rev.1) |
Plan for the revision of the ITU-T Handbook "Optical Fibres, Cables and Systems"
|
Chairman WP2/15
|
Q8/15, Q7/15, Q6/15, Q5/15, Q17/15, Q16/15
|
2014-12-03 |
|
[ 137-WP2 ]
|
Plan for harmonization of Recommendations ITU-T L.10, L.26 and L.43 with IEC in view of consent at next ITU-T SG15 meeting (22 June - 3 July 2015)
|
Chairman WP2/15
|
Q16/15
|
2014-12-03 |
|
[ 136-WP2 ]
|
LS/o on field installable/mountable connectors (reply to IEC-TC86-SC86B-LS002) [to IEC SC86B]
|
Rapporteur Q7/15
|
Q7/15
|
2014-12-02 |
|
[ 135-WP2 ]
|
Draft revised Recommendation ITU-T G.671 (latest draft with Editor's comments)
|
Editor G.671
|
Q7/15
|
2014-11-28 |
|
[ 134-WP2 ]
|
L.fmc: Correspondence summary (September - November 2014)
|
Editor L.fmc
|
Q7/15
|
2014-11-27 |
|
[ 133-WP2 ]
|
L.36: Correspondence summary (April - November 2014)
|
Editor L.36
|
Q7/15
|
2014-11-27 |
|
[ 132-WP2 ]
(Rev.1) |
LS/o/r on treatment about FG-DR&NRR deliverables (reply to SG2-LS056) [to ITU T SG2]
|
Rapporteur Q17/15
|
Q17/15
|
2014-11-26 |
|
[ 131-WP2 ]
|
Draft new Recommendation ITU-T L.dm-nrr-mdru (initial draft), "Disaster management for improving network resilience and recovery with movable and deployable ICT resource units"
|
Rapporteur Q17/15
|
Q17/15
|
2014-11-26 |
|
[ 130-WP2 ]
|
Draft new Recommendation ITU-T L.nrr-frm (initial draft), "Framework of disaster management for network resilience and recovery"
|
Rapporteur Q17/15
|
Q17/15
|
2014-11-26 |
|
[ 129-WP2 ]
|
Agenda of the joint Q5, 6/15 meeting (Geneva, 26 November 2014)
|
Rapporteurs Q5, 6/15
|
Q6/15, Q5/15
|
2014-11-26 |
|
[ 128-WP2 ]
|
Q8/15: Status report
|
Rapporteur Q8/15
|
Q8/15
|
2014-11-24 |
|
[ 127-WP2 ]
|
G.977: Correspondence summary
|
Editor G.977
|
Q8/15
|
2014-11-24 |
|
[ 126-WP2 ]
|
LS/i on performance testing for field installable/mountable connectors [from IEC SC86B]
|
IEC SC86B
|
Q7/15
|
2014-11-22 |
|
[ 125-WP2 ]
|
G.698.3 v1.0.3: Proposed application parameters
|
Editor G.698.3
|
Q6/15
|
2014-11-22 |
|
[ 124-WP2 ]
|
Response to the questionnaire on "Plant solutions for FTTdp (fibre-to-the-distribution point) architecture"
|
Rapporteur Q16/15
|
Q16/15
|
2014-11-21 |
|
[ 123-WP2 ]
|
G.698.2: Overview of contributions proposing parameters and related test methods for 40G and 100G modulation formats in G.698.2 Version 0.9.03
|
Editor G.698.2
|
Q6/15
|
2014-11-21 |
|
[ 122-WP2 ]
|
Draft revised Recommendation ITU-T G.697 (latest draft, v3.03)
|
Editor G.697
|
Q6/15
|
2014-11-21 |
|
[ 121-WP2 ]
|
Draft revised Recommendation ITU-T G.680 (latest draft, v1.0.6)
|
Editor G.680
|
Q6/15
|
2014-11-21 |
|
[ 120-WP2 ]
(Rev.1) |
Draft revised ITU-T Handbook "Optical Fibres, Cables and Systems"
|
Chairman WP2/15
|
Q8/15, Q7/15, Q6/15, Q5/15, Q17/15, Q16/15
|
2014-11-20 |
|
[ 119-WP2 ]
|
Draft revised ITU-T G-Suppl.39 (latest draft, v5.0.2)
|
Editor G-Suppl.39
|
Q6/15
|
2014-11-20 |
|
[ 118-WP2 ]
|
Draft new Recommendation ITU-T G.metro (latest draft)
|
Editor G.metro
|
Q6/15
|
2014-11-15 |
|
[ 117-WP2 ]
|
L.53 (Rev): Correspondence summary
|
Editor L.53
|
Q17/15
|
2014-11-13 |
|
[ 116-WP2 ]
|
G.972: Living list
|
Editor G.972
|
Q8/15
|
2014-11-11 |
|
[ 115-WP2 ]
|
Proposed application parameters for G.959.1 version 6.0.2
|
Editor G.959.1
|
Q6/15
|
2014-11-11 |
|
[ 114-WP2 ]
|
Draft revised Recommendation ITU-T G.959.1 (version 6.0.3)
|
Editor G.959.1
|
Q6/15
|
2014-11-11 |
|
[ 113-WP2 ]
|
G.664: Updated list of references due to availability of IEC 60825-1, Ed. 3.0
|
Editor G.664
|
Q6/15
|
2014-11-11 |
|
[ 112-WP2 ]
|
G.695: Proposed application parameters (version 5.0.3)
|
G.695
|
Q6/15
|
2014-11-11 |
|
[ 111-WP2 ]
|
Draft new Recommendation ITU-T L.fmc (latest draft)
|
Editor L.fmc
|
Q7/15
|
2014-11-10 |
|
[ 110-WP2 ]
|
Draft revised Recommendation ITU-T G.672 (version 1.0.2)
|
Editor G.672
|
Q7/15
|
2014-11-10 |
|
[ 109-WP2 ]
|
Withdrawn by submitter
|
N/A
|
|
2014-11-10 |
|
[ 108-WP2 ]
|
Response to the questionnaire on "Microducts technology and its application in the access network"
|
Rapporteur Q16/15
|
Q16/15
|
2014-11-10 |
|
[ 107-WP2 ]
|
Correspondence summary of the new study item regarding the node elements in optical fibre infrastructure management systems
|
Correspondence leaders
|
Q16/15
|
2014-11-10 |
|
[ 106-WP2 ]
|
100G application for submarine systems: Correspondence summary
|
Correspondence leader, 100G application for SCs
|
Q8/15
|
2014-11-10 |
|
[ 105-WP2 ]
|
G.metro: Correspondence summary
|
G.metro Correspondence activity coordinator
|
Q6/15
|
2014-11-10 |
|
[ 104-WP2 ]
|
G.652 and G.657: Correspondence activity (July 2014 to November 2014)
|
Editor G.652, G.657
|
Q6/15, Q5/15
|
2014-11-10 |
|
[ 103-WP2 ]
|
Revision plan for ITU-T L-series Recommendations and Q16/15 Handbooks
|
Rapporteur Q16/15
|
Q16/15
|
2014-11-07 |
|
[ 102-WP2 ]
|
Draft revised Recommendation ITU-T G.650.2 (latest draft)
|
Editor G.650.2
|
Q5/15
|
2014-11-06 |
|
[ 101-WP2 ]
(Rev.1) |
Correspondence activity for revising ITU-T G.650.2, June to October 2014
|
Editor G.650.2
|
Q5/15
|
2014-11-05 |
|
[ 100-WP2 ]
|
WP2/15 proposed interim activities (for Agreement, December 2014)
|
Chairman WP2/15
|
Q8/15, Q7/15, Q6/15, Q5/15, Q17/15, Q16/15
|
2014-11-03 |
|
[ 99-WP2 ]
(Rev.1) |
WP2/15 outgoing Liaison Statements (for Agreement, December 2014)
|
Chairman WP2/15
|
Q8/15, Q7/15, Q6/15, Q5/15, Q17/15, Q16/15
|
2014-11-03 |
|
[ 98-WP2 ]
(Rev.1-4) |
WP2/15 Work Programme updates (for Agreement, December 2014)
|
Chairman WP2/15
|
Q8/15, Q7/15, Q6/15, Q5/15, Q17/15, Q16/15
|
2014-11-03 |
|
[ 97-WP2 ]
(Rev.1-2) |
WP2/15 texts for Approval, Determination, Consent and Agreement (December 2014)
|
Chairman WP2/15
|
Q8/15, Q7/15, Q6/15, Q5/15, Q17/15, Q16/15
|
2014-11-03 |
|
[ 96-WP2 ]
(Rev.1) |
WP2/15 meeting report (Geneva, 24 November - 5 December 2014)
|
Chairman WP2/15
|
Q8/15, Q7/15, Q6/15, Q5/15, Q17/15, Q16/15
|
2014-11-03 |
|
[ 95-WP2 ]
(Rev.1-2) |
WP2/15 meeting agenda (Geneva, 24 November - 5 December 2014)
|
Chairman WP2/15
|
Q8/15, Q7/15, Q6/15, Q5/15, Q17/15, Q16/15
|
2014-11-03 |
|
[ 94-WP2 ]
(Rev.1-2) |
Report of the Q17/15 meeting (Geneva, November - December 2014)
|
Rapporteur Q17/15
|
Q17/15
|
2014-11-03 |
Results:63 total items. Result page:
1 -
2
- Next
|
Multiple Document Download: Formats and Languages to be included (when available):