International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 9 : Meeting Documents  Recently posted -  Search Meeting Documents
   
ITU-T SG 9  ALL (2021-01-26) 

ITU-T SG 9

Broadband cable and TV

Study Period 2017

Meeting  from 2021-01-26 to 2021-01-26

held in E-Meeting

Collective Letters  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 8 ]  
 
Meeting of Working Party 1/9; fully virtual meeting, 26 January 2021 (0900 to 1030 hours)     TSB   Q4/9, Q2/9, Q1/9   2020-11-17
 

 
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 152 ]  
(Rev.1) 
Proposal to consent draft new Recommendation J.rfip-switching-req "Requirements of RF/IP switching system"     Japan Cable Laboratories   Q1/9   2021-01-13
[ 151 ]  
(Rev.1) 
Proposal to consent draft new Recommendation J.cable-rf-ip "Requirements of cable network for RF and IP secondary distribution of television programmes"     Japan Cable Laboratories   Q1/9   2021-01-12
 

 
Temporary Documents  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 987-GEN ]  
(Rev.1) 
LS/o on AAP Consent of draft new Recommendation ITU-T J.481 (ex J.cable-rf-ip) and J.482 (ex J.rfip-switching-req) [to ETSI TC Cable, ITU-T Q13/SG16, CableLabs, SCTE]     Rapporteur Q1/9   Q1/9   2021-01-21
[ 986-GEN ]  
 
LS/o/r on start of new draft Recommendations J.rfip-switching "RF/IP adaptive video distribution scheme over cable television networks" (reply to SG16-LS195) [to ITU-T SG16]     Rapporteur Q1/9   Q1/9   2021-01-21
[ 985-GEN ]  
 
LS/o/r on the current text of new draft Recommendations J.cable-rf-ip "Requirements of cable network for RF and IP secondary distribution of television programmes" (reply to SG16-LS196) [to ITU-T SG16]     Rapporteur Q1/9   Q1/9   2021-01-21
[ 984-GEN ]  
 
LS/o on withdrawal of IEEE Std 802.1D-2004 [to CableLabs]     Rapporteur Q1/9   Q1/9   2021-01-21
[ 983-GEN ]  
 
Output - draft new Recommendation ITU-T J.rfip-switching-arch "Architecture and functional specification of RF/IP switching system" (E-meeting, 20 January 2021)     Editor J.rfip-switching-arch   Q1/9   2021-01-21
Currently viewing 5 of 25  documents related to this meeting (more...)  

 
Reports  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 21 ]  
 
Report of Working Party 1/9 meeting (E-meeting, 26 January 2021)     Acting Chairman WP1/9   Q4/9, Q2/9, Q1/9   2021-01-27
 

 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-5-2