Contributions |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 2862 ]
|
G.sup.slicing: General text on end-to-end network slicing
|
Huawei Technologies Co., Ltd. (China)
,
Huawei Technologies Switzerland
,
Maxlinear Inc (United States)
|
Q2/15
|
2021-11-23 |
|
[ 2861 ]
|
Appendix on Equipment/Network Analysis/Budget [G.8273.4]
|
Microchip Technology Inc. (United States)
|
Q13/15
|
2021-11-23 |
|
[ 2860 ]
|
G.9804: Flex-rate PON Downstream
|
Nokia Corporation (Finland)
|
Q2/15
|
2021-11-23 |
|
[ 2859 ]
|
PTP Connection Monitoring with portDS.networkMonitor [G.8275.1]
|
Microchip Technology Inc. (United States)
|
Q13/15
|
2021-11-23 |
|
[ 2858 ]
|
G.988: An issue with references to PON Recommendations
|
Maxlinear Inc (United States)
|
Q2/15
|
2021-11-23 |
|
[ 2857 ]
|
Multi layer network control figure in draft G.7702
|
Infinera Corporation (United States)
|
Q14/15, Q12/15
|
2021-11-23 |
|
[ 2856 ]
(Rev.1) |
MGfast: Proposal for a bi-directional DBR
|
Broadcom Corporation (United States)
,
Maxlinear Inc (United States)
|
Q4/15
|
2021-11-23 |
|
[ 2855 ]
(Rev.1) |
Aware mapping and Figure A.1 in G.8023 Amd 1
|
China Information Communication Technologies Group
,
Huawei Technologies Co., Ltd. (China)
,
Huawei Technologies Düsseldorf GmbH (Germany)
,
Nokia USA (United States)
|
Q11/15
|
2021-11-23 |
|
[ 2854 ]
|
Editorial corrections to G.8032 Figure 10-1
|
Nokia USA (United States)
|
Q10/15
|
2021-11-23 |
|
[ 2853 ]
|
Description of interleaving/de-interleaving processes in FlexO-x to FlexO adaptation
|
Nokia USA (United States)
|
Q11/15
|
2021-11-23 |
|
[ 2852 ]
|
Percentage difference between full-rate and underclocked ODU25 and ODU50
|
Nokia USA (United States)
|
Q11/15
|
2021-11-23 |
|
[ 2851 ]
|
FlexO-x adaptation functions
|
Nokia USA (United States)
|
Q11/15
|
2021-11-23 |
|
[ 2850 ]
|
Proposed resolution to editor's note in G.8023 Amd 1 regarding MI signals
|
Nokia USA (United States)
|
Q11/15
|
2021-11-23 |
|
[ 2849 ]
|
Proposed updates to G.8021 to address Study Point 29 (on ETH AI)
|
Nokia USA (United States)
|
Q10/15
|
2021-11-23 |
|
[ 2848 ]
|
Modeling FlexOsec as a sublayer
|
Nokia USA (United States)
|
Q12/15, Q11/15
|
2021-11-23 |
|
[ 2847 ]
|
Proposed updates to G.8021 to address Study Point 26 (on EPL Option 2)
|
Nokia USA (United States)
|
Q10/15
|
2021-11-23 |
|
[ 2846 ]
|
Proposed updates to ODUkP to ETH adaptation functions in G.798
|
Nokia USA (United States)
|
Q11/15
|
2021-11-23 |
|
[ 2845 ]
|
Proposed clarifications to G.709 clauses 17.10 and 17.11
|
Nokia USA (United States)
|
Q11/15
|
2021-11-23 |
|
[ 2844 ]
|
Proposed updates to G.8021 to address Study Point 28 (top of Clause 9) and other aspects
|
Nokia USA (United States)
|
Q10/15
|
2021-11-23 |
|
[ 2843 ]
(Rev.1) |
MGFast: Support of DTFO in P2MP for TDMA/FDMA scheme
|
Broadcom Corporation (United States)
,
Nokia Corporation (Finland)
|
Q4/15
|
2021-11-23 |
|
[ 2842 ]
|
MTN path sink processing of L sequence messages
|
Nokia USA (United States)
|
Q11/15
|
2021-11-23 |
|
[ 2841 ]
(Rev.1) |
MGFast: Update to DBR text
|
Broadcom Corporation (United States)
,
Maxlinear Inc (United States)
,
Nokia Corporation (Finland)
|
Q4/15
|
2021-11-23 |
|
[ 2840 ]
|
T-BC transients [G.8273.2]
|
Nokia Corporation (Finland)
|
Q13/15
|
2021-11-23 |
|
[ 2839 ]
|
Application of Alternate Master to Monitoring Use Cases
|
Nokia USA (United States)
|
Q13/15
|
2021-11-23 |
|
[ 2838 ]
|
OTN support for serial OTU4 interfaces
|
Nokia Corporation (Finland)
,
Nokia USA (United States)
|
Q6/15, Q11/15
|
2021-11-23 |
|
[ 2837 ]
|
Network Limits considerations [G.8271.2]
|
Nokia Corporation (Finland)
|
Q13/15
|
2021-11-23 |
|
[ 2836 ]
|
G.mgfast, G.ploam: DTA Reporting
|
Adaptive Spectrum and Signal Alignment (ASSIA) Inc. (United States)
,
ADTRAN (United States)
,
Broadcom Corporation (United States)
,
Nokia Corporation (Finland)
|
Q4/15
|
2021-11-23 |
|
[ 2835 ]
|
Inclusion of interfering traffic in PTP performance testing [G.8273]
|
Calnex Solutions plc. (United Kingdom)
,
Nokia USA (United States)
|
Q13/15
|
2021-11-23 |
|
[ 2834 ]
|
Proposals for 400G application codes in G.698.2
|
Huawei Technologies Düsseldorf GmbH (Germany)
|
Q6/15
|
2021-11-23 |
|
[ 2833 ]
|
Maximum Inter-Message Interval [G.8275.2]
|
Nokia Corporation (Finland)
|
Q13/15
|
2021-11-23 |
|
[ 2832 ]
(Rev.1) |
G.hn: Working text updates for TP/GHN
|
Maxlinear Inc (United States)
|
Q18/15
|
2021-11-23 |
|
[ 2831 ]
|
Maximum Inter-Message Interval [G.8275.1]
|
Nokia Corporation (Finland)
|
Q13/15
|
2021-11-23 |
|
[ 2830 ]
|
G.9806 Higher Speed BiDi options
|
Futurewei Technologies US R&D Center (United States)
|
Q2/15
|
2021-11-23 |
|
[ 2829 ]
|
State diagram study ITU-T G.8275.1.
|
Orange (France)
|
Q13/15
|
2021-11-23 |
|
[ 2828 ]
|
G.hn in the access/fibre extension context. Proposal of updating the Technical Paper
|
Maxlinear Inc (United States)
|
Q18/15
|
2021-11-23 |
|
[ 2827 ]
(Rev.1) |
G.sup.slicing Slicing Framework
|
Futurewei Technologies US R&D Center (United States)
|
Q2/15, Q12/15, Q11/15
|
2021-11-23 |
|
[ 2826 ]
|
Clarification of scope of ITU-T Rec. Series G Supplement Slicing
|
Nokia Corporation (Finland)
,
Oki Electric Industry Company Ltd. (OKI) (Japan)
,
Vodafone Group Services Ltd (United Kingdom)
|
Q2/15
|
2021-11-23 |
|
[ 2825 ]
|
New clause 9.4 structure for draft G.8321 (for consent)
|
Nokia USA (United States)
|
Q11/15
|
2021-11-23 |
|
[ 2824 ]
|
PTP Monitoring with Alternate Master
|
Nokia Corporation (Finland)
|
Q13/15
|
2021-11-23 |
|
[ 2823 ]
|
B400G Next Steps
|
Nokia USA (United States)
|
Q11/15
|
2021-11-23 |
|
[ 2822 ]
|
Comments on draft G.8331 (for consent)
|
Nokia USA (United States)
|
Q11/15
|
2021-11-23 |
|
[ 2821 ]
(Rev.1) |
G.hn in the access/fibre extension context. Proposal of working text for an annex
|
Maxlinear Inc (United States)
|
Q18/15
|
2021-11-23 |
|
[ 2820 ]
|
G.hn: Parameters definition proposal
|
Maxlinear Inc (United States)
|
Q18/15
|
2021-11-23 |
|
[ 2819 ]
(Rev.1) |
Miscellaneous updates for ITU-T Rec. Series G Supplement Slicing
|
Nokia Corporation (Finland)
|
Q2/15
|
2021-11-23 |
|
[ 2818 ]
|
Proposal to new ITU-T G.Sup.XRP "Passive optical network supporting extended reality service"
|
China Information Communication Technologies Group
,
China Mobile Communications Co. Ltd.
,
China Telecommunications Corporation
,
China Unicom
,
Huawei Technologies Co., Ltd. (China)
,
Ministry of Industry and Information Technology (MIIT) (China)
,
Nokia Shanghai Bell Co. Ltd. (China)
,
ZTE Corporation (China)
|
Q2/15
|
2021-11-23 |
|
[ 2817 ]
|
Proposal to new ITU-T G.Sup.eOLT " Enhanced optical line termination integrated with IT technology"
|
China Information Communication Technologies Group
,
China Mobile Communications Co. Ltd.
,
China Telecommunications Corporation
,
China Unicom
,
Huawei Technologies Co., Ltd. (China)
,
Ministry of Industry and Information Technology (MIIT) (China)
,
Nokia Shanghai Bell Co. Ltd. (China)
,
ZTE Corporation (China)
|
Q2/15
|
2021-11-23 |
|
[ 2816 ]
|
Considerations on hitless resizing of sub-1G clients
|
Nokia USA (United States)
|
Q11/15
|
2021-11-23 |
|
[ 2815 ]
|
MTN Path OAM Acceptance Window and Error Handling
|
Nokia USA (United States)
|
Q11/15
|
2021-11-23 |
|
[ 2814 ]
|
MTN sub-1G solution categories and opportunities for commonality with OTN sub-1G mappings
|
Nokia USA (United States)
|
Q11/15
|
2021-11-23 |
|
[ 2813 ]
|
Considerations on sub-1G transport granularity
|
Nokia USA (United States)
|
Q11/15
|
2021-11-23 |
Results:256 total items. Result page:
1 -
2 -
3 -
4 -
5 -
6
- Next
|
Multiple Document Download: Formats and Languages to be included (when available):